Planning for security Microsoft View

Slides:



Advertisements
Similar presentations
MGD Services, Inc. The IT Quality Assurance Specialists
Advertisements

Cost-Effective Software Deployment
FMS. 2 Fires Terrorism Internal Sabotage Natural Disasters System Failures Power Outages Pandemic Influenza COOP/ Disaster Recovery/ Emergency Preparedness.
Internet Information Services 7.0 and Internet Information Services 7.5 Infrastructure Planning and Design Published: June 2008 Updated: November 2011.
© by cellconsult.com Application Testing & Test Management.
Microsoft ® System Center Configuration Manager 2007 R3 and Forefront ® Endpoint Protection Infrastructure Planning and Design Published: October 2008.
HP Quality Center Overview.
1 Requirements and the Software Lifecycle The traditional software process models Waterfall model Spiral model The iterative approach Chapter 3.
ITIL: Service Transition
Validata Release Coordinator Accelerated application delivery through automated end-to-end release management.
Windows Server ® Virtualization Infrastructure Planning and Design Published: November 2007 Updated: July 2010.
GIS Needs Assessment Project Final Presentation Presented to: The Lower Adirondack GIS Users Group Presented by: Sara Frankenfeld fountains spatial, inc.
© Copyright 2011 John Wiley & Sons, Inc.
Software Asset Management
Asset management guidelines
Optimizing IT Department Project Portfolio Management (Concurrency Corporation)
Deployment and Configuration Management Solution
Internet Business Strategies A strategic view of the various options and connectivity levels available to business through the Internet. Copyright 2011.
Release & Deployment ITIL Version 3
Reducing the Cost and Complexity of Server Management with Microsoft Operations Manager.
November 2009 Network Disaster Recovery October 2014.
© 2006 Jupitermedia Corporation Webcast TitleSuccessful Rollout Planning 1 January 19, :00pm EST, 11:00am PST George Spafford, President Spafford.
User Services. Services Desktop Support Technical Support Help Desk User Services Customer Relationship Management.
Complete and Integrated Lifecycle Management. Challenges 1.
ICAT3025A - Install and optimise operating system Information and Communications Technology (ICA05)
Solution Overview for NIPDEC- CDAP July 15, 2005.
Web Development Process Description
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.
UML - Development Process 1 Software Development Process Using UML (2)
Business Continuity and Disaster Recovery Chapter 8 Part 2 Pages 914 to 945.
Roles and Responsibilities
Server Virtualization: Navy Network Operations Centers
Transforming Army Management of Individual Chemical Protective Equipment Mobility Inventory Control and Accountability System Used in Individual Protective.
1 Software Testing (Part-II) Lecture Software Testing Software Testing is the process of finding the bugs in a software. It helps in Verifying and.
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
Microsoft ® System Center Operations Manager 2007 Infrastructure Planning and Design Published: June 2008 Updated: July 2010.
Software Testing Life Cycle
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
Relationships July 9, Producers and Consumers SERI - Relationships Session 1.
Time lag between discovering issue and resolving Difficult to find solutions and patches that can help resolve issue Service outages expensive and.
15 Copyright © 2007, Oracle. All rights reserved. Performing Database Backups.
The Implementation of BPR Pertemuan 8 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Systems Management Server 2.0: Backup and Recovery Overview SMS Recovery Web Site location: Updated.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
GLOCO – Integrated Corporate Portal Part 3 – Implementation Plan Presented by Team 3 1 Team 3 Members: Joyce Torres Kenneth Kittredge Pamela Fisher Ruzhena.
Construction, Testing, Documentation, and Installation Chapters 15 and 16 Info 361: Systems Analysis and Design.
October 10-13, 2006 San Diego Convention Center, San Diego California Extending the Value of Your VoIP Investment to Business Applications.
GLOCO – Integrated Corporate Portal Part 3 – Implementation Plan Presented by Team 3 1 Team 3 Members: Joyce Torres Kenneth Kittredge Pamela Fisher Ruzhena.
Systems and Network Design Professional Services for NT Server and NetWare Networks.
Module 1: Introducing Windows Server 2003 Network Infrastructure Planning, Tools, and Documentation.
Software Development A Proposed Process and Methodology.
Chapter Sixteen Managing Network Design and Implementation.
Fred Berry (330) (330) Fax.
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
Chapter 12 Implementation and Maintenance
Team Ramrod. Identify and Define The Problem Identify The Problem Low enrollment in the ICT programs. There seems to be a lack of interest in ICT related.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
ITIL: Service Transition
Roles and Responsibilities
Software Configuration Management
Constructing Deploying and Maintaining Enterprise Systems
Project Management Complexity, Risks, Failure and Technology
Simplified Development Toolkit
Enterprise Program Management Office
DAT381 Team Development with SQL Server 2005
Presentation transcript:

Planning for security Microsoft View www.microsoft.com

Introducing Planning Documentation Day-to-Day Documentation Capacity Plan Deployment Plan Security Plan Pilot Plan Test Plan

Day-to-Day Documentation Create the project structure documents Use and revise throughout the remaining project phases Benefits of the documenting processes Manage change Identify opportunities Coordinate and prioritize individual projects Assess current state of technology Eliminate duplication of effort Share analysis and assessment

Capacity Plan Web Server Telephone Line T1 Line 90 KB 28.8-Kbps Modem Internet 25-Second Download Time

Deployment Plan Key areas Techniques can be… Installation strategy Phased or all at once, site by site or department by department, push or pull Contingency planning Parallel systems, or full backup with restore capability Site/line-of-business All at once during planning phase, or site by site during deployment phase Deployment mechanisms Fully automated network installation, partially scripted installation, or manual Deployment resources Internal IT staff, or contractors Systems support approach Tiered support, or pilot and roll out support

Security Plan Maintaining the integrity of the solution Data loss Denial of access Compromise of data, resources or services

Pilot Plan Key areas Techniques can be a… Pilot participant selection Focus on urgent business needs, the visibility or influence of user group, or the risk of failure Pilot scope Test of solution functionality and deployment processes, or full test of solution and deployment processes Number of pilot participants Small number of participants, or an entire department or entire site Number of pilot projects Complete network installation, partially scripted installation, or manual Deployment resources Single or multiple allocation of resources Pilot feedback mechanisms One time only planning phase, or site by site during deployment phase

Test Plan Key areas Techniques can be a… Types of testing to be performed Unit test, integrated system test, performance test, stress test, usability test, and regression test Test format and success criteria Fully documented test scenarios and test results, and informal testing with verbal agreement from key stakeholders Change control Programmatic check-in of a change management process Configuration management Centralized management of hardware, software, and documentation standards, and local management of configurations Issue and bug tracking Prioritization of issues, and tracked in bug-tracking database, or issues tracked through e-mail

Development and Test Environment Process Production Establish the baseline Decrease the risk of unknown variables Prepare and synchronize the environments Provide guidance and determine functionality of both environments Track environment states Set up system to accurately track environmental states