O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Update T. E. Mason Oak Ridge National Laboratory Associate.

Slides:



Advertisements
Similar presentations
Recommendations Ward Plummer BESAC Subpanel Review of IPNS and LANSCE/Lujan Center Recommendations Ward Plummer Washington, D. C. December 11, 2000.
Advertisements

Overview of the ARCS Project Plan: The View at One Year Doug Abernathy ARCS Instrument Scientist ARCS IDT Meeting Lujan Center, LANL September 30, 2002.
Baseline Review The Path of ARCS from Science to a Project Brent Fultz California Institute of Technology.
Experimental Facilities DivisionORNL - SNS June 22, 2004 SNS Update – Team Building Steve Miller June 22, 2004 DANSE Meeting at Caltech.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
HYSPEC Instrument: Status and Performance M. Hagen Neutron Facilities Development Division, SNS, Oak Ridge National Lab. W.J. Leonhardt and A. Ruga Condensed.
Department of Energy Review of the SNS Instruments –Next Generation (SING) Project HYSPEC Instrument: Status and Performance Mark Hagen Instrument Scientist.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Instrument Development Test Station at HFIR CG1 Lowell Crow, May 15, 2009.
Experimental Facilities DivisionOak Ridge SNS INSTRUMENTS OVERVIEW R. K. Crawford Instrument Systems Senior Team Leader September 10, 2004 HYSPEC IDT Meeting.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Proposal for a High Intensity Chopper Spectrometer at LANSCE Science requiring high sensitivity neutron spectroscopy Limitations of current instrumentation.
MACS –a New High Intensity Cold Neutron Spectrometer at NIST February 17, 2003Timothy D. Pike1 Developing MACS A Third Generation Cold Neutron Spectrometer.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
ICS – Software Engineering Group 1 Status of SNS Carl Lionberger.
Ken Andersen Instruments Division Head Science Directorate Fixing the Accelerator Time Structure ESS Science Advisory Committee Lund
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
Building MACS  Goals of the MACS project  Funding and time line  Technical overview  Possible IDG contributions  Process for IDG involvement in MACS.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
LANSCE Update for BESAC July 23, 2002 Paul W. Lisowski LANSCE Division Leader Los Alamos National Laboratory.
Construction of new Neutron Diffractometer and Neutron Optics Test Station at MIT for research in materials science and neutron optics and education of.
Recommendations of the Programme Advisory Committee for Condensed Matter Physics 20th meeting, April 2004 Wojciech Nawrocik JINR Scientific Council,
OFFICE OF SCIENCE The Making of the Spallation Neutron Source A 25-Year Journey Patricia Dehmer Deputy Director for Science Programs & Acting Director.
Neutron Diffractometer at MIT Nuclear Reactor Laboratory Neutron scattering and spectroscopy are among the pre-eminent tools for studying the structure.
Ted Fox Interim Associate Laboratory Director Energy and Engineering Sciences Oak Ridge, Tennessee March 21, 2006 Oak Ridge National Laboratory.
Alexander Aleksandrov Oak Ridge National Laboratory
Managed by UT-Battelle for the Department of Energy Dynamically Polarized Solid Target for Neutron Scattering Josh Pierce, J.K. Zhao Oak Ridge National.
Introduction Ward Plummer BESAC Subpanel Review of IPNS and LANSCE/Lujan Center Washington, D. C. December 11, 2000.
BESAC Workshop on Opportunities for Catalysis/Nanoscience May 14-16, 2002 William S. Millman Basic Energy Sciences May 14, 2002 Catalysis and Nanoscience.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
HYSPEC IDT Polarized Beam Operation of the Hybrid Spectrometer at the pulsed Spallation Neutron Source. Outline HYSPEC: project timeline and place in the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee.
1 Spallation Neutron Source Data Analysis Jessica Travierso Research Alliance in Math and Science Program Austin Peay State University Mentor: Vickie E.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
1 How Can We Get More Neutrons? Upgrade Paths for the EDM Geoff Greene University of Tennessee /Oak Ridge National Laboratory Oct 2006.
U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Director, Office of Science April 29, 2004 PRESENTATION FOR THE BIOLOGICAL AND ENVIRONMENTAL.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
September 10, 2004 Experimental Facilities Division SING Project Status HYSPEC IDT Meeting John Haines SING Project Manager September 10, 2004.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
Neutron Scattering Group February, 2001 A High Performance Instrument for the Single Crystal Spectroscopy at the Pulsed SNS. n What is the spectrometer.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Dynamically Polarized Solid Target for Neutron Scattering at the SNS PST 07 J.K. Zhao Neutron Scattering Sciences Division, Spallation Neutron Source Oak.
HYSPEC IDT Polarized Beam Mode for the Hybrid Spectrometer (HYSPEC) at the Spallation Neutron Source. Outline BNL’s HYSPEC project and its place in the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
HYSPEC IDT HYSPEC: Our Instrument at the Spallation Neutron Source. Outline Spallation Neutron Source (SNS) and the BNL Overview of the SNS instrument.
HYSPEC IDT Polarized Beam Mode for the Hybrid Spectrometer (HYSPEC) at the Spallation Neutron Source. Outline Polarization analysis and the HYSPEC place.
ESS TDR Internal Review Chapter and 12. October 2012 Oliver Kirstein.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
SNS Experimental FacilitiesOak Ridge Soft Condensed Matter with Spallation Neutrons JK (Jinkui) Zhao Presented at the Review Meeting of the Chinese Spallation.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
LCLS 2009 NSLS-II 2015 APS 1995 BES Light & Neutron Sources SPEAR ALS 1993 HFIR 2008 SNS
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
UK Neutrino Factory Conceptual Design
Jefferson Lab Overview
THE NEUTRON SPECTROMETER
MIRACLES budget: Summary of the 3 configurations
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Scope Setting Meeting MIRACLES
Test Beamline System Requirements and Charge to PDR Committee
SNS-PPU upgrades the existing accelerator structure
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Presentation transcript:

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Update T. E. Mason Oak Ridge National Laboratory Associate Laboratory Director for the SNS July 22, 2002 Gaithersburg, MD BESAC

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source The SNS will begin operation in 2006 At 1.4 MW it will be ~8x ISIS, the world’s leading pulsed spallation source The peak thermal neutron flux will be ~50-100x ILL SNS will be the world’s leading facility for neutron scattering It will be a short drive from HFIR, a reactor source with a flux comparable to the ILL

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY SNS - Guiding Principles SNS will provide high availability, high reliability operation of the world’s most powerful pulsed neutron source It will operate as a User Facility to support peer reviewed research on a Best-in-Class suite of instruments –Research conducted at SNS will be at the forefront of biology, chemistry, condensed matter physics, materials science and engineering SNS will have the capability to advance the state of the art in spallation neutron source technology. This includes: –R&D in accelerators, target, and instruments to keep SNS at the forefront –Planned enhancement of SNS performance through upgrades of the complex and ongoing instrument development as part of the normal operating life of the facility

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Project Status The FY 2002 request was $291M, fully funded The FY 2003 request is $225M, as anticipated Overall project design is 79% complete Overall the project is 44% complete (through May 2002) and within budget and schedule constraints –$1.4B and June 2006 completion Significant site construction activities are underway There is good progress on all of the technical components: front end, superconducting linac, ring, target & instruments We continue to have excellent ES&H performance –>700,000 construction site work hours without lost workday injury Post-handoff MOAs signed with LBNL, BNL, draft LANL – others to follow, partner lab relations good –Working through issues

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Recent Accomplishments Site construction activities have ramped up considerably and safety performance has been maintained –Target building foundation, ring tunnel foundation and general construction, CHL, electrical substation, klystron gallery, & CUB underway, progress is good –Installation of technical components has begun New XFD Director – Ian Anderson (ILL) 03/11/02, Thanks to Tony Gabriel! New Ring Senior Team Leader – Jie Wei 03/01/02, Thanks to Bill Weng! Across the whole project we continue to award significant $ in procurements of technical systems and are staying within the cost envelope –Cumulative awards through the month of June totaled $341.8M against a baseline budget of $333M. Over 70% of the project’s total procurements have been placed The baseline was revised using the Estimate to Complete (ETC) and it is holding up well, contingency remains adequate (but tight) On track for Front End commissioning fall of this year! –2.5 MeV through the RFQ and MEBT at LBNL with good beam properties –Installation in Oak Ridge underway

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY SNS Construction >800,000 safe hours 1 LWC at SNS-ORNL 4 minor RIIs at site; 3 RIIs at SNS-ORNL From April 01-May 02

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY SNS Construction

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Installation of Technical Components

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY LBNL: First Beam through Full RFQ on 1/25/2002, MEBT 4/4/2002 Installation of the front end has begun – commissioning this fall Exceeds performance goals (50 mA demonstrated – 38 mA required)

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Drift Tube Linac Fabrication and Assembly is Underway Re-assembling DTL tank #3 in Oak Ridge

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY JLab: Superconducting Linac Highlights Prototype cryomodule testing has begun Initial results very promising – exceeding specifications for accelerating gradient

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY PROTONS Instrument Status Engineering Diffractometer – BL 9 Areas for User and Instrument Support SANS – BL 6 Cold Neutron Chopper Spectrometer – BL 5 Magnetism – BL 4a Liquids – BL 4b Reflectometers High Pressure Diffractometer – BL 3 Backscattering Spectrometer – BL 2 Disordered Materials Diffractometer – BL 1b Wide Angle Chopper Spectrometer – BL 18 High Resolution Chopper Spectrometer – BL 17 Single Crystal Diffractometer – BL 12 Fundamental Physics Beamline – BL 13 Powder Diffractometer – BL 11a Powder Diffractometer – BL 11a

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY High Resolution Backscattering Spectrometer Performance gains over comparable reactor backscattering instruments >100 (depending on bandwidth needed) High-Q option (with Si 311) 500x IN13 and 18x IRIS (with 3 times Q range and better resolution!) Crystal analyzer (Si) with 84 m incident flight path Achieves 2.2  eV resolution at the elastic position with 250  eV bandwidth Can operate up to 18 meV energy transfer with 10  eV resolution Unprecedented capabilities /arb

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Q-  Diagram for Inelastic Instruments adapted from “Neutron Scattering Instrumentation for a High-Powered Spallation Source” R. Hjelm, et al., LA0-UR Momentum Distributions Itinerant Magnets Crystal Fields Molecular Vibrations Lattice Vibrations Small Molecule Diffusion Large Scale Motions Polymers and Biological Systems Tunneling Spectroscopy Electron-Phonon Interactions Hydrogen Modes Molecular Reorientation Ultracold Neutrons Fundamental Physics Slower Motions Larger Objects ARCS THERMAL CHOPPER SPECT COLD NEUTRON CHOPPER SPECT BACKSCATTERING SPECTROMETER

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Reflectometers 2 reflectometers sharing a single beamport Requires new multi- channel shutters in the target station Allows for both vertical sample (magnetism) and horizontal sample (liquids) studies Novel beam bender optics allows multiplexing and reduces background Reflectivities <10 -9, times faster than any existing instrument /arb

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY SNS SANS Extended Q-Range Å -1 Moderate resolution Performance ~3-5 x D22 (ILL) & HFIR, ~ x ISIS

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Powder Diffractometer

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Q-Resolution Diagram for Elastic Instruments Small Proteins Micelles Colloids Vesicles Critical Phenomena Membranes Crystal, Fiber, and Magnetic Structures Liquids and Glasses Polymers and Metals Alloys Zeolites Magnetic Films and Domains Biological Structure Viruses SANS REFLECTOMETERS POWDER DIFFRACTOMETER

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Instrument Development Teams Currently 2 funded IDTs with additional teams in various stages of maturity: –Proposal for High pressure diffractometer (to BES) imminent –Proposal for Engineering diffractometer submitted to Canadian Foundation for Innovation (CFI) as part of partnership with ORNL/Universities that also includes second thermal chopper spectrometer  Reviewed in May by CFI –German team carrying out R&D for Spin echo spectrometer –DOE has indicated in FY03 budget plans an additional $5M for SNS instruments built by DOE labs Guidelines governing IDTs have been issued ( under users) incorporating input from advisory committees, users group executive, workshops and users meetings and are being used to implement agreements with the 2 funded IDTs (CNCS and ARCS) Guidelines will be updated once this is done using template established by ARCS and CNCS

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Early Operations A white paper has been drafted (in part stimulated by ASAC) to describe the expected operational mode in the early years of operation following project completion (CD-4) –Intended to stimulate discussion on the topic and following dialog between accelerator/experimental systems and users (plus ASAC, EFAC, DOE, etc.) form a basis for:  Planning  Decisions on spares, designs, budget, etc. that impact reliability  Setting user expectations –Breaks operations into six-month segments following CD-4 with a goal to have user mode operation after two years  User mode is defined by reliability with respect to schedule >90% with power level and availability (total number of hours) as variables to be maximized subject to that constraint  White paper lays out possible goals for the latter two segments

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Evolution of performance Goal is to optimize scientific performance which depends on power, reliability, availability, number and performance of instruments, quality of staff, etc. in a non-linear way The first six months following CD-4 the facility is under regulatory constraint to stay below Hazard Category 3 inventory threshold (until ORR is complete) –This implies low power (<10 kW) and duty factor –Suitable for accelerator commissioning and instrument tests with beam  No reliability requirement – XFD would like warning of when beam may be expected based on ca. 1 week working schedule Following completion of ORR the facility will be able to proceed toward higher power operation

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY High(er) Power Operations The second six-month segment should see operation at a power level sufficient to test all operational modes of instruments (including inelastic scattering) and debug control and analysis software, no external users –75% reliability, ~50 kW for ~500 hours At the start of year two of operations some instruments will be ready for scientific commissioning with some “friendly user” experiments, ISIS-class performance –80% reliability, ~150kW for ~900 hours By the end of year two power level should be world class with improving reliability –85% reliability, ~300 kW for ~1000 hours

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY User Mode Operations The third year of operations should see a transition to user mode operation on the initial instrument suite with the peer review proposal system in place, MW-class performance –90% reliability, ~800 kW for ~1500 hours over six months In subsequent years the reliability, power level, availability should all approach the ultimate goals –95% reliability, 1.4 MW for 2500 hours over six months –Longer-term goal is to increase rated power and buildout instrument suite

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Timeline for Operations

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Timeline for scientific productivity

O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Summary SNS is well positioned to deliver the world’s leading facility for studies of structure and dynamics of materials –Contingency is adequate (21%) –Early finish schedule has 6 months of float –Current baseline reflects results of recent Estimate to Complete  The performance of the baseline facility meets the needs and expectations of the scientific community and exceeds the initial CDR goals –Capable of >1 MW beam power (1.4 MW +) –Five Best-in-Class instruments with room for an eventual suite of 24 (vs. 18 in CDR) –Sufficient laboratory and office space to support world class facility operations and user needs –Flexible and upgradeable superconducting linac