CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
Advertisements

City of Hubbard Transportation System Plan Update April 25, 2012.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Presented by Nazir Lalani P.E TRAFFIC SAFETY EVALUATIONS (Pedestrians and Bicyclists)
M3 - 1 The Road to Skilled Driving April 2006 Chapter 2 Signs, Signals and Roadway Markings.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Jan. 16, 208 CoW1 - Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole January.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
City of Salem Transportation Department Public Opinion Survey Summary Report August 2007 Presented By Tim Hibbitts, Principal Davis, Hibbitts & Midghall,
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING April 16, 2014|3:00PM -5:00PM | ROOM 1E-108.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Mecca Roundabout Project Mecca, CA September 28, 2011.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Background “New Normal” Service. Background Stadium Event Service.
Stop Sign This is a traffic sign. This means to stop. It helps us be safe when driving.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Intersections.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
JAMESBURG, NEW JERSEY Edward J. Bloustein School of Planning and Public Policy.
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
Metro Gold Line Eastside Extension Four Quadrant Gate Feasibility Study Summary.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
C ITY OF R AINER R AILROAD C ROSSING ’ S. Project # 2 Group Matthew DeGeorge Josh Crain Robert Acevedo Chris Penka Jim Harvey Heather Wenstrand.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Railroad Quiet Zone (RRQZ) And Crossing Safety Improvement Project.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.

Arizona Forward Update
Parallel Taxiway and Apron Expansion Project Open House
Joint Police & Streets Committee
The I-465 West Leg Reconstruction Project
Marina Vista Streetscape Project
Center City Connector 101.
Public Information Meeting NW 100th Street Reconstruction Project
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Signs, Signals and Roadway Markings
Downtown Valdosta Truck Traffic Mitigation Study
SE 12th Street Roadway Improvements February 8, 2005.
State Aid Standards Development
Proposed Driscoll Expansion Brookline, Massachusetts
Colorado Avenue University of Colorado, boulder
Presentation transcript:

CITY OF RAINIER RAILROAD CROSSINGS 1

Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance Matthew DeGeorge Robert Acevedo Josh Crain Heather Wenstrand Jim Harvey 2

Presentation Outline Introduction Existing Conditions Future Conditions Intersection Designs Cost Estimates Conclusion 3

Scope 1. To design safe railroad crossings that maximizes the movement of people and goods. 2. Design safe pedestrian crossing across the railroad tracks. 3. To design effective intersection closures that minimizes the impact on traffic and the community. 4

Background The City of Rainier is on the south bank of the Columbia River across from Longview, Washington. This project is part of the Rainier Waterfront Urban Renewal Plan. The closing of the Trojan nuclear power plant set off a decline in the number of businesses in the city. The current population is around 2,000 people. Freight trains with 110 railcars pass through downtown Rainier along A Street. 5

Project Overview Project consists of: –Design closing for 3 crossings –Redesign 4 crossings The City of Rainier has no dedicated engineering staff. –Lars Gare, City Administrator ODOT Rail has final design approval –Dave Lanning, Crossing Safety/Compliance 6

Existing Conditions Rainier, Oregon 7 “A” Street 2 nd Street E

1 st Street 6 th Street E 8

 Crash Data  JOSH HAS THIS  Peak Volume < 300 vph  Operating well below capacity  No additional studies needed Traffic Conditions 9

Future Conditions 10 ODOT’s 3/3/1 Offer to City City of Rainier Responsibilities –Select 3 at-grade crossing to close, 4 for upgrade –Must produce all design & engineering plans –City is financially responsible for 1 of the 4 upgrades ODOT Rail –Maintains final design approval –Will finance and construct 3 crossing closures and 3 crossing upgrades

Future Closures –City decided due to usage and location that it would be beneficial to close the following 2 nd Street East 4 th Street East 5 th Street East Future Gated/Controlled –City decided that it would be necessary to allow the following intersection to remain open however to provide control measures for safety purposes. 2 nd Street West 1 st Street 3 rd Street East 6 th Street East 11 Design Summary

12 We need to update this graphic. Robert?

2 nd Street West Left Turn Pocket Install two at-grade crossing gates at curb bulb outs 13

1 st Street Install four at-grade crossing gates at curb bulb outs 14

2 nd Street East “Right in, right out” Access from cross streets maintained Minimal signage 15

3 rd Street East Install two at-grade crossing gates at curb bulb outs 16

4 nd Street East “Right in, right out” Access from cross streets maintained Minimal signage 17

5 th Street East “Right in, right out” Access from cross streets maintained Minimal signage 18

6 th Street East Uncontrolled Crossing Signing and Striping Only 150-feet of Open Track 19 Add warning lights to these two locations.

Cost Estimates Cost by TypeCost by Intersection Striping (including rx)$249,4402 nd Street West$249,440 Signing (including rx)$248,4401 st Street$248,440 Right of Way Acquisition$12,2602 nd Street East$12,260 Signals/Gates (including conduit, controllers, gates, etc) $248,4403 rd Street East$248,440 Profit/overhead$12,2604 th Street East$12,260 Contingency$12,2605 th Street East$12,260 Mobilization/temporary traffic control… $5,5206 th Street East$5,520 Total$788,620Total$788,620 20

Design Impacts: Parking –How much diagonal parking did we take out? –How much parallel parking did we add back? 21

What other design concerns have we had? 22

Some sort of project conclusion here… 23