TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – 28.06.04 CALTECH.

Slides:



Advertisements
Similar presentations
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Advertisements

Review XFEL Injector Introduction K. Floettmann
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Does the short pulse mode need energy recovery? Rep. rateBeam 5GeV 100MHz 500MWAbsolutely 10MHz 50MW Maybe 1MHz 5MW 100kHz.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Low Emittance RF Gun Developments for PAL-XFEL
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
DESY / Hans Weise TTF / VUV-FEL Status and Some Words of Fast Kickers Hans Weise / DESY DESY meeting with KEK ILC Delegation (March 7th 2005)
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Horizontal Test Stands and CC2 Results Andy Hocker Testing an alternative ILC cavity design at USPAS (Q 0 =2.23E+02)
Nick Walker (DESY) John Carwardine (ANL) GDE ILC10 Beijing March 2010 Cryomodule String Test: TTF/FLASH 9mA Experiment.
K.Honkavaara, LCLS ICW06 LCLS Injector Commissioning Workshop, SLAC, October 9-11, 2006 Linac Experience at FLASH Katja Honkavaara University of Hamburg.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
@ Fermilab ILC bunch-compressor and linac rf requirements Sergei Nagaitsev Fermilab Feb. 9, 2006.
TESLA Linear Collider project overview and linac technology R. Brinkmann, DESY ITRP Meeting, RAL Jan. 28, 2004.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
THE ANDRZEJ SOŁTAN INSTITUTE FOR NUCLEAR STUDIES INSTYTUT PROBLEMÓW JADROWYCH im. Andrzeja Sołtana
ILC Program discussion M. Ross TTF2 - long term schedule Modul status Plans for production (Hans Weise and Bernd Petersen – TESLA Coll. Technical.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
S2 Progress Report for EC H. Padamsee and Tom Himel For the S2 Task Force.
Operation Status of the RF Systems and Taiwan Photon Source
Beam dynamics for an X-band LINAC driving a 1 keV FEL
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
E-XFEL Status and First Beam Results
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Chris Adolphsen Sergei Nagaitsev
Notkestrasse 85, Hamburg, Germany
Measurements, ideas, curiosities
Accelerator Layout and Parameters
CW Operation of XFEL Modules
Revised Commissioning Strategy
XFEL Project (accelerator) Overview and recent developments
Electron Source Configuration
Nick Walker (DESY) EU GDE Meeting Oxford
LCLS Injector Commissioning Dates ( )
Injector: What is needed to improve the beam quality?
EU-XFEL summary of performance degradation
LCLS Commissioning Parameters
Linac/BC1 Commissioning P
CLIC Feasibility Demonstration at CTF3
Operational Experience with LCLS RF systems
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
SNS-PPU upgrades the existing accelerator structure
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH

Overview  Brief review of TTF activity this year Commissioning status / updateCommissioning status / update  Status of Technology  Future plans

TTF-II 800 MeV SC linac RF gun 4 MeV150 MeV bunch compressor ACC1 (M2*) Laser 3 rd harmonic cavity diagnostic section beam dump 12 MV/m20 MV/m ACC2(M1*) ACC3(M3*) ACC4(M4) ACC5(M5) Successfully commissioned with beam Successfully commissioned with RF power (hp coupler conditioning)

TTF-II 800 MeV SC linac RF gun 4 MeV150 MeV bunch compressor ACC1 (M2*) Laser 3 rd harmonic cavity diagnostic section beam dump 12 MV/m20 MV/m ACC2(M1*) ACC3(M3*) ACC4(M4) ACC5(M5) Dark current & radiation measurements at 25MV/m  Pagani

TTF-II Injector Commissioning RF gun 4 MeV150 MeV bunch compressor ACC1 (M2*) ACC2(M1*) ACC3(M3*) Laser 3 rd harmonic cavity diagnostic section beam dump 12 MV/m20 MV/m  RF Gun: 21-Feb-2004 start conditioning21-Feb-2004 start conditioning 6-Mar Hz, 900 us, 3 MW6-Mar Hz, 900 us, 3 MW 16-Mar Hz, 450 us, 3 MW16-Mar Hz, 450 us, 3 MW 17-Mar-2004 first beam in gun section17-Mar-2004 first beam in gun section  Injector: 15-Apr-2004 start injector commissioning15-Apr-2004 start injector commissioning 7-Jun-2004 end commissioning7-Jun-2004 end commissioning  Linac: 20-Aug-2004restart with complete machine20-Aug-2004restart with complete machine

TTF-II Injector Commissioning RF gun 4 MeV150 MeV bunch compressor ACC1 (M2*) ACC2(M1*) ACC3(M3*) Laser 3 rd harmonic cavity diagnostic section beam dump 12 MV/m20 MV/m  RF Gun: 21-Feb-2004 start conditioning21-Feb-2004 start conditioning 6-Mar Hz, 900 us, 3 MW6-Mar Hz, 900 us, 3 MW 16-Mar Hz, 450 us, 3 MW16-Mar Hz, 450 us, 3 MW 17-Mar-2004 first beam in gun section17-Mar-2004 first beam in gun section  Injector: 15-Apr-2004 start injector commissioning15-Apr-2004 start injector commissioning 7-Jun-2004 end commissioning7-Jun-2004 end commissioning  Linac: 20-Aug-2004restart with complete machine20-Aug-2004restart with complete machine ACC1 coupler conditioning 35MV/m EP cavity test

The 35MV/m Cryomodule Test 35MV/m 510 9 AC72: one of five high- performance EP cavities

The 35MV/m Cryomodule Test AC72: one of five high- performance EP cavities 35MV/m 510 9 Acceptance test in vertical cryostat naked cavity Low power CW

The 35MV/m Cryomodule Test 35MV/m 510 9 Acceptance test in vertical cryostat HP coupler Tuner (fast/slow) full power (system) test Full 1/8 th CM horizontal test (CHECHIA) Transferred to AC72: one of five high- performance EP cavities

The 35MV/m Cryomodule Test Acceptance test in vertical cryostat Full 1/8 th CM horizontal test (CHECHIA) Transferred to Full 8 string CM TTF Transferred to AC72: one of five high- performance EP cavities

The 35MV/m Cryomodule Test Acceptance test in vertical cryostat Full 1/8 th CM horizontal test (CHECHIA) Transferred to Full 8 string CM TTF Transferred to 35 MV/m EP TESLA Cavity accelerates beam for the first time 35 MV/m EP TESLA Cavity accelerates beam for the first time RF pulse with feedback in cavity 5 (AC72) during beam acceleration AC72: one of five high- performance EP cavities

The 35MV/m Cryomodule Test RF measurements showed no degradation of performance (35MV/m achieved) RF gradient measurement calibrated using beam (energy spectrometer) No measurable radiation detected (no dark current) No time for long-term system test due to TTF-II commissioning, but… RF pulse with feedback in cavity 5 (AC72) during beam acceleration 35 MV/m EP TESLA Cavity accelerates beam for the first time 35 MV/m EP TESLA Cavity accelerates beam for the first time

AC73 Full System Test in 1/8 th Cryomodule (CHECHIA)  1100 hr continuous operation at 35MV/m  No ‘faults’ observed due to couplersdue to couplers nor due to cavitiesnor due to cavities  Forced ‘trips’ caused no damage to cavity/coupler No performance degradation observedNo performance degradation observed

AC70: New EP Result! Measured Q 0 factor 2 over TESLA-800 specification May MV/m 510 9

TTF-II Injector Commissioning RF gun 4 MeV150 MeV bunch compressor ACC1 (M2*) ACC2(M1*) ACC3(M3*) Laser 3 rd harmonic cavity diagnostic section beam dump 12 MV/m20 MV/m  RF Gun: 21-Feb-2004 start conditioning21-Feb-2004 start conditioning 6-Mar Hz, 900 us, 3 MW6-Mar Hz, 900 us, 3 MW 16-Mar Hz, 450 us, 3 MW16-Mar Hz, 450 us, 3 MW 17-Mar-2004 first beam in gun section17-Mar-2004 first beam in gun section  Injector: 15-Apr-2004 start injector commissioning15-Apr-2004 start injector commissioning 7-Jun-2004 end commissioning7-Jun-2004 end commissioning  Linac: 20-Aug-2004restart with complete machine20-Aug-2004restart with complete machine Problem-free commissioning of full ACC1 module for TTF-II operation

ACC1 Module Commissioning  Cavities limits: C1 (Z54) 18 MV/m C2 (Z51) 16 MV/m Lower limit for ACC1 C3 (D42) 20 MV/m C4 (D37) 27 MV/m power limited  C5 (AC72) 36 MV/m no FE C6 (C47) 23 MV/m C7 (Z53) 20 MV/m large FE large Lorentz forces C8 (AC69) 18 MV/m large FE time (us) gradient phase Note: high-gradients not needed for ACC1 (beam dynamics)

TTF Beam Measurements beam energy (MeV) Beam energy vs ACC1 phase Energy spread vs ACC1 phase rms energy spread (MeV) ACC1 phase (deg)

Energy stability and Energy spread  Measured in the BC dispersive section after acceleration  LLRF with closed loop  energy stable within 0.1 %, rms =  uncorrelated energy spread estimated from rising edge 25 to 30 keV Energy

Injector Commissioning: Other Highlights  Successful commissioning of bunch compressor BC2  Emittance measurements downstream of BC2 using four wire array station  Cavity as BPM… All possible due to ACC1 stable operation (turn-key system)

Measurement of Beam Position in Cavity using Dipole Mode  The signal of a dipole mode in a cavity can be used as an indication of the beam position (à la NLC) example for vertical steering and dipole mode response in C1 mode ‘centre’

example for vertical steering and dipole mode response in C1 mode ‘centre’ Resolution: <50m 4 dipole modes which couple strongly to the beam All modes co-axial within measurement resolution (50m) Measurement of Beam Position in Cavity using Dipole Mode  The signal of a dipole mode in a cavity can be used as an indication of the beam position (à la NLC)

Klystrons: 3 Active Companies  THALUS First producer of prototype achieving specs.First producer of prototype achieving specs. 2 additional ‘production’ models2 additional ‘production’ models Tests of modified tubes in July.Tests of modified tubes in July.   CPI 1 st prototype development Achieved 10MW for short pulse (tens of s, =60%) Problems with longer pulse (understood and being addressed)   TOSHIBA First prototype being prepared for initial testing (July)

Klystrons: 3 Active Companies   THALUS First producer of prototype achieving specs. 2 additional ‘production’ models Tests of modified tubes in July.  CPI 1st prototype development1st prototype development Achieved 10MW for short pulse (tens of s, h=60%)Achieved 10MW for short pulse (tens of s, h=60%) Problems with longer pulse (understood and being addressed)Problems with longer pulse (understood and being addressed)   TOSHIBA First prototype being prepared for initial testing (July)

Klystrons: 3 Active Companies   THALUS First producer of prototype achieving specs. 2 additional ‘production’ models Tests of modified tubes in July.   CPI 1st prototype development Achieved 10MW for short pulse (tens of ms, h=60%) Problems with longer pulse (understood and being addressed)  TOSHIBA First prototype being prepared for initial testing (July)First prototype being prepared for initial testing (July) In addition: pulse cable testing starts this week at DESY

Immediate TTF-II Schedule We are here Beam in modules MV/m TEST

Saturation in wavelength range nmJuly 2005 User operation (extended period) Operation with full electron beam current (to be defined; 2.25 MHz?) Dec User operation (extended period) 3rd Harmonic RF system and ACC6 installedFeb GeV beam energyApril 2006 Saturation 6 nmJune 2006 User operation (extended period) Seeding Option installedDec Seeding demonstrationApril 2007 Longer Term

Saturation in wavelength range nmJuly 2005 User operation (extended period) Operation with full electron beam current (to be defined; 2.25 MHz?) Dec User operation (extended period) 3rd Harmonic RF system and ACC6 installedFeb GeV beam energyApril 2006 Saturation 6 nmJune 2006 User operation (extended period) Seeding Option installedDec Seeding demonstrationApril 2007 Longer Term

High-Gradient Program  30 new cavities from industry on order First delivery August 2004 (total ~110)First delivery August 2004 (total ~110)  Will be put through our established procedures Electro-polishing, HPR etc.Electro-polishing, HPR etc. No modifications to any aspect foreseenNo modifications to any aspect foreseen  8 >35MV/m cavities will be installed into Cryomodule #6 Tests will either be in TTF linac orTests will either be in TTF linac or New Module Test Stand (supported in part by new EUROFEL money)New Module Test Stand (supported in part by new EUROFEL money) Date: 2006Date: 2006

High-Gradient Program   30 new cavities from industry on order First delivery August 2004  Will be put through our established procedures Electro-polishing, HPR etc.Electro-polishing, HPR etc. No modifications to any aspect foreseenNo modifications to any aspect foreseen   8 >35MV/m cavities will be installed into Cryomodule #6 Tests will either be in TTF linac or New Module Test Stand (financed by new EU XFEL money) Date: 2006

Final Comments  TTF-II (on-going) commissioning on schedule Turn-key stable operationTurn-key stable operation  TTF-II (5 accelerating modules, 800 MeV) will be fully commissioned this year All the demands of a light source user facilityAll the demands of a light source user facility  ACC6 (35MV/m) scheduled for 2006  Successful transfer of 35MV/m to a standard TTF cryomodule has been demonstrated in ACC1 Acceleration with beamAcceleration with beam No radiation measured (no dark current)No radiation measured (no dark current)  Process to produce 35MV/m cavities now established and well understood Quality control required already exceeded by standard industry practiseQuality control required already exceeded by standard industry practise  Dark current under control  Pagani  XFEL activity rapidly ramping up  Brinkmann