Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.

Slides:



Advertisements
Similar presentations
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Advertisements

Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Collimation System for Beam Loss Localization with Slip Stacking Injection in the Fermilab Main Injector Bruce C. Brown Main Injector Department Accelerator.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Accelerator Physics Issues Shekhar Mishra Sept 17-19, 1996 Main Injector DOE Review.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Electron cooling at the Recycler: Update and Cooling force characterization October 19 th, 2006 L. Prost, Recycler Dpt. personnel Fermi National Accelerator.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Beam-based vacuum observations and their consequences Sergei Nagaitsev August 18, 2003.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
F 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Fermilab Run 2 Accelerator Status and Upgrades
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
Antiproton Acceptance Keith Gollwitzer Dept. of Energy Review March 30, 2005.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
AP2 & Debuncher Acceptance Keith Gollwitzer Dept. of Energy Review February 25, 2004.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Hybrid Fast-Ramping Synchrotron to 750 GeV/c J. Scott Berg Brookhaven National Laboratory MAP Collaboration Meeting March 5, 2012.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
Recycler Pbar Transfer -Gattuso 1 Recycler weekly Summary This presentation will probably involve audience discussion, which will create action items.
Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
LHC (SSC) Byung Yunn CASA.
Energy Calibration of the SPS with Proton and Lead Ion Beams
Presentation transcript:

Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status Jan 03 Shutdown work Summer 03 Shutdown work Study and Integration plans Summary

Introduction to the Recycler Ring The Recycler Ring is designed to store and cool antiprotons at 8.9 GeV/c. In the final configuration it may also Recycle antiprotons from the Tevatron at the end of store. The Accumulator stacking rate decreases as the stack size in the Accumulator increases. An initial stacking rate of about 13e10/hr has been achieved in the accumulator. Transfer of antiprotons from Accumulator to Recycler will be done at small stack sizes, 30-60e10 to keep the stacking rate in the Accumulator high.

Recycler Study and (Upgrade) Goals Goals Number of stored antiprotons2e12 (5e12) Transfer efficiency(Acc  RR)>95% Stacking efficiency(Acc  Lifetime (2e12) (hrs)100( ) Equilibrium Normalized Emittance<10 pi mm-mr Emittance Growth rate~2 pi mm-mr/hr Antiproton RecyclingEfficiency>50%* Longitudinal Emittance<54 eV-Sec * This will depend on the emittance of beam at the end of store.

Recycler Upgrades (Since initial installation till Jan 03) Recycler End shim replacement Removal of magnetic heater tapes Alignment of beam pipes and BPMs Removal of high beta insert Realignment of All Recycler magnets with new fudicial. Install electromagnetic dipole correctors at each half cells, additional quadrupole and sextupoles. Install new magnetic shielding. Install new heater tapes inside each CFM and on beam pipes. Install new calibration circuit for all BPMs and calibrate every preamps. Install two scrapers and a new longitudinal Schottky detectors Install remote movable Stochastic cooling tanks Perform test on two vacuum sector by doubling Ion Pump.

Recycler Studies During last several months the Recycler studies have addressed on the following topics Injection Efficiency of protons and antiprotons Emittance growth at injection Aperture Recycler Central Momentum Adjustment Recycler Lattice Beam Lifetime Antiproton transfer to the Recycler and stacking Commissioning of the cooling system Rf manipulation of beam Studies related with planed upgrades

Recycler efficiency Loss at extractions points are due to injection error in the downstream machine and blowup of beam due to windows in transfer lines.

MI Reverse Tune-up using 53 MHz Before tuning. After tuning. We have now installed a 2.5 MHz Beam Line Tuners in RR and MI to reduce injection oscillation. (Nov 02)

Horizontal Aperture After powering all the dipole corrector power supplies a new aperture scan was done. Installation of feed down sextupoles was done. We measured the horizontal aperture to be about 50 pi mm-mr. Vertical aperture is about 40 pi mm-mr.

Aperture after momentum adjustment 18.4 mm BLM starts seeing loss Longitudinal Schottky SA zero span video output sees extinction point (beam center) Aperture ~60 pi mm-mr (H) ~40 pi mm-mr (V) on central orbit

MI Magnetic Field effect on RR orbit A R&D on shielding revealed that we needed new mu-metal and wrapping technique. Old shielding was not very effective. But the motion in dp/p and tune is causing longitudinal and small transverse emittance growth.This will require an active correction. We plan to add more shielding during next shutdown. We are also looking at feed-forward and feedback techniques.

Active MI Ramp Correction Jan 03 Green trace with compensation on, rest off Compensation on start at Green and stay on This work is very preliminary, room for improvement. No tune compensation yet.

RR Lattice functions Recycler Dispersion Horizontal Beta

Antiproton transfer to Recycler >95% circulating efficiency for 1 st injection. >75% stacking efficiency.

Recycler Proton Lifetime Unscraped proton beam lifetime 13 hours with Main Injector ramping. The aperture does not fill for 2 to 3 hours with Main Injector ramp. This is considerable improvement as compared to less than a minute aperture filling after We installed all the sextupole feed down correction (Aug 02) Complete scan in both H and V planes and centering the beam in aperture.

Pbar Heating and Cooling Rates MeasurementMethodBeam Xe11Result pi mm-mr/hr Horizontal Cooling Scraping Vertical Cooling Scraping Transverse Cooling IPM7.515 Horizontal Heating Scraping No MI Ramping Vertical Heating Scraping Latest number with MI ramping: Heating rate 8 pi mm-mr/hr and cooling rate is 22 pi mm-mr/hr. 3.2e11 pbar in stack.

Emittance of the Cooled antiprotons Measured emittance is about 7 pi mm-mr. We have measured emittance of about 6.5 pi mm-mr in both planes for about 6e11 pbar in the stack. This measurement will be repeated with more calibrated instrumentation and higher stack size.

Cooled antiprotons Transverse Emittance is about 7 pi mm-mr at a stack of 75e10 pbar. IPM needs study. It measurement is larger by x2 in H plane than size measured by scraping the beam.

pbar from Recycler to MI and Acceleration

Pbar from Recycler to TeV ~25-40% of the extracted pbar from RR circulated in the TeV.

Pbar lifetime 7 hours of store, 105 hours of lifetime for 0.75e12 antiproton. 36 hours store, 0.35e12 pbar, 180 hrs lifetime, 60 hrs improvement over past measurement at same intensity

Lifetime Improvements The lifetime has improved due to cooling upgrade, tune up aperture improvements and MI ramp compensation.

Effect of vacuum on pbar lifetime Lifetime improved from 90 hours to 125 hours after improving the MI30 sector vacuum by firing TSP. Proposed vacuum upgrade will improve this considerably.

Physics Issues Injection and circulating Efficiency for proton and pbar is about 90% Emittance growth is about a factor of 2-4 larger than the design. Significant fraction of this appears to be vacuum related. Recycler performance is adversely affected by the Main Injector ramp. Circulating and injection lattice and aperture Operating point of the Recycler is sensitive to the Recycler orbit. Cooling needs further study and optimization. RF manipulations need further study and optimization.

Recycler Status Integration Goal Achieved Number of stored antiprotons2e120.9e12 Transfer efficiency(Acc  RR)>90%83% Stacking efficiency>85%75% Lifetime (2e12) (hrs)100105*,180* (.7e12,.4e12) Equilibrium Normalized Emittance<10~7* (0.5e12) pi mm-mr Emittance Growth<2~ 5 pi mm-mr/hr Longitudinal Emittance (eV-Sec)<5475 * The Stochastic cooling system upgrade (equalizers), aperture improvements etc. This performance is expected to improve.

Jan 03 Shutdown work Removed vacuum window from the R22 and R32 beam line installed differential pumping station. Rework the R30 straight section adding additional ion pumps and TSP's. We also added a Ecool segment in the Recycler ring for test purposes. Added Horz and vert schottky detectors into the Recycler at the 620 and 621 regions. Added Horz and Vert flying wires to the Recycler Ring at the R62 region. Removed some 400 ft old heater tape from magnets in the Ring/Transfer lines. Completed installation of Poly inserts ring wide to bake at higher temp. Upgraded nearly 40%+MI30 of the Ring with new ion pump assembly. Remove out of plane BPMs preamp in the for future upgrade. Removed and reinstalled some 8,000 feet of shielding. Fired TSP ring wide.

No vacuum Window in transfer Lines There were 0.003” Ti window in both transfer line. This was the cause of ~35% emittance growth/window.

R30 straight section adding additional ion pumps and TSPs This upgrade makes RR30 vacuum sector uniform with more TSPs, ion pumps and gauges. 6 RGA added to whole ring.

Horz and Vert schottky detectors into the Recycler

Horz and Vert flying wires to the Recycler Now with Schottky Detectors, Flying wires and IPM we can make reliable measurements of beam emittances.

Technical Issues Instrumentation Upgrades Beam Position Monitor (R&D in progress) Beam Line Tuner (Commissioned during Nov 02) Flying Wire (Installed during Jan 03 shutdown) Ion Profile Monitor (Physics Understanding needed) Schottky Detectors (Installed during Jan 03 shutdown) Injection Damper Reliable, calibrated and operational Instrumentation RF power and manipulations for injection, stacking and extraction

Technical Issues… Pbar transfer between machines The momentum and frequency was different between the Accumulator and Recycler. We have adjusted the Recycler momentum by using newly installed electromagnetic correctors in the Recycler. This has resulted in a large change in Tune of the Recycler. Which we are compensating by phase trombone. It was not designed to make this size correction. Frequency error is being taken care by the Main Injector. We may have to make further modifications to the Recycler to handle this issues in a better way.

Mechanical Upgrades of the Recycler Vacuum upgrades (Expect to get x2 improvement in lifetime) Double ion pump in the Recycler Install insulator inside the CFM for higher temperature bake. Bake at a higher (>110 deg C) temperature for 4 days. Install more gauges and RGA Find and eliminate small leaks Lattice Upgrade of the Recycler Remove stuck old magnetic heater tapes from 24 magnets Additional quadrupole correctors Additional Magnetic shielding at select locations

Recycler Integration We have started working on the integration of the Recycler into the Accelerator complex. Stack efficiently, reasonable lifetime and emittances. Re-bunch cooled beam in 2.5 MHz, transfer to MI and accelerate in MI to 150 GeV with >90% efficiency, using 53 Mhz. Develop 2.5 MHz acceleration in MI through transition to eliminate coalescing of beam at 150 GeV. At start this has to break even with Accumulator stacking and show potential of improvement If the stacking rate in the Accumulator improves to 15e10 pbar/hour. Similar or better emittance of the beam to Tevatron.

1.5e11 pbar/hour Transfer every 3 hours Recycler shot setup 30 mins. 2e12 in hours, depending on stacking efficiency at large stack size. Simulated Recycler Stacking This calculation assumes slightly improved Recycler performance in stacking efficiency of 85% and present intensity dependent lifetime. It is compared with a calculation where lifetime of 100 hours and 300 hours at 2e12 with small intensity dependence.

Summary Over the last year we have made significant progress in the Recycler performance. Recycler circulating antiproton beam efficiency >95% and stacking efficiency of about 75% has been achieved. Antiproton lifetime >100 hours for >75e10 pbar. We still have several issues related to RF manipulations at stacking and extraction. We have proposed several upgrade to improve the performance of the Recycler. Recycler is close to being a machine which can be integrated into the complex. The proposed Recycler upgrade will make the Recycler fully operational.