G.Sirri – INFN Bologna Videoconf 2008-03-06 Gluing machine 120 - 170 10 - 20 New solution under test: rigid plastic frame instead of lateral tapes and.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

Gluing Tests - DIPTEM Genova - Adhesives Shear tests with four different adhesive types: Adhesive tape NITTO DENKO 30 µm thick Adhesive tape NITTO DENKO.
Custom Trays Individualized trays for making final impressions
TRAYS.
MAGIC II Mirrors and reflector M. Doro Udine. MAGIC Collaboration Meeting. 2006/05/10-13.
Status Update on Mechanical Prototype in Rome November 6,
Edge Scanning: new plate design for the European Scanning System G. Sirri for Bologna group.
Placing glue dots 18 x 18 (324) dots on 5mm grid takes ~5min.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
May 5, 2004H.J. Krebs LST Installation Readiness Review Brass Absorber Production H.J. Krebs May 5, 2004.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Feb 2013 Schelling Anlagenbau GmbH. Schelling in 1950.
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
Demonstrate how anthropometric data informs ergonomic design.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Hybrid Integrated Circuit
G.Sirri – INFN Bologna videconf Fiducial Mark Finding with ESS 1/6 VersionDateBinarySourceConfigNote zip same as 62 Recommended.
Develop an understanding for the need of ergonomic design. Develop an understanding of how to calculate an average size using anthropometric data Learning.
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
February 2011 John R. Rastetter. PVC Disposal Issues Polyvinyl chloride (PVC) is the primary component in today's plate mounting material, like most plastics,
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
Emulsion Gluing Bologna Group Outline: - Adhesive tape - PVC frames - Vacuum supports for emulsion - 2 nd gluing machine.
Bologna Report M. Pozzato on behalf of Bologna Group Cetara Meeting – 13/09/2010.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Develop an understanding for the need of ergonomic design. Develop an understanding of how to calculate an average size using anthropometric data Learning.
PLATE CHANGER for OIL microscopes Gabriele Sirri INFN Bologna for INFN Bologna and LNGS.
Status of European Scanning System (Bari, Bern, Bologna, Lyon, Napoli, Neuchatel, Roma, Salerno) The final fast version is ready and working up to 20 cm.
G.Sirri – INFN Bologna 1/19 Lateral X-ray marks finding with ESS  Goal: implementation of the lateral mark finding in the ESS software  First Test: Plate-to-plate.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Brick gas tightness & emulsion-lead compatibility Opera Collaboration Meeting Hamburg, June 2004 F.Laudisio, G.Romano, C.Sirignano Salerno Emulsion.
G. Sirri - Bologna videoconf /9 Lateral X-rays with ESS  Goal: implementation of the lateral mark finding in the ESS software  test version.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Visit to Heidelberg Loek Ceelie Henk Schuijlenburg.
Gluing machine (scanning at the edge…) G. Sirri for Bologna Group.
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
TecnoCut PlateChanger Set Up / videoconferenceG.Sirri - INFN Bologna1 HARDWARE (complete):  both glued / not glued emulsion setup  cabling.
Shear test with irradiated samples NA62 - DIPTEM Genova – UCL
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Homework: Use the information that you gathered this week to draw out your plan view working drawing, 1:1 scale. Use sheet 6. Hand in next week. Start.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
appseal ® STP Acrylic based elastomeric strip Areas of application: (A) Over Construction joints. (B) Over Expansion joints. 1.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
G.Sirri – INFN Bologna LNGS /19 Status Report of the Bologna Scanning Lab Bologna Scanning Lab Last activities in the Bologna scanning lab.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Update on Pavia MM mechanical prototype
Ladder Assembly All tools and jigs produced Glue dispensing works
Edge Scanning: new plate design for the European Scanning System
Shear test with irradiated samples
presented by Innovative Manufacturing Solutions
Laminated Tube Making Machine for 90 tubes/min
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
Studies of Quad Pixel Module assembly using paper laminate
Board Replacement for Engineered Glue-Down Hardwood Floors
Grinding Edges Square & Parallel
Gluing machine A semi automatic machine to glue emulsion plate on adhesive tape (as done by Japanese colleagues) was realized and delivered to Bologna.
Heidelberg Module Production
1st solution. Cut internal to the plate with startup hole
Ultra-efficient installation solutions
Lateral Marks with ESS A test version is available in since the end of September. Several laboratories.
Presentation transcript:

G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and spacer.  Simpler handling (less rejection)  Accurate positioning of the corner without not easy setup (test in progress),  Production rate higher. No precise cutting tool required.  Plastic frames provided by external manufacturer. estimated cost : frame 4.5 euro/brick, tape 15 euro/brick [+1.5 euro/brick] estimated time : 25 minutes brick/ 1 person [-15 minutes/brick] Plastic frame

G.Sirri – INFN Bologna Videoconf New plate with holes  Within this R&D on Edge Scanning and Distortion Study, severel prototypes of vacuum plates with holes were realized.  New prototypes delivered. Vacuum good. Distortion measurements in progress. 2/7

G.Sirri – INFN Bologna Videoconf Spares

G.Sirri – INFN Bologna Videoconf spacer lateral tape Tape and Spacer Specifications OLD Tests performed using : - acrylic adhesive tapes: Nitto model 31C and model 3161F (80 µm thickness, 140 mm width) - spacers and lateral tapes: PVC (300 µm thickness) Nitto tapes are suitable for our purpose. Tests of (more) rigid spacer and/or lateral tapes are in progress.

G.Sirri – INFN Bologna Videoconf Costs and operational times OLD  Acrylic adhesive tape: 60 euro/roll (140 mm x 50 m) [order ~ 50 rolls] 1 brick ~ 12 m  4 bricks/roll  15 euro/brick  PVC tape: 3.5 euro/roll (20 mm x 50 m) 0.04 euro/spacer  3 euro/brick Expected operational time to glue 1 brick (1 person) : strip preparation: ~ 10 min gluing machine: ~ 10 min (manual) cutting: ~ 20 min

G.Sirri – INFN Bologna Videoconf A. "Both exchangers can handle only glued emulsions.“ -> All bricks glued. => modifications for ALL exchangers of one family. B. "The exchanger [A] can handle only glued emulsion. The exchanger [B] can work in glued/not glued mode." -> Glue for [A]. No glue for [B]. Events at the border or pathological cases with the same gluing. => modifications for a few exchangers of the type [B]. Bricks already measured with [B] will be glued for remeasurement with [A] Bricks already measured with [A] can be measured with the modified exchangers of [B] C. "Both exchangers can work in glued/unglued mode." -> No glue for the majority of the bricks. Events at the border or pathological cases with 2 different gluing. => modifications for a few exchangers of the type [B]. 6/7 2 exchanger families: [A] and [B] / same GLUING