MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.

Slides:



Advertisements
Similar presentations
Ensure Vendor/Engineer of Choice Product Quality
Advertisements

Software Quality Assurance Plan
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Facilities Management and Planning Horace Bomar, Director November 1, 2011.
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Managing the Information Technology Resource Jerry N. Luftman
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Unit 3: Command & Control IC/IMT Interface
ISO 9000 Certification ISO 9001 and ISO
Network security policy: best practices
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Release & Deployment ITIL Version 3
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
Solution Overview for NIPDEC- CDAP July 15, 2005.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Server Virtualization: Navy Network Operations Centers
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
RUP Implementation and Testing
Software System Engineering: A tutorial
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
David N. Wozei Systems Administrator, IT Auditor.
ALMA Operations and the North American ALMA Science Center Al Wootten NRAO.
2-1 DMS Requirements Status Daryl Swade DMS Systems Engineer Nov. 6, 2013 S&OC Data Management System Design Review 3.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
 Sana Riaz  Registration No  Saira Khalid  Registration No
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Computerized Manufacturing Systems
Focus on 128T Steven Tingay. Where are we? Prior to NSF proposal review, I prepared a contingency plan in Australia - use Australian-only (and Indian,
MWA Data Capture and Archiving Dave Pallot MWA Conference Melbourne Australia 7 th December 2011.
ExOB Discussions on Development Test Center WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006.
October 21, 2015 XSEDE Technology Insertion Service Identifying and Evaluating the Next Generation of Cyberinfrastructure Software for Science Tim Cockerill.
Introduction to The Grant Center Fitchburg State University.
Georgia Institute of Technology CS 4320 Fall 2003.
Project Manager Reports Ron Remillard (MIT) & Tom Booler (Curtin, Aurecon) MWA Project Meeting December 5, 2011.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
Interim Alternate Route Adjustment Process Joint Training INTERIM ALTERNATE ROUTE ADJUSTMENT PROCESS Joint Training October 31, 2008 INTERIM ALTERNATE.
Presented by: Jan Stanley, State Title I Director Office of Assessment and Accountability June 10, 2008 Monitoring For Results.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Requirement Engineering. Recap Elaboration Behavioral Modeling State Diagram Sequence Diagram Negotiation.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
The Design Management Team Framing the Scope of Work and Learning the Roles for the LCC Team.
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Session 2: Developing a Comprehensive M&E Work Plan.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
International Data Centre October 2015Page 1 Progressive Commissioning Jerry Carter, Senior Scientist W. Randy Bell, Director Gerhard Graham, Coordinator.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Project Management PTM721S
Presenter: Igna Visser Date: Wednesday, 18 March 2015
Session objectives After completing this session you will:
From LSE-30: Observatory System Spec.
Archive, Data Products, & Operations for the Murchison Widefield Array
Systems Implementation,
Developing Information Systems
Management Breakout: MREFC Budget Summary Victor L
Nada Al Dosary Edited By: Maysoon AlDuwais
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Mark McKinnon EVLA Project Manager
Presentation to Project Certification Committee, DoIT August 24, 2008
System Construction and Implementation
EVLA Operations Jim Ulvestad
Presentation transcript:

MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011

Goals for OMP Completion Explain OMP v. 3 at Dec. project meeting (current session)  Available now on MWA twiki  …or browse Gather feedback from team and Board (this week) Produce OMP v. 4 (by 2012 Jan 6) Board Review of v. 4 during January telecon Produce OMP v. 5 by 2012 Jan 27 Use OMP v. 5 as a basis for planning in 2012  Support proposals for Operations funding  Help organize activities of Science Council  Help organize observing proposals from Science Package teams Review OMP at June 2012 project meeting

Perspectives on the MWA Operations Management Plan, v.3 Outline MWA Activities as a Managed Observatory (not shoestring theater; one can trim, if desired or necessary) Organized in categories: Facilities support; Observations support Primary Elements of OMP  Time-line of events that frame MWA observations  Outline assumptions about MWA project support external to Operations  Specify Operations staffing and work tasks  Specify support required for maintenance and repair  Sort requirements into Operations costs and Other Resources (i.e., faculty, science grants, fellowship postdocs, students, etc.) Strategy: Make some choices and seek feedback

Time Line of Events for MWA Operations (slide 1) (Science) Science Council issues call for proposals, per MWA Board Time Allocation policies. (Science) Observing proposals are submitted to the Science Council by Science Package leaders and other sources consistent with the proposal call. (Science) Science Council oversees the proposal review and issues a target list containing target name, position, exposure goal, observing mode, and observing constraints. (Target lists should be issued no less frequently than every 6 months, and delivery should be at least one month before the first observation.) (Science) Requests for additional Science Council targets or Targets of Opportunity (ToOs) from Director’s discretionary time, may be issued, in accordance with MWA Board policies. (Operations) Observing schedule is made from the approved target lists. (Operations) Observing commands are generated to implement the schedule. (Operations) Supplemental observing commands are generated for routine observing modes that support instrument health and safety, with procedures TBD. (Operations) The command load is stored in the M&C command database to conduct the observations, under the supervision of the Duty Scientist. (Operations) Target revisions and ToOs are accommodated, as resources allow.

Time Line of Events for MWA Operations (slide 2) (Operations) Observations are conducted, generating correlator data, RTS output images, RTS calibration data, and M&C database records, with contents and formats defined in MWA standard data products [9]. (Operations) Correlator and RTS data products are transferred via the fiber link from MRO disks to the primary MWA Archive at the Pawsey Centre in Perth. (Operations) MWA data transfer software monitors the data transfer status and activates the backup recording system, as needed. (Operations) Upon completion of the observations, the associated entries in the M&C database are transferred to the MWA Archive. (Pawsey Center) All MWA data products from MRO are stored in the MWA Archive, under the supervision of the MWA Data Archive Manager. (Science) A second version of the RTS operates in Curtin (details TBD) to support RTS code revisions, algorithm testing, and reprocessing computations for selected data, using the MWA archive.

Time Line of Events for MWA Operations (slide 3) (Science) Data is distributed from the primary MWA Archive to secondary Archives at MIT and Melbourne. (Pawsey Center) Data is distributed from the primary MWA Archive to general science users, per MWA Board policies. (Science) Scientific analyses are conducted, leading to publications of results. (Operations) Monthly (TBR) reports regarding targets and good exposure time are prepared by the Duty Scientist for project evaluation. (Science) Instrument performance tests and trend analyses are performed on MWA data for project evaluation, under the direction of the Operations Director.

Operations Staff positionFTElocation fundingOps FTE Operations Director0.5Curtin Faculty -- Site Manager0.5Curtin Ops budget 0.5 Operations Engineer1.0Curtin Ops budget 1.0 Assistant Engineer1.0Curtin Ops budget 1.0 Data & Archive Mgr.0.5Curtin Ops budget 0.5 Duty Scientist1.0TBD Ops budget 1.0 M&C Software Engineer0.5TBD Ops budget 0.5 RTS Software Engineer1.0TBD SupSciFellow -- Computer/Network Mgr.1.0TBD Ops budget 1.0 ____ ____ total

Operations Staff OPERATIONS DIRECTOR (0.5 FTE; Curtin Faculty) Oversee OMP implementation. Oversee Operations budget. Report Operations status, trends, costs, risks, and changes to the MWA Board. Expedite hardware repairs, working with the Operations Engineer. Tap MWA Heritage expertise from partner institutions, as needed. Find Project resources to tackle special problems, as needed. Oversee high-level monitor and trend analyses to guarantee Observatory health & productivity. SITE MANAGER (0.5 FTE; Operations budget) Oversee the working conditions of the MWA central building and housing facilities and work with CSIRO to resolve problems. Perform scheduled maintenance inspections of MWA Tiles and Receivers. Perform resets of hardware or utilities that cannot be achieved with M&C. Assist efforts of Duty Scientist or Operations Engineer, as needed.

Operations Staff OPERATIONS ENGINEER (1.0 FTE; Operations budget) Diagnose hardware problems and make decisions on repairs and replacements. Oversee procurement and site deliveries for hardware repairs and replacements. Maintain RFI compliance for MWA hardware at MRO, per CSIRO standards. Conduct laboratory tests needed to understand failures. Implement hardware changes that are cost effective and increase productivity. Recommend changes to M&C, as related to hardware monitoring. ASSISTANT ENGINEER (1.0 FTE; Operations budget) Assist in all of the work tasks of the Operations Engineer.

Operations Staff DUTY SCIENTIST (1.0 FTE; Operations budget) Make the M&C command schedule from the monthly target list. Troubleshoot M&C failures and resume observations. Recommend changes to M&C software or the user interface. Respond to requested schedule changes and ToOs, as resources allow. Track good exposure times for targets and issue reports monthly (TBR) for evaluation. M&C SOFTWARE ENGINEER (0.5 FTE; Operations budget) Consult with the Duty Scientist and Operations Engineer to track M&C performance. Revise M&C software to fix problems. Upgrade M&C to improve designs, interfaces, capabilities, robustness, or efficiency. Recompile, test, and install new M&C versions, as needed. Provide backup support to the Duty Scientist to continue scheduled observations.

Operations Staff RTS SOFTWARE ENGINEER (1.0 FTE; Super Science Fellow) Maintain RTS operation to produce calibrated MWA images in real time. Characterize statistical properties of deep images, compared to statistical expectations. Organize efforts to compare RTS methods to standard analyses, using selected observations. Revise RTS algorithms and install new RTS versions, as needed. Provide assistance for iterations of RTS processing via the MWA archive, as needed. COMPUTER & NETWORK MANAGER (1.0 FTE; Operations budget) Maintain proper operation of computers and receiver SBCs operating at MRO. Maintain MWA work stations associated with the MWA Archive. Maintain MWA networks at MRO and in Perth and handle security issues. Upgrade operating systems when necessary. Facilitate network connectivity for MWA team to MRO and the MWA Archive. DATA & ARCHIVE MANAGER (0.5 FTE; Operations budget) Track and ensure successful archiving of MWA data products. Facilitate the efforts of MWA team to retrieve MWA data from the Archive. Assist the Director in using the archive to track instrument performance and trends.

Operations Costs Category Number year 1 (kAUD) Operations Staff ? Diesel fuel 30/hr 250. ? Transportation 24 trips 50. Boolardy Housing 180 x 2 people50. Hardware repair beyond spares50. ? __________ _____1M Contingency ?? Overlooked ??

Final Comments Loose ends:  Board approval of Time Allocation Policy  Definition of Operations start e.g., approvals?: Project Scientist (Commissioning complete) Project Director (Project is Ready for Operatons) Operations Engineer (Hardware is Ready for Operations)  Consistency of PMP and OMP Define roles (e.g., monitoring) for users (require in time allocation policies?) Define Engineering observatins and cycles that need to be added to science observation. Send feedback and recommendations Let’s get this finished!