Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Steering Committee Meeting Presented to Montgomery County Department.

Slides:



Advertisements
Similar presentations
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Advertisements

Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
Lec 10, Ch.4, pp : Parking studies (objectives)
The Center for Houstons Future? Energy Corridor District.
Missoula Planning Summit Milestone 14 August, 2008 Missoula, Montana.
Cellular Mass Transit (CMT) CMT4Austin.org. SOLUTION: Cellular Mass Transit Circulator Routes would converge on each Transit Center.
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
GREATER NEW YORK A GREENER Travel Demand Modeling for analysis of Congestion Mitigation policies October 24, 2007.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
Silver Line: Coming Soon Serving Reston to Largo via the District of Columbia Washington Metropolitan Area Transit Authority October 19, 2013 Presentation.
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
The SoCoMMS Model Paul Read Dan Jones. The Presentation Outline of the Study The Modelling Framework Accessibility Model.
1 Monica Bansal and Michael Eichler Department of Transportation Planning Presentation to the TPB Scenario Study Task Force November 19, 2008 Progress.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Steering Committee Meeting Presented to Montgomery County Department.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Metro Vision 2035 Regional Growth Scenarios. Scenario Workshop.
1 CAC – TCC Meetings October 15, Intermodal Transit Station Study Florida Department of Transportation (FDOT) Volusia Transportation Planning Organization.
1 Using Transit Market Analysis Tools to Evaluate Transit Service Improvements for a Regional Transportation Plan TRB Transportation Applications May 20,
I-35W and 46 th Street Station Concept Service Plan Planning for the Future – BRT 46 th St Station Concept Plan Public Input.
2040 Long Range Transportation Plan for River to Sea TPO September 26, 2014.
Davie Road/S.R. 84 Transit Facility Demand Estimation Presented by Jeff Weidner & Jeremy Mullings Florida Department of Transportation Yongqiang Wu & Kasey.
COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN Coalition for Smarter Growth Presentation on Staff Recommendations for Bus Rapid Transit Silver Spring.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
1 Regional Priority Bus Projects List Steve Yaffe, Arlington County December 17, 2008 TPB Regional Bus Subcommittee Presented to the Transportation Planning.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Sketch Model to Forecast Heavy-Rail Ridership Len Usvyat 1, Linda Meckel 1, Mary DiCarlantonio 2, Clayton Lane 1 – PB Americas, Inc. 2 – Jeffrey Parker.
Greater Mankato Transit Redesign Study Study Overview and Initial Existing Conditions September 2011 In association with: LSA Design and Public Solutions.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Montgomery County Maryland I-270 Integrated Corridor Management Project Tom Jacobs, University of Maryland Center for Advanced Transportation Technology.
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Service Planning and Integration Study Work Group Report 7/30/13.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
I-35W and 46 th Street Final Service Restructuring Plan.
Wake County Transit Plan Choose how you move! December 7, 2011 Capital Area Friends of Transit 1.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan I-95 Corridor Stakeholder and Service Provider Meeting #2 June 13, 2011.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study TPB Citizens Advisory Committee Public Forum in Oxon.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM.
Regional Priority Bus Transit Conference June 24, 2009.
Transportation leadership you can trust. presented to TRB 11 th Conference on Transportation Planning Applications presented by Dan Goldfarb, P.E. Cambridge.
Transportation leadership you can trust. presented to 12 th Annual TRB Transportation Planning Application Conference presented by Dan Goldfarb, P.E. Cambridge.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
Public Open House Thursday, March 19, 2009 TOD Plan & Park-and-Ride Location Study Village of Montgomery, Illinois Public Open House TOD Plan & Park-and-Ride.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
Chittenden County Park and Ride and Intercept Plan Public Meeting February 17, 2010.
ITS PCB T3 Webinar October 21, 2008 Montgomery County, Maryland Advanced Transportation Management System Automated Parking Information System Operational.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
Regional Transportation Data Clearinghouse Update MWCOG Technical Committee 5 November 2004 Bob Griffiths, Martha Kile, Charlene Howard Department of Transportation.
National Transportation || || Presentation at 15 th TRB Planning Application.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
County of Fairfax, Virginia Fairfax County Comprehensive Transit Plan and Transit Development Plan Board Transportation Committee December 1, 2015 Randy.
Premium Transit District 4, Office of Modal Development Making the Connection.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
TDM - Vancouver Experiences Strategic Transportation Planning, Sustainability Group TDM - Vancouver Experience October 21 st ACT TDM Summit 2008 Jo Yee.
Fairfax County Comprehensive Transit Plan and Transit Development Plan Update Fairfax County Comprehensive Transit Plan and Transit Development Plan Update.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study Ronald F. Kirby Director, COG Department of Transportation.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
Regional Transportation Plan Draft Hybrid Scenario Transportation Policy Committee 7/22/03.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Service Planning Work Group Meeting Presented to RTS Service.
Montgomery County Planning Commission
Transit for Tomorrow strategic plan
Technical Committee Item # 9
Staten Island Bus Study Public Workshop
Presentation transcript:

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Steering Committee Meeting Presented to Montgomery County Department of Transportation Presented by Dan Goldfarb, P.E. Transportation Planning Manager Tyson Corner Office Vanasse Hangen Brustlin, Inc. & FITP August 27, 2013

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor Action Consistent with Functional Master Plan Draft Objective Continuation of High Transit Mode Share to Silver Spring/Washington, DC Continuation of the Existing High Level of Service Provide Connection between Corridor Activity Centers o Silver Spring CBD o White Oak/FDA Key Nodes 2 Burtonsville PNR White Oak – Transit Center FDA Campus Four Corners Silver Spring Metro

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor Example RTS Service Long o Burtonsville PNR to Silver Spring Metro Intermediate o White Oak to Silver Spring Metro Short o Silver Spring Metro to Four Corners Interlining o Colesville to Silver Spring o White Oak to Langley Park (Via MD 650 or MD 193) 3

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Route Planning Process Focus Corridor Level Identifying Connectivity Activity Centers o Office/Retail/Households o Office/Retail o Central Business District (CBD) Multimodal Transfer Points o RTS   RTS o RTS   Metro o RTS   Bus

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Example Corridor - US 29 Population Density Employment Density Park-and-Ride Lots Infrastructure Other Modes Multimodal Connections Highway Facility 5

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor Characteristics - Households Modest household growth in the corridor, except for downtown Silver Spring 6

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor Characteristics - Jobs High job growth for Activity Centers in White Oak and downtown Silver Spring 7

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor Characteristics – Households to Jobs The balance of households to jobs will increase, and there will be continued travel into the corridor. 8

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Transit Mode Share Transit Planning Focus on Commuter Trips (HBW) Longer Trips Higher Transit Mode Share JurisdictionTransit Mode Share Commuting Transit Mode Share Non-Commuting Montgomery County16%3% DC Core56%38% 9

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor Service Supplied WMATA “Z” Services Express Local MTA Commuter Bus Ride-On Only Bus 10

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor Service Supplied - Buses in the Peak Hour SegmentExistingYear 2040 North of ICC2838 North of MD 650 (South of ICC)5357 South of MD 650 (North of Four Corners) 5763 Inside Beltway

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor – Mode Share 12

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor – Mode Share Summary Corridor to Silver Spring CBD High Transit Destination Existing 40% Commuter Trips Transit Future 48% Commuter Trips Transit Corridor Trips to DC Existing 48% Commuter Trips Transit Future 50% Commuter Trips Transit White Oak Existing Commuter Trips Transit Mode Share to White Oak 7% Future Commuter Trips to Transit Mode Share to White Oak 8% From Silver Spring CBD & DC Commuter Mode Share 25% 13

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor – Transit & Auto AM Peak Period SegmentExisting Transit Existing Vehicles Future Transit Persons Future Vehicles North of ICC5,90010,4007,20010,400 North of MD 650 (South of ICC) 7,3008,6008,1009,300 South of MD 650 (North of Four Corners) 10,8008,00011,0009,100 Inside Beltway12,2007,00012,4007, Auto Occupancy for Commuting Trips in Montgomery County is 1.06 persons/vehicle (2007/2008 MWCOG Household Travel Survey)

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor Service Integration Sustain High Level of Transit Usage Improve Reliability Integrating MD 650 Service North of White Oak Transit Center White Oak Shopping Center Connections Life Science Center and FDA Campus Connections Between White Oak and Silver Spring 15

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study US 29 Corridor White Oak Connections US 29 Connection to MD 650 Randolph Road Service via FDA Campus, MD 650, Randolph Road High Level of Service Silver Spring to White Oak/FDA Campus MTA Commuter Bus Continued Services to Silver Spring/Washington, D.C. Transfers at White Oak Connections to FDA Campus 16

Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Questions/Comments/Discussion 17