Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Characteristics of a Good Calculation Program Presented.

Slides:



Advertisements
Similar presentations
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
Advertisements

Transition from Q1- 8th to Q1- 9th edition
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Appraisal, Acquisition & Relocation System (AARS) REAL ESTATE SECTION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT.
ISO 9001 : 2000.
Create New feature Approved Change request Create User Stories for the feature Add User stories to Target Process backlog User Stories – 1.Create Story.
(Project) SIGN OFF PROCESS June 21, 2010
CZECH STATISTICAL OFFICE | Na padesatem 81, Prague 10 | Jitka Prokop, Czech Statistical Office SMS-QUALITY The project and application.
Software Configuration Management
Pertemuan 16 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
SE 555 Software Requirements & Specification Requirements Management.
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
Software Configuration Management (SCM)
Enrollment Manager Presented By: Shaun McAnulty. ENROLLMENT MANAGER  Came about as an Enhancement request, users wanted a single location to track and.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 18 Maintaining.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Accelerated EMS Session 4 – 28 January 2008.
Systems Analysis – Analyzing Requirements.  Analyzing requirement stage identifies user information needs and new systems requirements  IS dev team.
Electronic Research Administration (eRA) OER, OD, National Institutes of Health.
Workshop: Measurement Points and Permits
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
Software Configuration Management (SCM)
Independent User Acceptance Test Process (IUAT)
Save a Tree: Use an eForm Automating IT Change Request Management Processes (Concurrency IT Department)
Information Technology Project Management Buying Packaged Software: RFPs and Vendor Selection.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
2006 CMBG Conference Sam Melton Supervisor, Configuration Management Brunswick Nuclear Plant Progress Energy June 11-14, 2006 Richmond, VA CM04 Facility.
Issue Management Group on Sustainable Management, Geneva, February 2010 The UN GHG Inventory Shoa Ehsani SUN Geneva, Palais de Nation, February 2010.
Capital Asset Management May 14, 2008 Today’s Presenters: Anna Jensen, Director of Auxiliary Accounting, Capital Asset Management, Accounts Receivable,
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
1 Quality Attributes of Requirements Documents Lecture # 25.
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
DHHS COE Meeting Agenda May 19, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
2006 CMBG Conference BREAKOUT 6: Master Equipment List & Data Base Management Facilitator: Tom Czerniewski Entergy June 11-14, 2006 Richmond, VA.
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
Project Planning Goal 1 - Estimates are documented for use in tracking and planning project. Goal 2 - Project Activities and commitments planned and documented.
Software Engineering Lecture 9: Configuration Management.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
ICS Area Managers Training 2010 ITIL V3 Overview April 1, 2010.
2006 CMBG Conference Mike Stout Spescom Software, Inc. Configuration Management For The Next Generation.
The Art of Developing Policies A Look At Requirements, Trends & Challenges.
1 From Regulatory Intelligence to Compliance Debbie Henderson Head, Global Regulatory Policy EU Ring May 13, 2014.
Information Technology Project Management, Seventh Edition.
Standard Design Process Overview
Industry Standard CM Indicators Mike Hayes Exelon Nuclear CM SME CMBG Steering Committee.
Introduction to CMIS, an Electronic Design Change Process Presented by: Mark Gillis (FirstEnergy) and Brad Diggans (Rolls-Royce)
Software Configuration Management
Software Project Configuration Management
Chapter 18 Maintaining Information Systems
Module 8 Introduction to Validation
Leaning Out the Nursing Policy and Procedure Process
Systems analysis and design, 6th edition Dennis, wixom, and roth
Document Update Benchmark results
Systems analysis and design, 6th edition Dennis, wixom, and roth
RISK REDUCTION PROCESS
Maintaining Information Systems (SAD- 18)
FSAR Configuration Control at PPL Susquehanna, LLC.
Jim Powers - Director, Fleet Engineering
Workshop 1: Processing Facility Configuration Information
Vendor Technical Information
Final Design Authorization
Managing Project Work, Scope, Schedules, and Cost
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Chapter 18 Maintaining Information Systems
Presentation transcript:

Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Characteristics of a Good Calculation Program Presented By: John Rothe SSES

Characteristics of a Good Calculation Program 1.There is an identifiable set of calculations to be maintained 2.Tools/data are effective in identifying the affected calculations when making a change 3.Calculations are easy to retrieve 4.Methods for revising calculations are efficient and effective

Characteristics (Continued) 5.Calculation format/content is consistent 6.There is clear ownership of calculations at the appropriate level 7.Errors are minimized in calculations 8.There is a process for notifying users of existing errors in calculations

Characteristics (Continued) 9.There is a clear status control imposed on calculations 10.Calculations are electronic and word searchable (enhancement) 11.Process requires approved calculations prior to design change package approval

Characteristics (Continued) 12.New and revised calculations are evaluated for potential impact and implemented through an appropriate change process

One approach: Identify target areas

7. Errors are minimized Historical errors, new errors Utility 1 - Anything prior to certain date is suspect and requires a re-verification Utility 2 – with tier 1 (Design Basis) if it hasn’t been re-verified in last 2 years requires re- verification. Sanity check when using a calculation

Errors are minimized Calculation Update program Margin review Validate against operating procedures Electronic media Re-validate classification Consolidate if possible Re-verify or not?

There is a clear status control imposed on calcs Approved / pending Limited edition calc Interim revisions for mods Committed (mod) final (as-built)

List of discussion topics Timeliness of change incorporation Handling of margin in calc. Ownership Wants to know how #11 can really be done Best practices to identify affected calcs. Cultural resistance to documenting the calc. per ANSI N What are the challenges? Issues with aging work force and tribal knowledge

List of discussion topics Future generations able to use calcs Source of basis difficult to determine Third party calc handling Sequencing & calc updating Cross ref’ing calcs to calcs, procedures Tracking inputs and outputs Old Standards –Where are they? Backlog reduction Build in quality with benchmarking ideas How to identify affected calc, input and affected documents

Identify Affected Calcs Calculation review and indexing DB cross referencing & search capability Supplemental tribal knowledge capture Culture & tools to capture info as part of work Affected document screening form – not just eng docs

Identify Affected documents Route document to those who might be impacted to identify other documents (builds with experience). Multiple calcs on same system – Data base design; owner control

Margin Acceptance criteria and relation to results clear in calc. Use Margins as indicator of calc health Requirement to discuss low margin in conclusion section of calc. Maint./Ops - Will come in and request the margin…..Maybe not the best thing to loudly expose margin

Ownership Yes Owner can delegate who can revise calcs Assign owner with calc health and innovation in calc methodology

Sequencing and Calc Updating Add step to t-week schedule to validate change calcs How many changes spur a revision? After 7 th addenda they have to be incorp. Banking changes can lead to balloon payments In manpower

Third party calcs 25 question owners acceptance validation Vendor calcs are reviewed and formatted in house

As-built vs Engineering Calcs Change notices vs revisions Discussion of pros and cons