ALADIN A transition year EWGLAM/SRNWP, Dubrovnik, 8/10/07.

Slides:



Advertisements
Similar presentations
ALARO-0 at ZAMG Experiences, verification, identified problems, ….
Advertisements

Assimilation of radar data - research plan
ALARO-0 experience in Hungary1 Mihály Szűcs Hungarian Meteorological Service ALARO-1 Working Days, June 2012, Ljubljana, Slovenia.
Hirlam Physics Developments Sander Tijm Hirlam Project leader for physics.
Page 1 NAE 4DVAR Oct 2006 © Crown copyright 2006 Mark Naylor Data Assimilation, NWP NAE 4D-Var – Testing and Issues EWGLAM/SRNWP meeting Zurich 9 th -12.
1 October 26, th COPS Workshop, Cambridge, UK COPS (Convective and Orographically-induced Precipitation Study) Goal: Advance the quality of forecasts.
COSMO Workpackage No First Results on Verification of LMK Test Runs Basing on SYNOP Data Lenz, Claus-Jürgen; Damrath, Ulrich
Towards Rapid Update Cycling for Short Range NWP Forecasts in the HIRLAM Community WMO/WWRP Workshop on Use of NWP for Nowcasting UCAR Center Green Campus,
February High Impact Weather Workshop 1 JCSDA-HFIP and -ECMWF Workshop Recommendations Lars Peter Riishojgaard and Sid Boukabara Joint Center for.
Diana-Corina BOSTAN National Meteorological Administration ROMANIA.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss The Latent Heat Nudging Scheme of COSMO EWGLAM/SRNWP Meeting,
2/06/2004ALADIN Workshop, Innsbruck1 The general problem of moist processes in ALADIN-2 J.-F. Geleyn ALADIN-2/CHMI (Prague) & Météo-France (Toulouse)
Daily runs and real time assimilation during the COPS campaign with AROME Pierre Brousseau, Y. Seity, G. Hello, S. Malardel, C. Fisher, L. Berre, T. Montemerle,
Participation in MAP D-PHASE / COPS Description of MAP D-PHASE project Implementation strategy Key relevant features of GEM v3.3.0 Overview of verification.
Weather Forecasting - II. Review The forecasting of weather by high-speed computers is known as numerical weather prediction. Mathematical models that.
SRNWP workshop - Bologne Short range ensemble forecasting at Météo-France status and plans J. Nicolau, Météo-France.
Verification Precipitation verification (overestimation): a common view of the behaviour of the LM, aLMo and LAMI Francis Schubiger and Pirmin Kaufmann,
HIRLAM-A status and plans J. Onvlee EWGLAM meeting Dubrovnik,
Prague'03 / Physics & its interfacing Physics & its interfacing – the AROME case J.-F. Geleyn & L. Gérard I) Generalities II) Challenges & likely problems.
29th EWGLAM meeting, Dubrovnik, October 2007 ALARO Physics developments Neva Pristov LACE Working group for physics.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
Meso-γ 3D-Var Assimilation of Surface measurements : Impact on short-range high-resolution simulations Geneviève Jaubert, Ludovic Auger, Nathalie Colombon,
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss High Resolution Snow Analysis for COSMO
COSMO General Meeting, Offenbach, 7 – 11 Sept Dependance of bias on initial time of forecasts 1 WG1 Overview
29th EWGLAM Meeting HIRLAM-A Verification Xiaohua Yang with contributions from Kees Kok, Sami Niemela, Sander Tijm, Bent Sass, Niels W. Nilsen, Flemming.
Prague' 03 - Convergence1 Convergence between the ALADIN and AROME projects: opportunity and challenges I)Motivation II)Issues III)Partnerships IV)New.
08-11 Oct th EWGLAM, Dubrovnik1 Activities & Plans 2007 Dijana Klaric Met service of Croatia RC LACE Project Leader.
RC LACE 27th EWGLAM Meeting 3-5 October 2005, Ljubljana1.
The ALADIN-France Limited-Area Model Joël Stein Marc Tardy Hervé Bénichou.
Outline Background Highlights of NCAR’s R&D efforts A proposed 5-year plan for CWB Final remarks.
Potential Benefits of Multiple-Doppler Radar Data to Quantitative Precipitation Forecasting: Assimilation of Simulated Data Using WRF-3DVAR System Soichiro.
RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1.
HARMONIE a common effort of HIRLAM, ALADIN and LACE on high resolution modelling Jeanette Onvlee COSMO General Meeting Cracow,
26 th EWGLAM & 11 th SRNWP meetings, Oslo, Norway, 4 th - 7 th October 2004 Stjepan Ivatek-Šahdan RC LACE Data Manager Croatian Meteorological and Hydrological.
Use of radar data in ALADIN Marián Jurašek Slovak Hydrometeorological Institute.
Computing at Météo-France CAS 2003, Annecy 1.News from computers 2.News from models.
Page 1© Crown copyright 2004 SRNWP Lead Centre Report on Data Assimilation 2005 for EWGLAM/SRNWP Annual Meeting October 2005, Ljubljana, Slovenia.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of the COSMO-1 configuration at MeteoSwiss Guy.
ALADIN Workshop 2004, Innsbruck 1 Subjective evaluation of different versions of ALADIN/HU Helga Tóth, HMS.
Progress Report!for 2003 INM Operational system in use at the end of 2003 (I) The operational system is still based on HIRLAM version.
Trials of a 1km Version of the Unified Model for Short Range Forecasting of Convective Events Humphrey Lean, Susan Ballard, Peter Clark, Mark Dixon, Zhihong.
MSG cloud mask initialisation in hydrostatic and non-hydrostatic NWP models Sibbo van der Veen KNMI De Bilt, The Netherlands EMS conference, September.
Page 1© Crown copyright 2005 DEVELOPMENT OF 1- 4KM RESOLUTION DATA ASSIMILATION FOR NOWCASTING AT THE MET OFFICE Sue Ballard, September 2005 Z. Li, M.
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
Land-Surface evolution forced by predicted precipitation corrected by high-frequency radar/satellite assimilation – the RUC Coupled Data Assimilation System.
Climate Prediction and Products Breakout CTB Meeting November 10, 2015.
ALADIN 3DVAR at the Hungarian Meteorological Service 1 _____________________________________________________________________________________ 27th EWGLAM.
OSEs with HIRLAM and HARMONIE for EUCOS Nils Gustafsson, SMHI Sigurdur Thorsteinsson, IMO John de Vries, KNMI Roger Randriamampianina, met.no.
Implementation and validation of a prognostic large-scale cloud and precipitation scheme in ARPEGE precipitation scheme in ARPEGE (F.Bouyssel,Y.Bouteloup,
Highlights of recent HIRLAM activities Jeanette Onvlee ASM/Workshop
E. Bazile, C. Soci, F. Besson & ?? UERRA meeting Exeter, March 2014 Surface Re-Analysis and Uncertainties for.
© Crown copyright Met Office Review topic – Impact of High-Resolution Data Assimilation Bruce Macpherson, Christoph Schraff, Claude Fischer EWGLAM, 2009.
Numerical simulations of the severe rainfall in Pula, Croatia, on 25 th September 2010 Antonio Stanešić, Stjepan Ivatek-Šahdan, Martina Tudor and Dunja.
Responsible member: Hungarian Meteorological Service Period:
ALADIN 08/09: achievements, problems & outlook
Progress in development of HARMONIE 3D-Var and 4D-Var Contributions from Magnus Lindskog, Roger Randriamampianina, Ulf Andrae, Ole Vignes, Carlos Geijo,
Recent evolutions in Arpege and Aladin-MF models
met.no – SMHI experiences with ALARO
HIRLAM mesoscale report
Operational HIRLAM NWP & Status of the Reference Systems Xiaohua Yang
Studies in HARMONIE 3D-Var with 3 hourly rapid update cycling
Highlights of activities
Center for Analysis and Prediction of Storms (CAPS) Briefing by Ming Xue, Director CAPS is one of the 1st NSF Science and Technology Centers established.
Recent changes in the ALADIN operational suite
New Developments in Aviation Forecast Guidance from the RUC
Operational Aladin-Belgium

Poster Session: Numerical Weather Prediction at MeteoSwiss
NWP activities in Austria in 2006/2007 Y. Wang
Presentation transcript:

ALADIN A transition year EWGLAM/SRNWP, Dubrovnik, 8/10/07

ALADIN 2006=>2007 Preparation of the ALADIN strategic 10 year plan –Collective effort from: An ad-hoc ‘taskforce’ Policy Advisory Committee PM and an editing mini-group –Final version hopefully available in November (quite needed to go to a multi/year planning structure (some lack of continuity in current long-term oriented efforts) AROME preparing for 2008 operational implementation in Toulouse. ALARO also (with some partial steps at ~10km [i.e. without 3MT yet], Cz, At …).

Operational implementation schedule Examples: the good and the bad Outlook News about AROME (as of Oct 07)‏

Operational implementation plan at MF dyn. adaptation test runs 3DVar assimilation test runs preoperational test suite operational production Arome v1 oper. prod. Arome v2 forecasters feedback & getting used to model behaviour R&D Doppler radar assimilationR&D reflectivity, convection & clouds assimilation nowcasting & relocatable versions optimisation on MF's NEC

The Arome-France model config Arome-France current domain Aladin-France domain

Some other AROMEs... Alps (MAP D-PHASE experiment)‏ ongoing test runs by HIRLAM partners (FMI, DMI, SMHI)‏ and some more (Hungary...)‏

Here on a Paris thunderstorm case, missed by the lower resolution ALADIN assimilation, and by AROME in dynamical adaptation mode. The improvement comes from low-level SYNOP T,HU,wind obs Short-range forecast improvement thanks to local data assimilation obs dyn. adaptation fc from assimilation 3-h rain forecast

A typical nice forecast of low clouds model cloudy areas

A tendency to overpredict density currents near thunderstorms: under investigation

The 10km mesh base-line is stabilised and is already operationally or (pre-operationally) implemented, with good objective scores, especially for precipitations. The work on the 5km mesh convective package (integrated, prognostic and multi-scale-oriented => 3MT) is ongoing, hard (upper-air scores just at break-even) but promising. A word about ALARO

3MT

3MT: precip. outcome (provisional) Without 3MT With 3MT

Outlook (until next EWGLAM)  For AROME:  scientific work priorities: turbulence (i.e. numerical diffusion vs subgrid turbulence), physics/dynamics interaction in convective clouds, initialisation of precipitating clouds;  increase vertical resolution.  For ALARO:  Concretise the first good results with the full configuration;  Go back to check the scale independency again;  Create the conditions for a good oper support.