Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.

Slides:



Advertisements
Similar presentations
Electrical Circuits.
Advertisements

Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
Hongjie Zhang Purge gas flow impact on tritium permeation Integrated simulation on tritium permeation in the solid breeder unit FNST, August 18-20, 2009.
RockOn! Canister Integration RockOn! 2009.
Click on this image to open the full PDF document.
Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.
Experiment 8 : Minor Losses
Introducing the Mobile Sink with Cabinet Base and Self Contained Water Supply BH, Inc.
© 2003 Swagelok Company MPC Series Modular Platform Components.
"AIR COOLER" Heat Exchanger
ENERGY CONVERSION ES 832a Eric Savory Lecture 11 – A small-scale power plant worked example Department of Mechanical.
Diesel Engine 4 Stroke Cycle model
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Nonlinear Dynamics Laboratory Equipment Andrew DickJoe Houtz Jeremy RedleckiAshley Rice James Streeter Client: Mechanical Engineering Dept. at RITFaculty.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
NOAA Humidifier – smaller (lower flow) version (yours will have larger tubing and fittings) Ribbon heater Thermal cutoff switch Swagelok reducing union,
Replacing board in CLAP Tools: Flashlight (torch for those of you in Cape Town)) small philips screwdriver spacer tool* dish to hold screws 2 rolls of.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
“Fix Tube Sheet” Heat Exchanger
Vacuum system.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
Objectives 1.00 – 3.00 EOC INFO VERY VERY IMPORTANT READ and REMEMBER.
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
Week 10 Review: Old Business Documents P15080 Katelyn Busse Collin Burkhart Michelle Garafolo Robert Repetti Morgan Stoessel Sarah Tran.
Combined April and May 2007 Monthly Report
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
JFTOT Analysis 1 Preparation for test: 1. Inspect all O-Rings for degradation/cuts. 2 Assembly of Heater Tube Test Section: 1.Always use new tubes, o-rings,
Nanofluidic Characterization David Sharp David West Justin Davis.
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
P08441:Thermoelectric Auto Exhaust Power Generation Project Introduction : The motivation for this project stems from an increasing need for highly efficient.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Subsystem Build & Test Review
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Camera PDR/CD1 Planning 19 September 2008
Engine Lubrication Systems
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Date of download: 10/9/2017 Copyright © ASME. All rights reserved.
ENGINE MODE CODES.
Update on He3 Services design since the ORNL meeting
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
SKC IS PROUD TO INTRODUCE A NEW LOW FLOW SAMPLING PUMP
P16081: Systemic Circulation Detailed Design Review
Plate Heat Exchanger (PHE)
Multi-Disciplinary Senior Design
Diesel Engine 4 Stroke Cycle model
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
Detailed Design Review Solar Thermal Water Heater
Team P15441 Mini Air Sub-System Design Review
Mechanical Bioreactor
Detailed Design Review (Phase 4)
Detailed Design Review Solar Thermal Water Heater
Detailed Design Review: P18001
P18250 ‘Smart Buoy’ Phase 7 Customer Update
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Q2 Bus Update C. Narug, R. Bossert 6/27/2019.
Presentation transcript:

Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014

Engineering Requirements ● No changes have been made since last meeting ● Document is under change control ● Most important ERs are: o Shear Stress o Assembly Time o Size of Flow Channel EDGE Link

System Model/Architecture/Design Growth chamber design changes: o Minor updates to system architecture diagram and interfaces document o Generated new 3-D model of growth chamber o Verified chamber can be integrated into system o Verifying lid thickness and attachment mechanism is appropriate Chamber/System Integration Link

Pump Cell Chamber Media Reservoir Electricity Flow Rate Cells Microscopes Alternate Reservoir Media Media Color HeatCO 2 Water Pan ArchitectureColor Structure Energy Information Materials Incubator Filter System Architecture Media in Tubing Light CO 2 (moves while still attached) Pump Setting (swap) (pumped into incubator) Heating Element Power Cord Fresh Media (seeded) Microscope Slide Lid (in a groove with a gasket) Base 4 Bolts and 4 Wing Nuts (lid has gasket)

Growth Chamber Wing Nuts Lid Cap Metric Microscope Slides Lid and Slide Gaskets Body Base Cap Bolts ●Aluminum ” x 2.5” x 0.5” body sandwiched by two layers of 0.25” polycarbonate ●1 mm x 1 mm rubber gasket fits around channel, bolts keep lid pressed down to seal top of channel ●1 mm x 2 mm rubber gasket fits around either slide recession, tight fit of slides maintains a seal on bottom of channel ●Four 0.25” bolts run through corners of chamber and keep the system together, used with wing nuts to be tightened manually

Growth Chamber Connections Threaded Inlet/Outlet Holes Threaded Luer Adapter Male Luer Adapter 3-Way Stopcock Female Luer Adapter ●All components are polycarbonate and are autoclavable ●Threaded Luer adapters fit into the chamber inlet and outlet holes ●The threaded Luer adapters connect to a male or female Luer adapter each (both are compatible) ●A short section of tubing will be attached next ●A female or male Luer adapter connects to both open tubing ends ●3-way stopcocks connect to the Luer adapters, oriented as needed (to accommodate a male or female adapter) ●A second 3-way stopcock will be added to each side ●The appropriate Luer adapter (opposite of the last type used) connects to the open stopcocks ●The system’s inlet and outlet tubes can now connect to these adapters and connect the growth chamber

Feasibility Analysis: Lid Deflection

Feasibility Analysis: Flow Required to achieve 2 Pa of shear stress on cells. Q = 640 mL/min

Feasibility Analysis: Flow Pressure Drop is approximately 582 Pa

Feasibility Analysis: Flow Conclusion: Design is feasible! ●Reaches 2 Pa requirement Pump requirements confirmed. ●Flow range ●Tubing Size

CAD Drawing

Risk Analysis ●Risk is decreasing nicely ●Largest Risks ○ Control of pump ○ Sterility ○ Incubator/Pump Interface ●All risks that had a deadline of 11/13/14 to be driven to zero are zero ●Linked parts on BOM to Risk Analysis ●Linked risks to feasibility models ○ Some feasibility still in progress ●Linked risks to Test Plans

Project Plan

To Do: ● Deflection Discussion with SME o Develop COMSOL deflection model and verify Analytical Model ● Final Drawings o Draft Final Drawings o Brinkman evaluation of tolerances/design and quote ● Quotes and Purchase Orders and Lead Times o Tubing, Luers, Stopcocks ● Begin Pump Testing o Locate Tubing within BME Dept.

Critical Path Into Phase 5

Efficiency ● Average Efficiency Last Phase:70% ● Average Efficiency This Phase: 89% Overall efficiency has improved this phase o Realistic Deadlines o Better communication ● Ways to Improve Further o Consider other coursework when setting deadlines

HW/SW Design This is not applicable to our project.

Initial Budget and BOM ● Ordered Pump ● Total Projected Budget is $ o Need to request quotes o Need to finalize shipping costs and discounts ● Parts linked to risks ● Part numbers linked to design drawings Link

Part-Linked Media System

Part-Linked Growth Chamber

Part-Linked Complete System Not Shown: ● Incubator ● Cells ● Gaskets ● Nuts ● Bolts

Assembly Process ● Previously completed a preliminary assembly procedure ● Revisions to account for growth chamber design changes ● Likely will be adjusted during construction in MSD II

Test Plan Outline ● Added two test plans o Tubing in Incubator Door o Blockage of Flow-Ajar Microscopes ● Plan to add more as ideas come and materials arrive Link

Self Assessment ● Important to have accountability partners o Have others double check work! ● Important to ask for other group members opinions ● Recognize costs - they add up quickly! ● Balance with other coursework