ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.

Slides:



Advertisements
Similar presentations
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
RF-Gun cavity for high charge electron generation Takuya Natsui.
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland February 2014.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
High power RF capabilities From Two 50 MW Klystrons Variable iris Variable Delay line length through variable mode converter Gate Valves Two experimental.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
AWAKE electron source New Electron Source WP at CERN
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Synopsis The current PAD incarnation with 119 MHz acquisition fails to resolve pulse shape to required resolution. This resolution is required not only.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
Operational SNS Karen S. White Controls Group Leader 10/11/10.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
SLAC ARD Test Facilities Tor Raubenheimer December 8 th, 2010.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
The recent history and current state of the linac control system Tom Himel Dec 1,
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
Advanced Energy Systems Inc. P.O. Box 7455, Princeton, NJ Phone:(609) Fax:(609) Jangho.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
High gradient study at KEK CLIC08, Oct , 2008 T. Higo.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland December 2013.
MAX IV linac overview and scope of automation Sara Thorin.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Areal RF Station A. Vardanyan
MicroTCA Development and Status
Diagnostic & Control Status
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
LLRF systems status update
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
SPARC RF gun status by P. Musumeci Review committee
X-band Facilities and High Gradient Tests Stands Around the World
Recent high-gradient testing results from the CLIC XBoxes
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
High Level applications development status
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac LLP Outline LINAC Long Lead Procurements
CLIC Feasibility Demonstration at CTF3
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Presentation transcript:

ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer

ASTA: Accelerator Structure Test Area High gradient X-band testing of accelerator structures (regularly exceeding 100 MV/m gradient) Up to ~200 MW peak power delivered to the structure by combining the power of two XL4 klystrons into a delay line SLED system. Consists of two modulators, two klystrons, delay lines for SLED, a radiation enclosure, PPS system, interlocked vacuum and cooling water systems, llrf system, diagnostics and data acquisition.. In the past used for S-Band RF gun testing incorporating a cathode laser system and small beam line with a beam spectrometer.

SRS 60 Hz AFG TWTK K llrf configuration I&Q MIXER I&Q MIXER SRS DG645 4 port combiner no SLED SLED

K K high power rf configuration

Breakdown rates vs gradient forward power reflected power faraday cup 1 faraday cup 2 Faraday cup signals register breakdowns and inhibit further pulses to prevent damage to the structure. Gradient is calculated.

DAQ/MPS existing configuration VAC controllers VAC1-2:Klystron VAC3-16: WG to DUT to load Power meters Faraday cup signals DUT FE/RE Klystron RE MPS Trigger inhibit(soft) Modulator trip(hard)

DAQ/MPS issues High bandwidth DAQ and MPS handled by one windows computer running several labview/C++ programs – data bottleneck causes missed MPS triggers – no data sharing or analysis possible during running – Complexity of the labview programs cannot be easily modified or scaled up

Control center electrically and acoustically noisy, hot

Upgrading ASTA Operational upgrades are required to satisfy existing and new user demands: SLAC X-band program, CERN, Japan, LCLS RF gun cathode characterization. Improved DAQ: user and operations access to real time and archived data: (EPICS a la LCLS, dedicated network). Correlate everything with everything else. Extract phase information to track breakdown locations within the structure. Real measurement of achieved gradient and dark current energy spectrum. Unattended and remote operations (a la NLCTA with a fire suppression system) Go to PAC/PAD llrf system Reestablish S-band RF and UV laser systems

DAQ/MPS proposed configuration VAC controllers VAC1-2:Klystron VAC3-16: WG to DUT to load Power meters Faraday cup signals DUT FE/RE Klystron RE MPS Trigger inhibit Modulator trip(hard)

DAQ/MPS upgrades EPICS handles most of the DAQ and MPS – Remote monitoring and operation – Complex labview programs continue to operate with EPICS IO Server for LabVIEW – Move LabVIEW functionality to EPICS

Gradient measurements Existing spectrometer is a damping ring magnet designed for 200 MeV gun testing. Unwieldy. Maximum of ~20-40 MeV of dark current expected for single small accelerator structure testing. which could be handled by a more compact spectrometer.

Use spare NLCTA chicane magnet 2 hours of work to put together (D. Walz)

Faraday cups on the straight ahead line to measure total charge Electrodes on offaxis lines for intensity Add an additional pumpout port to get the device closer to the structure Provision for small water cooling lines or lower duty cycle to achieve higher fields.

Where we are with DAQ/MPS Infrastructure: ADC modules, VME crate, terminal server, GPIB interface, EPICS computer, network switch and network are on hand or in place. Set up EPICS: Require some expertise in setup. Install and configure the EPICS software. Write or install drivers.

Where we are with phase extraction Feasibility study shows phase can be extracted. Further study ongoing to see if we have the resolution to determine breakdown location. Implementation is next (January 2011). Reflected energy envelope during a breakdown Computed phase

Upgrading ASTA: big ticket items Real measurement of achieved gradient and dark current energy spectrum: Magnet is available. Vacuum chamber in preliminary design stage. After $, its a one month timescale for final design and fabrication Unattended and remote operations (a la NLCTA with a fire suppression system) Modulators have been evaluated for fire protection. $$ BAS ASE changes to follow NLCTA precedent. PAC/PAD system being implemented in NLCTA. Can it be used for experimental DAQ? Reestablish S-band RF and UV laser systems. $$$ Waveguide can be reconnected. TS1 changed to dedicated S-band PPS upgraded and/or re-commissioned Laser systems EPICs will allow easy porting of LCLS apps