CBM-MPD STS consortium – status of activities Yuri Murin for the Consortium –Engineering of STS module, ladder, station –Cooling system concept and plans.

Slides:



Advertisements
Similar presentations
Heat Pipe Final Industrial Training Presentation
Advertisements

Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
8-3-05Jens Jørgen Gaardhøje. NBI. ALICE-CR5 1 ALICE Forward Detectors Technical Design Report Editorial team: I.G. Bearden (NBI) H. Bøggild (NBI) C.Holm.
Silicon Preshower for the CMS: BARC Participation
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Multichannel readout system of inner tracker for NICA-MPD Rogov Victor AFI, JINR, Dubna Afi.jinr.ru.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Sergey Belogurov, ITEP, Moscow STS CAD model. GSI, STS mechanics: Conceptual CAD model development Sergey Belogurov ITEP, Moscow Engineer: Sergey.
15. CBM Collaboration Meeting, GSI, Darmstadt, April 12–16, 2010 Status of Front End Electronics N-XYTER PCBs & Power Supply Volker Kleipa, GSI Darmstadt.
Tracker Upgrade Week –Sensors Meeting Sensor Production 24. July 2014 Marko Dragicevic.
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 16 October 2008 CBMCBM Status.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser CBM Collaboration Meeting GSI, 15 April 2010 Status of the CBM Silicon Tracking.
23 rd World Gas Conference 5 – 9 June 2006 Amsterdam Full Scale Qualification Trials and Certification of the AMPLITUDE-LNG LOADING SYSTEM Phillip COX.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
1 The 3-rd Work Meeting of the CBM -MPD STS Consortium “Technical challenges of the CBM and MPD Silicon Tracking Systems 2009” THE CABLES FOR THE CABLES.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
R&D status of FPCCD VTX and its cooling system Yasuhiro Sugimoto for FPCCD VTX group 1.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Minni Singla & Sudeep Chatterji Goethe University, Frankfurt Development of radiation hard silicon microstrip detectors for the CBM experiment Special.
Module Development Plan I believe that we are ready to proceed to a program to demonstrate a PS module based on “2.5 D” interconnections. This is based.
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI 13-th CBM,
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
News on microstrip detector R&D —Quality assurance tests— Anton Lymanets, Johann Heuser 12 th CBM collaboration meeting Dubna, October
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Status of RF stations for NICA project MAC meeting october 2015.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser CBM Collaboration Meeting GSI Darmstadt, 12 March 2009 Status of the CBM Silicon.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI
09 September 2010 Erik Huemer (HEPHY Vienna) Upgrade of the CMS Tracker for High Luminosity Operation OEPG Jahrestagung 2010.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Projekt „ESSNBS“ Niš, November 4 th – 7 th, DAAD Wireless Measurement System for Environmental Monitoring and Control MM. Srbinovska, V. Dimcev,
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
KHARKOV TEAM ACTIVITIES FOR CBM WITHIN THE STCU PROJECT P602 1 Representatives: Prof. Slava Borshchov.
Design and development of thin double side silicon microstrip sensors for CBM experiment Mikhail Merkin Skobeltsyn Institute of Nuclear Physics Moscow.
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
Si Sensors for Additional Tracker
BM&N STS ladders assembly in VLHEP
Physics and Calorimeter Requirements
n-XYTER Hybrid Developments
Progress with System Integration of the CBM Silicon Tracking Detector
Technical Design for the Mu3e Detector
STS Work Meeting on CBM and JINR VB-LHEP, May 2017
Mechanics: (Tim).
10/month is the present production rate 2 FTE + sporadic contributions
MicroMegas Mechanical Meeting --- Cern April 2014
Work packages status in Torino and perspectives
Design and fabrication of Endcap prototype sensors (petalet)
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Vertex Detector Overview Prototypes R&D Plans Summary.
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
Presentation transcript:

CBM-MPD STS consortium – status of activities Yuri Murin for the Consortium –Engineering of STS module, ladder, station –Cooling system concept and plans for prototyping –Demonstrator development –Sensor development –Radiation hardness certification –Preparations for the in-beam tests –Infrastucture improvement –Networking

Engineering of STS module, ladder, station –Ladders: Engineering of the non-central ladders is accomplished with ANSIS calculations of mechanical properties of CF space forms manufactured of prepregs with different Young modulus (Report) –Modules: See Demonstrator plans –Station: Base technical solutions is defined

Demonstrator development (SE SERTIIE) – Three types of demonstrators in production phase – Two more types are discussed

Cooling system concept and plans for prototyping –ANSYS calculation with cooling of sensors with different gases (Report) –Plans for the first cooling Demonstrator#1

Sensor development within ISTC Project (SINP MSU and RIMST ) –Photomasks for first pilot batch of CBM STS sensors of size mm 2 –First 10 wafers for cabling mock-ups manufactured –Sensors are expected in April 2010

Radiation hardness certification (KRI and SINP MSU) –Irradiation of pad test structures (CIS and RIMST) for adjusting the procedures is accomplished – Good agreement with known data on current degradation for high doses. –Not so good for low doses, but might be it because of mistakes in dose measurements. –Expected behavior for full depletion voltage –We are almost ready for real work!!!

Preparations for the in-beam tests –Ru-106 source + Demonstrator-0B-bench tests (on going) – Slow Control System for in-beam tests (accomplished)

Infrastucture improvement –Procurement of bonding automat for SE SRTIIE by JINR –Continuation of restoration of rooms to house ladder assembling lab at JINR

Networking –Organization of the 3-d Work Meeting in Karelia –Plans for the 4-th Work Meeting in Germany

Urgent task #1 –Simulations of realistic STS with central 4 rad/hard sensors with R-φ topology –Size of the quadrant 60x60 with 1024 strips of each kind

Urgent task #2 –Let’s start to resolve “the station ##1-2 problem” and simulate disc-like stations #1 and #2 built of 24 wedges each

Final remark –We are speeding into engineering phase aware that it will take 4-5 years to raise STS up – Neighboring STS work packages i.e. “the pipe” and “the FEE board” defining the crucial numbers for us are well behind and should be accelerated by all means –Thanks to all for the attention! Acknowledgments to all Consortium members for their contributions!