Mt. Lebanon Public Works Facility Master Planning November 12, 2013 Update.

Slides:



Advertisements
Similar presentations
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Advertisements

Mary Faucette. Burlington Recreation & Parks 5P Community Action Model I n t e g r a t i o n Preparation promotion Policy/Systemic Change Policy/Systemic.
City Council Presentation July 1, 2014 Parks & Recreation Master Plan.
Bistritsa Terrace PREPARED BY LISA FREIJ. Location Bistritsa Terrace Minutes drive to: 1.Ring road, 5’ 2.Business Park, 8’ 3.American College, 8’ 4.AAS,
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
2008 Bond Program Implementation | Rock Creek Campus opsis architecture LLP Portland Community College | Rock Creek Campus opsis architecture Portland.
PE EQUIPMENT AND FACILITIES.  Utilize equipment that is appropriate for the developmental level and skill level and that will provide a safe, non- threatening.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
1 The weight is over How Downtowns are Joining the Fight Against Obesity.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
Associated Architects WINDSOR HIGH SCHOOL New Sixth Form Centre Sixth Form Centre: Presentation to Governors Windsor High School Sixth Form College.
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA Academic Senate 19 JANUARY 2011.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
Energy Conservation & Deferred Maintenance MSU’s Energy Conservation Module May 1, 2012.
North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Field Visit MODULE 8: Walkthrough of a Healthcare Waste Treatment Facility.
BACA, ABRAHAM (PM) DIAZ, DONNA DO, VICKY CHOI, INAE RUIZ, FRANKLIN.
Mt. Lebanon Public Works Facility Master Planning March 11, 2014 Update.
Metro North County Transit Center Presentation to City of Ferguson – October 22, 2013.
FORT CALHOUN HIGH SCHOOL ADDITION/RENOVATION PROJECT PICTURES ALONG WITH DESCRIPTIONS.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
Dining Services Review Process and Master Plan Finance & Administration Advisory Committee November 28, 2012.
Public Information Meeting
Jake Garziano Period 3 Jake Garziano Period 3. » #outlookhttp:// #outlook »
From the Beginning Design Standards and Other Post-Construction Program Elements.
Local Area Augmentation System (LAAS) LOGISTICS Alaskan Region Briefing 1 October 2002 Jim Hanrahan, FAA ARN-100.
Environmental Health Community Survey Results. EH Survey Statistics Total surveys = 23 ◦ Collected at Tribal Earth Day 2008.
MCM#6 Pollution Prevention/Good Housekeeping Part 1 Municipal Facility Management.
IMPACT OF ADDITIONAL RESIDENTIAL DENSITY ON Redevelopment of North Toronto Collegiate Institute February 19, 2004 Architects Crang and Boake Inc. Teeple.
FACILITIES MASTER PLAN FMP Review October TIME LINE 2014November 2015 February March April May October / November December Education / Facility.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
Priority Development Areas Ursula Luna-Reynosa, Economic Development Director David Kleinschmidt, Public Works Director November 3, 2011.
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
EMERGENCY FACILITIES AND EQUIPMENT. Facility: Any equipment, structure, system, process, or activity that fulfills a specific purpose Site: The area over.
Bridge to Equality: Informal Settlement Redesign Model Brenda Lugano Final Capstone Presentation
Palomar College HUMANITIES BUILDING “Creating places and spaces that enrich the lives of those who use them” “... Supporting innovation to enhance and.
Team 6 The Calvin Drain Trust Mike DeWeerd, Matt Schanck, Aaron Venema, Kat Wever 1/10.
Faculty Senate 2010 Incoming Freshmen John F. Carney III September 16, 2010.
Community Development Department Town Center Multi-Family Master Site Plan Application #2227 Town Center Multi-Family Master Site Plan Application #2227.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
Finlace Consulting Pvt Ltd C-56, A/13, Sector-62 Noida Visit us at- Contact us at
Second Grade Word List Second Grade Sight Words. 224.
Lower Merion Township Parks & Recreation Plan Implementation Plan.
Department of Transportation FY 2013 Transportation Budget is $29.8 million  ($495,000) or 1.6 percent lower than FY 2012 Revised Budget FY 2013 Sources:
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
Town of Oakville Update
More info at WindhamMaine.us/597/Maintenance-Facility
Bond Project Update September 2017
Strategic and Integrated Stormwater Management Through Open Space Master Planning Celso Guitian, UMBC Matt Thomasson, RK&K Engineering Amelle Schultz,
Presentation Preview Introductions Purpose for Zoning Code Rewrite
2006 Facilities Master Plan Update Cañada College
ELYRIA MULTI-SPORT ATHLETIC COMPLEX
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
21st Century School Buildings Plan
PROJECT PLANNING MEETING
TECHjOSH.COM TechJosh.com.
Iron Forge Educational Center: U. S
Extra-Curricular Program Design Athletics/Music/Recreation
Butte County Board of Supervisors September 27, 2016
West Campus Parking Deck & Roadway Update
Official Plan and Zoning By-law Amendment Application
Carleton College Facilities Management
New Secondary School Construction Update
WELCOME WELCOME.
With funding from the Appalachian Regional Commission
PE Equipment and facilities
Bensalem Township School District Feasibility Study
Presentation transcript:

Mt. Lebanon Public Works Facility Master Planning November 12, 2013 Update

Master Planning Study  Kick-Off Meeting  Site Visit - Photographing and Field Measuring of Existing Buildings  Interview Meetings with Public Works Department Personnel – Initial Programming  Site Visit – Review of existing site conditions, stormwater controls, grading, sight lines, public pedestrian, traffic circulation and access points.  Meeting with Public Works Personnel – Programming and Initial Site Organization

Existing Site

Existing Buildings - Floor Plans

Program Spaces

Cranberry Township Public Works Garage Outdoor Program Spaces

North Huntingdon Township Public Works Garage Program Spaces - Areas

Outdoor Spaces - Areas

Vehicle & Equipment Garage Options

Master Planning – Site Study  Create an innovative plan for the site in terms of handling the quantity, quality, and velocity of stormwater runoff that is created from future development on the public works site.  Provide functional, secure indoor and outdoor storage and maintenance facility for Public Works  Provide a separate, secure outdoor storage area for Contractors  Create public recreational and pedestrian connections to surrounding parks and residential areas.

North Huntingdon Township Public Works Garage Site Plan – Concept #1

Site Plan – Concept #2

Site Profiles