Product Tracking Database Sponsored by Aviation learning, Inc. The goal is to create an n-tier, client-server system that will track the product and order.

Slides:



Advertisements
Similar presentations
ISeries Skip Upgrade External Sales Presentation September,2005.
Advertisements

Security Update Server Registration, Active scanning and Windows patching.
best practice project management methodology ©Platinum Services Group Limited What is XPRODi ?
DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
Ultimate Bundle Overview Products Benefits Technical Requirements Licensing Pricing Valid until 01-Sep-2010.
Secure Sockets Layer eXtended (SSLX) Next Generation Internet Security Overview Presentation April 2011.
SmartSystems™ Foundation Product Overview
Chapter 9 Chapter 9: Managing Groups, Folders, Files, and Object Security.
Copyright © 2009 Rolta International, Inc., All Rights Reserved a c c e l R12™ Upgrade Approach.
Report Distribution Report Distribution in PeopleTools 8.4 Doug Ostler & Eric Knapp 7264.
Software Configuration Management (SCM)
Lesson 18: Configuring Application Restriction Policies
Hussain Ali Department of Computer Engineering KFUPM, Dhahran, Saudi Arabia Microsoft Networking.
Patch Management Module 13. Module You Are Here VMware vSphere 4.1: Install, Configure, Manage – Revision A Operations vSphere Environment Introduction.
Closing of cApex10 & Fopro10 NOTE: Trial balance should be tallied before closing.  Step1: Check free Disk space on Drive where Oracle is Installed.
Order Management System Gregory Barrett Ken Browning Hiroshige Matsuno.
Purpose Intended Audience and Presenter Contents Proposed Presentation Length Intended audience is all distributor partners and VARs Content may be customized.
IT 499 Bachelor Capstone Week 9.
Time Matters ® A Practice Management, Client Relationship Management, and Document Management System Presented by Alana Seibert.
Senior Design 2010 Group 10.  Students  Nathan Dane  Jamin Hitchcock  Eric Tweedt  Advisor  Tien Nguyen  Client  Mary Greeley Medical Center 
Chapter 5 IS630. Project Plan 1.Introduction 2.Project Definition Overview 3.Changes Since Project Definition Was Approved 4.Staffing Plan 5.Development.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
SYS364 Evaluating Alternatives. Objectives of the Systems Analysis Phase determine, analyze, organize and document the requirements of a new information.
© 2010 VMware Inc. All rights reserved Patch Management Module 13.
Oracle Application Express 3.0 Joel R. Kallman Software Development Manager.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Web Based Inventory Site Building Room Asset Number Category Type Description Serial Number Manufacturer Model Vendor Name Acquired Date P O Number Budget.
The McGraw-Hill Companies, Inc Information Technology & Management Thompson Cats-Baril Chapter 3 Content Management.
Michael Dermody September 2010  Capability Maturity Model Integration ◦ Is a Trademark owned by the Software Engineering Institute (SEI) of Carnegie.
Plant Engineering Workbench 5.3 New Features. 2 Workbench 5.3 ▼ New Features in 5.3 are: –New 3D Model Management module –Additions to the Admin module.
Module 13: Maintaining Software by Using Windows Server Update Services.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
©2004 Deloitte Drop Shipment and Back to Back Order Processes in Oracle 11i July 19, 2004.

TEAM Basic TotalElectrostatic ManagementAwareness&
CS480 Computer Science Seminar Introduction to Microsoft Solutions Framework (MSF)
1 SQL Server 2000 Administration Kashef Mughal MSB.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Computer Emergency Notification System (CENS)
Database Design and Management CPTG /23/2015Chapter 12 of 38 Functions of a Database Store data Store data School: student records, class schedules,
Document Your Access Database With Visual Basic Presented by Joseph J. Sarna Jr. JJS Systems, LLC.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Systems Management Server 2.0: Backup and Recovery Overview SMS Recovery Web Site location: Updated.
BEST GROUP CONSULTANTS Lesson Department Information System.
MS Access: Database Concepts Instructor: Vicki Weidler Assistant: Joaquin Obieta.
CRM in Education: Raising Standards. Saving Time. Presented by: Daniel Petersen Director of Business Solutions Applied Tech.
Module 8: Managing Software Distribution. Collections Packages Programs Advertisements Collections Packages Programs Advertisements How Software.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Initiation Project Management Minder Chen, Ph.D. CSU Channel Islands
Project Management Project planning individual assignment: Project CLOCK
Company LOGO Overview: Project Server 2003 and Enterprise Project Management (EPM) Implementation for Marshall University January 31, 2005 Presented by:
1. During the standard installation of NetBackup 6.5 you will need to select a Custom install. 2. A valid License Key to install the Windows Media server.
1 Weekly Slippage Report Current (Start / Finish) vs. Last Week Comparison Microsoft Project Users Group  Introduction  Current (Start / Finish) vs.
…the basics…. Wildland Fire Information and Technology Server Requirements ● Windows 7 Professional or Windows 2003/2008 Server ● Windows 8/10 (discussion)
Steps for Symantec PGP Standalone install with Please use the following steps and screenshots to step your way through a standalone install of PGP.
Lecture 21 Introduction to System Development Life Cycle - Part 1.
Workflow in Microsoft Office SharePoint Server Jessica Gruber Consultant Microsoft Corporation.
Waste Management Inspection Tracking System (WMITS)
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Log Shipping, Mirroring, Replication and Clustering Which should I use? That depends on a few questions we must ask the user. We will go over these questions.
Troubleshooting Laserfiche Systems
Chapter 17 Windows NT/2000 Domains Cisco Learning Institute Network+ Fundamentals and Certification Copyright ©2005 by Pearson Education, Inc. Upper Saddle.
Backup and Restore on the ALSMS Server Configuration Example Alcatel-Lucent Security Products Configuration Example Series.
What are they? The Package Repository Client is a set of Tcl scripts that are capable of locating, downloading, and installing packages for both Tcl and.
ShareTheTraining TRR ARB Presentation Team 11
Introduction This seminar is intended to give people an overall view of the capabilities of the Scientific Programme Management System (SPMS), to explain.
SAP R/3 Installation on WIN NT-ORACLE
Dynamics GP 2018 – Payroll and Human Resources
Presentation transcript:

Product Tracking Database Sponsored by Aviation learning, Inc. The goal is to create an n-tier, client-server system that will track the product and order information necessary for product support. Information is to be entered in a manner that follows the processes used to fulfill a product order.

Deliverables Database –A normalized JET (i.e. Microsoft Access) database with reporting capabilities - included in the server package. –Documentation of tables, fields, keys, constraints, indexes, and relationships.

Deliverables Server Application Package –A setup program to install and configure the server package on a Windows NT machine. –An optional step of the setup procedure will schedule database backups.

Deliverables Client Application Package –A setup program to install and configure the client. –Functionality that follows the order fulfillment process. Specifically: Entering a new order (including products, vouchers and companion kits) Entering information about an order’s shipment

Deliverables –Client Functionality, continued… Registration of ordered products Creation of certification vouchers Redemption of certification vouchers (certificate request) Certificate Shipping Tech Support –A security feature to disable specific functions for each client.

Deliverables –User manual including installation procedures and glossary.

Assumptions A third-party program provided by Aviation Learning, Inc. will generate license keys. All database administrative functions will be done with Microsoft Access. During the development process, weekly status reports will be provided to the sponsor.

Assumptions During the development process, an interim build will be provided to the sponsor every two weeks, when appropriate. An in-house Windows NT server will be available to install the server application package during the client testing phase.

Projected Time Line High-level design documents and technical specifications will be delivered for approval by April 11. The system will be delivered for testing by May 6. Testing will be completed by May 13.

Projected Time Line Any functions that do not behave in the agreed upon manner will be fixed during the week of May 13.

Bid There is no monetary cost for the system. RIT and/or the Information Technology Department will own all rights to the system.

Bid Aviation Learning will be provided with the following things: –All source code –All documentation –License to use and modify the system in any way for any in-house purposes (i.e. the system may not be resold in any form)