Module Flex status. 4 types: M4, M2, M1plane, M1mountain. constraint: components and bonding on the same side → folded wing geometry of the flex module.

Slides:



Advertisements
Similar presentations
SPACE PRODUCT ASSURANCE
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Stave -1 status and other reports Stave Loading Meeting, November 8 th 2011 G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa,
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
Type 0 flex assembly to the stave 2011/06/08 François-Xavier NUIRY CERN PH/DT/PO 1.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
1 Module and stave interconnect Rev. sept. 29/08.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Printed Circuit Board Design
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
ECAL silicon- tungsten status
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Oct/07/2010Pixel PP0 opto replacement issues1 1 1 PP0 Opto Replacement Issues Philippe Grenier, Martin Kocian, Dave Nelson, Marco Oriunno, Su Dong, Charlie.
How to make a PCB.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Hybrid Activities for ABC Aim to freeze thermo-mechanical layout next week in readiness for submission Will make use of a resistive serpentine.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Zeuthen, January 16, 2008 P. Colas - Micromegas panels1 Micromegas panels Status and plans D. Attié, P. Colas, X. Coppolani, M. Dixit, M. Riallot, F. Sénée,
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Berkeley status Aug 10th, 2012.
SVD Electronics Constraints
Markus Friedl (HEPHY Vienna)
ob-fpc: Flexible printed circuits for the alice tracker
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
Equipment for Assembly – UK Experiences
Design and fabrication of Endcap prototype sensors (petalet)
पी.सी.बी बोर्ड.
Outer Endcap External Bus tape
Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005
Flex studies status. Module flexes: 4 types; M4, M2, M1plane, M1mountain. constraint: components and bondings on the same side. Constraining for the wing.
Updates on the Silicon Tracker 2S Module
Presentation transcript:

Module Flex status. 4 types: M4, M2, M1plane, M1mountain. constraint: components and bonding on the same side → folded wing geometry of the flex module. Serial powering current: 0,6A mandatory for the tracks implementation on the stave flex. Discussion started with LPSC on current generator. Current PSPP not adapted for the low current/high voltage powering. Should be studied but not implemented on the module flexes. Total surfaces: stave flex 558cm², module flex 322cm² → 37% for modules. → Important to reduce matter for modules too. Discussion with Rui on 23/04/2015: same material and process than stave flexes. Platted holes possible with a 10µm copper platting. Not dominant for X0 because of the reduced surface of copper. Final stack-up: coverlay(12-12µm)-core( µm)-coverlay(12-12µm). Scheme currently finalized, HV pads… Modules CAD details to be discussed with bonding company: connection pads, glob-top, gluing? Also full sheet CAD to be discussed for tooling development with bonding and components mounting people. First contact with Hybrid SA (Neuchâtel), advised by Rui. → Meeting foreseen soon with a first set of CAD drawings. Sebastien Vilalte, 28/04/2014

Tooling(s): to be discussed with Hybrid SA and LAPP for specific features: bending/folding… Also with components mounting company. What are we going to do in LAPP? Compromise between time and money (gluing). Steps:→ Finish 1 st version of CAD & meet Hybrid SA: end of May. Discuss with component mounting people (CERN, Addax?, not so trivial…). → Rework of the CAD, tuning with Rui, launch prod: beginning of June. Can expect naked flexes for September. → Components mounting: September. → Gluing, bonding: sept,oct... Production: for one stave, total of 7 M4, 2 M1 and 13 M2. For electrical and mechanical tests, need at least 20 M4, 10 M1 and 40M2. Represents about 900cm², the equivalent surface of the stave flex prod. → about 8000CHF. → mounting, gluing, bonding: €??? → connectors: 500€ Linked developments: translation boards for module testing with USB-pix: 200€. TOTAL: 15-20k€. Sebastien Vilalte, 28/04/2014