THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.

Slides:



Advertisements
Similar presentations
Line Efficiency     Percentage Month Today’s Date
Advertisements

Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
( ELR) - 1 STEREO - Solar Terrestrial Relations Observatory Mission STEREO SWG STEREO OBSERVATORY Status Edward Reynolds APL STEREO Project Manager.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 Ground Based Observatories (GBO) Program Schedule and Status Stewart Harris.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Alaska Ground Based Observatories (with E/PO involvement) GBO Peer Review April 27, 2004.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
Constellation Space Transportation Planning Office July 30, 2009.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Based Observatories (GBO) MCDR Stewart Harris.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS MISSION PDRMISSION DESIGN- 1 UCB, November 12-14, 2003 Mission Design Dr. Sabine Frey University of California - Berkeley.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: Time History of Events.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – August 2012.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Program Management Agenda
Small Business Superannuation Clearing House - Transition to ATO
ESS Program Plan and Schedule Update
Jan 2016 Solar Lunar Data.
THEMIS THEMIS MCDR June 14-18, 2004 University of California, Berkeley
SPF MAG Quarterly Report – Feb 2015
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS Mission Confirmation Readiness
Current SOC-Ground System Integration Schedule (Jan )
Peer Review Agenda (Suggested).
Average Monthly Temperature and Rainfall

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Instrument PDR Summary of Objectives
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Electricity Cost and Use – FY 2016 and FY 2017

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Globus-M2 will be constructed by the end of 2015
Pilot of revised survey
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Presentation transcript:

THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis Angelopoulos University of California - Berkeley

THEMIS peer Instrument CDR 2 CETP, Paris, April 8, 2004 Past to ~present Phase B selection: Mar 22, 2003 Science/Systems Requirements Review – Jun/Jul 2003 PDR – peer: Oct 8/9/15/16, 2003, Mission: Nov 13-14, 2003 Confirmation Readiness Review – GSFC, Feb 4, 2004 Confirmation Review – First attempt: HQ, Mar 4, 2004 (Aborted) –GSFC felt necessary to further reduce schedule risk –Developed better I&T flow, increased work, validated by GSFC Engineering –Developed 2 month slack in I&T flow, pushing launch to Oct 21 –Added P1 magnetics verification and calibration test –Added P1 EMC/EMI verification and calibration test –Added pressurant tank: increased mission deltaV to help: »mass posture (refocus bus on instrument hosting); »bus development schedule; »a compressed ascend and commissioning scenario –Lost dawn sector conjunctions; kept ascend schedule contingency –Instrument work kept-on full steam (ETU production & testing) –Test plans being detailed; test GSE/software being built –Test facilities being refurbished, procured or built –ETU vibration tests start April 21; electrical tests ongoing; TV: May

THEMIS peer Instrument CDR 3 CETP, Paris, April 8, 2004 ~Present to near future Peer FGM/SCM CDR – Berlin, Paris, Apr 6/8, 2004 Peer EFI/SST/ESA CDR – UCB, Apr 19/20, 2004 Peer GBO CDR – Calgary, Apr 26/27, 2004 Confirmation Review – HQ, Apr 22, 2004 –Baring further GSFC thunderbolts or risky reviews –Authority to spend >25% of cost –Can commit launch vehicle and launch date Mission CDR: UCB Jun 15/16, 2003 –Design supported by ETU results satisfies requirements –Interfaces tested and per ICD –Flight test plans detailed and to environments expected –Probe I&T plans detailed;can test compliance with instr. Req’s ETU Instrument Deliveries: April 2 nd – Jun 3 rd, 2004 ETU Instrument I&T – starts May 28 th, 2004 F1 deliveries Aug 10 th – Sep 27 th, 2004 F1 I&T at UCB mid-Aug to mid-Nov, 2004 F1 EMI/MAG testing at UCB: Oct 22/26, 2004

THEMIS peer Instrument CDR 4 CETP, Paris, April 8, 2004 Outlook We are relatively on-track despite 2-3 month delays in reviews We turn adversity into opportunity and –enhance technical margins –improve development program quality –increase science capacity A tribute to: –Explorer program support –Funds keep flowing – ensuring no delays –Engineering talent present and eager –Management support in scheduling and tracking –Tenacity, commitment and experience of team –Engineering excellence and success oriented attitude Expect on time delivery of Integrated Suite at end of year: –EMI/MAG testing complete on instrument suite –Bugs worked out with principal attributes of IDPU-BAU interaction