Lecture(9) Instructor : Dr. Abed Al-Majed Nassar 2009-2010.

Slides:



Advertisements
Similar presentations
Environmental Assessment in Nova Scotia
Advertisements

Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
Environmental Impact Assessment
HEADQUARTERS Strategic Environmental Assessment ”SEA is a systematic process for evaluating the environmental consequences of proposed policy, plan or.
Environmental Impact Assessment Myriam Raiche November 8, 2007.
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
EIAScreening5(Gajaseni, 2007) 1 EIA - Operating Principles.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
Action Implementation and Monitoring A risk in PHN practice is that so much attention can be devoted to development of objectives and planning to address.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
ENVIRONMENTAL MANAGEMENT PLAN
Air Quality Significance Criteria Dr Claire Holman LLP Director.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
SOCIAL IMPACT ASSESSMENT. WHAT IS SOCIAL IMPACT ASSESSMENT The systematic analysis in advance of development or policy changes that will bring social.
Wenxin Zhang Department of Civic Design University of Liverpool
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Protection Against Occupational Exposure
WRC 2 World Reconstruction Conference 2 Resilient Recovery- an imperative for sustainable development Conference Objective To advance consensus on resilient.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
Aberdeenshire Local Development Plan 2016 Identification of issues.
The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
UNEP Training Resource Manual Topic 13 Slide 1 Aims and objectives of SIA are to: F analyse how proposals affect people F identify and mitigate adverse.
ERT 417 WASTE TREATMENT IN BIOPROCESS INDUSTRY W ASTE M INIMIZATION & M ANAGEMENT.
Decision making process / basic options assessment Mercury Storage and Disposal LAC Two Countries Project Gustavo Solórzano Ochoa, Consultan t Montevideo,
Basic Concepts for Assessing Environmental Impacts.
Environmental auditing
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
1 February 2005 Briefing Sessions Draft Regulations Using Water for Recreational Purposes.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Environmental Management System Definitions
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
Addressing Cumulative Impacts of Pollution: A CEQA Perspective A Forum Presented by the Contra Costa County Hazardous Materials Commission December 4,
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Environmental Impact Assessment in the Slovak republic.
LOCAL ENVIRONMENTAL ACTION PROGRAMMES (LEAPs) Succesfull SEA for local planning.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
SEA in the Czech Republic Prague, 24 September 2008.
Introduction to SEPA The Scottish Environment Agency For CaSPr Waste Workshop Glasgow 19 October 2006 Claudette Hudes NetRegs Team Leader.
REMEDIATION OF CONTAMINATED LAND IN SOUTH AFRICA Part 8 of the Waste Act Ms Mishelle Govender Chemicals and Waste Management.
Proposition 1 Workshop: the Grant Application Process July 2015.
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
ENVIRONMENTAL COMPLIANCE STRATEGIES’ ROLE AND IMPACT, ALTERNATIVES AVAILABLE TO SELF POLICE, OR MONITOR COMPLIANCE.
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
E NVIRONMENTAL A UDIT By- Prajyoti P. Upganlawar Faculty, Civil engineering department, S.P.B Patel Engineering College.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
EIA (Environmental Impact Assessment)
Lecture-18: EIA (Environmental Impact Assessment) Course Instructor: Md Asif Rahman (ASR) Lecturer, Department of Mathematics and Natural Sciences (MNS)
Environmental Safeguards
The Feasibility Study: something we already know
Infrastructure planning and management
ENVIRONMENTAL ASSESSMENT TOOLS
Overview What is the CEQA environmental review process?
5. Impact Assessment World Café: Social impact assessment
Relationship between World Bank and Romanian EA requirements
Strategic Environmental Assessment (SEA)
Presentation transcript:

Lecture(9) Instructor : Dr. Abed Al-Majed Nassar

Environmental impact assessment Definition An Environmental Impact Assessment (EIA) is an assessment of the possible impact—positive or negative—that a proposed project may have on the environment, together consisting of the natural, social and economic aspects.

Purpose of EIA The purpose of the assessment is to ensure that decision makers consider the ensuing environmental impacts to decide whether to proceed with the project. The International Association for Impact Assessment (IAIA) defines an environmental impact assessment as "the process of identifying, predicting, evaluating and mitigating the biophysical, social, and other relevant effects of development proposals prior to major decisions being taken and commitments made. International Association for Impact Assessment biophysical The purpose of the assessment is to ensure that decision makers consider the ensuing environmental impacts to decide whether to proceed with the project. The International Association for Impact Assessment (IAIA) defines an environmental impact assessment as "the process of identifying, predicting, evaluating and mitigating the biophysical, social, and other relevant effects of development proposals prior to major decisions being taken and commitments made. International Association for Impact Assessment biophysical

Social Impact assessment (SIA) Social impact assessment includes the processes of analyzing, monitoring and managing the intended and unintended social consequences, both positive and negative, of planned interventions (policies, programs, plans, projects) and any social change processes invoked by those interventions.

SIA Purpose Its primary purpose is to bring about a more sustainable and equitable biophysical and human environment.

Action have a significant Effect on the Environment 1 Change in air quality, ground and surface water quality, traffic and noise level 2 Increasing of solid waste production, leaching, flooding and erosion 3 A major change in the use of either the quantity or type of energy 4 The creation of hazardous to human health 5 The encouraging or attracting of a large number of people to place to place for more than a few days. Compared with the same number of people who would come to such a place absent the action 6 Changes in two or more elements of the environment, no one of which has a significant effect on the environment, but when considered together result in an adverse effect on the environment.

Nature of an environment With project Environmental Impact Without project Time Project initiated

Factor for determining whether an impact is significant Quantitative or qualitative of the likihood that the impact will occur; most estimates are given qualitatively using phrases such as “highly likely” or “ possible but not likely” Probability of occurrence Quantitative or qualitative estimate of size extent of the impact Magnitude The period of time the impact, if it occurs, can be expected to last (e.g., decades or more, years, months, days Duration Whether the impact can be reversed through human action or naturally Reversibility The existence of local or national laws or international treaties that specifically promote or disallow type of impact Relevance to legal mandate Whether this impact (adverse or beneficial) contributes to (or mitigates against) the equitable of the environmental risks and benefits Social distribution of risks and benefits

Stakeholders in the ESIA 1 The project proponent and/or developer 2 Teams of specialists (possibly including independent consultants) 3 Relevant local public authorities, government departments and government agencies 4 External reviewers 5 Financial institutions 6 Local residents and communities 7 NGOs and community interest groups 8 Other institutional bodies, such as regional development forums and resource management organizations.

Specialist Related to Environmental Assessment Natural ResourcesSpecialist Air Air quality/pollution analyst Air pollution control engineer Noise expert land Soil engineer Engineering geologist Water Hydrologist Civil/sanitary engineer Chemist Human Social planner Economist Transportation planner Urban planner

Environmental categories for Bureau Projects

Relationship between land and water quality

Comparison of project alternatives involving environmental and social impact

Environmental criteria relevant to irrigation projects

Factors in selection of method for comparing Environmental Impacts of alternatives Is the analysis primarily a decision, an information, or a regulatory compliance documents Application Are alternatives fundamentally or incrementally different Alternatives Does the role of the public in the analysis involve substantial preparation of studies, especially those destined for public review Public Involvement

How much effort, skill, money, and data and what computer skills are available Resources Is there an announced project schedule ? Have the officials in charge already announces a starting date ? A completion date ? Are there remotely realistic ? Have they allocated at least the minimum preparation and processing times (generally prescribed) Time Is the preparer familiar with both the type of action contemplated and physical site Familiarity

How the big of the issue being dealt with? Issue significance Are the activities known to be controversial Controversy Are choic es limit ed by agen cy proc edur al or form at requi reme nts Administrative constraints