Managing Contractors & Survey Data Presented by Bruce Carter.

Slides:



Advertisements
Similar presentations
Obstruction Surveys and Airport Airspace Analysis
Advertisements

Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
IBM Corporate Environmental Affairs and Product Safety
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Develop an Information Strategy Plan
Best Practices for an Owner Estimating Organization
Environmental Management System (EMS)
More CMM Part Two : Details.
Systems Analysis and Design Feasibility Study. Introduction The Feasibility Study is the preliminary study that determines whether a proposed systems.
How to Document A Business Management System
Case studies1. 2 Automating a law office Case studies3 Lessons learned Good intuition and technical skills are not enough to guarantee success Marketing.
Project Scope Management
Assignment Four Underwriting. Definitions Underwriting – The process of selecting policyholders by recognizing and evaluation hazards, establishing prices.
Dynamic Systems Development Method (DSDM)
introduction to MSc projects
Introduction to Databases Transparencies
Fundamentals of Information Systems, Second Edition
Computers: Tools for an Information Age
Project Management Session 7
Quality evaluation and improvement for Internal Audit
Management Information Systems, 4 th Edition 1 Chapter 16 Alternative Avenues for Systems Acquisitions.
WASC Accreditation Standards and Process August 31, 2006.
CS405 Systems Development Life Cycle 1. Traditional Project Phases Wild Enthusiasm Growing Concern Mounting Terror Resigned Fatalism Persecution of the.
SystematicSystematic process that translates quality policy into measurable objectives and requirements, and lays down a sequence of steps for realizing.
Content Mastery Center- Opening the Doors of Success
Purpose Program The purpose of this presentation is to clarify the process for conducting Student Learning Outcomes Assessment at the Program Level. At.
1 Effectively Managing Global Engineering Licenses Kimberley A. Dillman IT Solution Architect – Engineering Delphi Corporation
Fundamentals of ISO.
The BIM Project Execution Planning Procedure
Best Practices for Documenting Software Licensing Compliance Presented By Mike Ludwig and Peggy Fish.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
DPW BD&C Employee Performance Evaluation Guideline Discussion
Systems Analysis and Design: The Big Picture
S/W Project Management
Copyright Course Technology 1999
MEDIN Data Guidelines. Data Guidelines Documents with tables and Excel versions of tables which are organised on a thematic basis which consider the actual.
Drilling Data Management System
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Mapping the Big Picture Curriculum Mapping for Integrating Curriculum and Assessment in K – 12 By Cristiana A. Baggio
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
Controlled Vocabularies (Term Lists). Controlled Vocabs Literally - A list of terms to choose from Aim is to promote the use of common vocabularies so.
MEASUREMENT PLAN SOFTWARE MEASUREMENT & ANALYSIS Team Assignment 15
ITEC224 Database Programming
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
INFORMATION ASSURANCE USING C OBI T MEYCOR C OBI T CSA & MEYCOR C OBI T AG TOOLS.
Why We Create Metadata and How it is Useful Bruce Godfrey University of Idaho Library INSIDE Idaho
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
D1.HGE.CL7.01 D1.HGA.CL6.08 Slide 1. Introduction Design, prepare and present reports  Classroom schedule  Trainer contact details  Assessments  Resources:
AREVA T&D Security Focus Group - 09/14/091 Security Focus Group A Vendor & Customer Collaboration EMS Users Conference September 14, 2009 Rich White AREVA.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Copyright 2002 Prentice-Hall, Inc. 1.1 Modern Systems Analysis and Design Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 1 The Systems Development.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
Lecture # 3 & 4 Chapter # 2 Database System Concepts and Architecture Muhammad Emran Database Systems 1.
1 Chapter Nine Conducting the IT Audit Lecture Outline Audit Standards IT Audit Life Cycle Four Main Types of IT Audits Using COBIT to Perform an Audit.
IS 325 Notes for Wednesday August 28, Data is the Core of the Enterprise.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Demonstrate employability skills required by business and industry.  The following elements should be integrated throughout the content of this course.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
Curriculum Mapping Educating for the Future.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
IMPLEMENTING LEAPS IN CENTRAL AND EASTERN EUROPE: TRAINERS’ HANDBOOK Monitoring and Evaluating Results.
Revised Quality Assurance Arrangements for Registered Training Organisations Strengthening our commitment to quality - COAG February 2006 September 2006.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Module 1 IAEA Safety Standards on Management Systems.
Presentation transcript:

Managing Contractors & Survey Data Presented by Bruce Carter

Data acquired by field survey for a specific purpose is the “basis” for the entire project! Quality and detail are essential; not only from the spatial positioning of the event, but the collection of the supporting information associated with the elements, foreign lines, and surface features An “as built” survey of the exposed pipeline (open ditch or subsea) is critical to developing the most complete database relative to the project possible. Field Data Acquired by Survey

A set of detailed general guidelines and standards that have been adopted by the client’s management for the data acquisition Thorough and clear communications of the Scope of Work specific to the actual project acquisition requirements and deliverables Legitimate QC/QA of data acquisition and processing Key Elements to Managing Survey Contractors Coordination between data acquisition activities and other operations in the project area (SYMOPS)

Positional accuracy requirements covering survey and mapping activities relative to the project Competency requirements for the various levels of contractor skill sets HSE requirements relative to contractor’s work history, survey procedures to be implemented, and personnel’s “fit to work” General Guidelines and Standards Deliverable formats and requirements for raw and processed survey data relative to the project

The end result and intended use must be defined before the scope of work can be derived Detailed description of work to be performed must be clearly communicated to insure that the appropriate results are achieved While the scope of work must be clearly defined, it must also be a “flexible” document with the understanding that some details may change to accommodate unforeseen circumstances when identified as the acquisition is being conducted Project Specific Scope of Work Scope revisions must be uniformly communicated and documented so that all parties are on the same program

Local HSE requirements and procedures Scheduling around other activities (construction, drilling, completions, etc.) Regulatory Simultaneous Operations (SYMOPS) Surface notifications and restrictions

Field coordination to maintain consistency in data acquisition, recording, and reporting procedures Daily production reports Collection and “independent” processing of raw acquisition data QC/QA Comparison of acquired data with other existing database information (redundancy)

Data acquired by field survey for a specific purpose is the “basis” for the entire project! RESPECT THE EFFORT AND EXPENSE THAT’S BEEN AFFORDED TO THE INTEGRITY DURING THE ACQUISITION! Quality and detail are essential! The integrity of the data begins with the knowledge and experience of the user of the data mapping and management applications; not the application itself. Maintaining the Integrity of Data Acquired by Survey Mapping applications provide the user with many options. Manipulate the data because you “need” to; not just because you “want” to, or worse, just because you “can”!

A set of detailed guidelines and standards that have been adopted by the client’s management for the data acquisition Thorough and clear understanding of the client’s intended purpose and use of the defined deliverables as well as delivery schedule Implement industry standard applications and procedures for processing required deliverables Key Elements to Managing Surveyed Data Respect the “hierarchy order” of data integrity when manipulating and managing data

Defined data formats and positional frame of reference (CRS) requirements relative to the project deliverables Third party data delivery and accuracy requirements should that be a part of the required deliverables General Guidelines and Standards Amount of “creative license” can be determined from the content and detail demonstrated by the client’s documents

Detailed use of deliverables must be clearly discussed to insure that the appropriate results are achieved Delivery timelines are critical to the client; whether you are a consultant to an operating company, or a company’s internal service provider, you have a client dependent upon the final product Scope of Anticipated Use and Delivery Schedule The time to revise the deliverable formats or time lines is before the processing is initiated; not afterward!

The hierarchy of data is determined by the quality of the source The quality of the source is determined by the acquisition specifications and procedures Proprietary field surveyed data Hierarchy of Data Proprietary remotely sensed data with ground control survey Documented third party field survey Remotely sensed data with documented ground control survey Documented table top generated data Undocumented data from any source should be considered only under special circumstances

The time has passed for implementation of non-standard applications for generating deliverables in the industry Beware of potential issues with some industry standard applications that could possibly delivery erroneous spatial data Question application providers to insure that spatial data conversion engines contained in their software are GIGS (Geospatial Integrity of Geosciences Software) compliant Industry Standards and Applications

Questions/Comments

Bruce Carter Member of the “Gray Haired Brigade”