October 2006 Mark Whitley Mid term Review 1 Mark Whitley LHCb VELO Backend Bonding at The University of Liverpool.

Slides:



Advertisements
Similar presentations
Factoring Trinomials When a 1.
Advertisements

Submission Spetember 2006 Canpolat et. alSlide 1 IEEE u Network Selection & MIH Support Notice: This document has been prepared to assist IEEE
0 - 0.
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Redesign of Die Internal Structure Dr. Henry Tan School of Mechanical, Aerospace and Civil Engineering The University of Manchester.
Module Production T. Bowcock. News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components.
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
VELO T. Bowcock1 Si Status T.Bowcock for S. Biagi, G.Casse, P. Cooke, M. McCubbin, A. Muir, J. Palacios, C. Parkes, U. Parzefal, G. Patel, J. Phillips.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
1 Liverpool Production Status Week of 23 February 2007.
LHCb Velo Construction Authorisation steps Tony Smith.
Back-End Bonding H&K 710 bonder Glue Pitch Adaptors Robot I&J2500 Glue Beetle Chip to Hybrid.
VELO Module Mid-Term Review T. Bowcock 11 October, 2006.
1 Liverpool Production Status Week of 9 February 2007.
1 Liverpool Production Status Week of 02 March 2007.
LHCb Pedestal Assembly Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 LHCb Pedestal Assembly Feet to Base Assembly Paddle Preparation Assembly.
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Electrical and thermal testing at Glasgow and Liverpool.
2010. EM EM Series Contents EM Family Modules  BASE  Head Module  Feeding System  Head Moving System  Optical System  Motion Control System Parts.
Addition 1’s to 20.
ATLAS Module building at Glasgow
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Tony Smith LHCb Velo EDR Liverpool 20-21/04/05 1 HYBRIDS- construction CONSTRUCTION of composite SUBSTRATE - many lay-ups tried – best flatness obtained.

Chip Carrier Package as an Alternative for Known Good Die
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
Inclined Plane Vanderbilt Student Volunteers for Science Fall, 2004 Training Refresher Presentation.
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
F.E.T.S. RFQ Support Structure by Peter Savage 21 ST October 2009.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Pull testing procedure. F ff ѲѲ 2f sin Ѳ = F If sin Ѳ = 30° then f = F If the angle of the 1 st and 2 nd bonds is 30° then the force we measure equals.
Sensor Testing Phil Turner. LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
SLHC Stave Wire-bonding Clearances (Tim) WP4 Glasgow (13 th June 2011)
Bump Bonding Development
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Wire Pull Test The wire pull test is performed using a Pull Tester (BT-14, DAGE 2400 PC, DAGE 4000) and a Pull Hook (performed by placing the hook 90°
The STS-module-assembly:
BM&N STS ladders assembly in VLHEP
ATLAS pixel module assembly flow
Developing Radiation Hard Silicon for the Vertex Locator
T. Bowcock University of Liverpool
Bonding study of wrapping part of PA1/2
Wire tension (pull on bond) f = F/2sinα
Hybrid Issues.
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
Thermosonic Bonding Ball bonding process A2 Group Members :
Sensor Wafer: Final Layout
ATLAS Upgrade Module Bonding Trials Using Glass Asics
HIC Assembly - Liverpool
Flex wire bonding with pattern recognition between each wire
October 2014 Star Data Prior to the C.A.F.E. Reading Initiative these were the results attained.
Presentation transcript:

October 2006 Mark Whitley Mid term Review 1 Mark Whitley LHCb VELO Backend Bonding at The University of Liverpool

October 2006 Mark Whitley Mid term Review 2 Backend Bonding The backend bonding using our Hesse and knipps bondjet 710. Use the Bonding Document.

October 2006 Mark Whitley Mid term Review 3 Setting Up For Bonding Back end bonding is all the wires that are bonded from the Beatle 1.5 down to the hybrid. Approximately 70 wires per chip. Radial side is different to the phi side. For back end bonding, the bonding jig needs to be mounted as shown. Allows the operator to visual inspect the bonding during the bonding process (the transducer will not foul the view of the operator).

October 2006 Mark Whitley Mid term Review 4 Calibration & Test Bonds Mount the hybrid in its handling frame. 1 st radial side up onto the bonding jig. 2 nd Phi side up. Apply the vacuum. If there is any leak of suction around the hybrid then you will experience problem bonds so it is important the hybrid is well supported. large gold pad, use this for a P-axle and wedge geometry calibrations. Prior to starting any bonding programs. In manual bonding use the same bonding parameters as the program. Bond 7 wires. Measure the pull strengths of these wires.

October 2006 Mark Whitley Mid term Review 5 Programs Two different programs. 1 st Program name lhcbhybr LHCb Hybrid Radial side. 2 nd Program name lhcbhybp LHCb Hybrid Phi side. There are 1,104 wires in the radial program and 1,088 wires in the phi program. If one wire has not been bonded it could mean the whole chip might not work. Bonding map for back end bonds. Addressing for each chip is different

October 2006 Mark Whitley Mid term Review 6 Reference Systems Both programs have 17 reference systems as show. The whole Hybrid is reference system 1. Each chip has its own reference system. All chip reference systems bond down to reference system 1.

October 2006 Mark Whitley Mid term Review 7 The Fiducials (Hybrid) Reference system 1 (the hybrid). The fiducials used for the reference system are as follows. Should the loaded program fail to find any of the alignment points. Manually align the eye points as shown using the red crosshair.

October 2006 Mark Whitley Mid term Review 8 The Fiducials (chips) Reference system 2. The fiducials for reference system 2 is repeated for every chip (Reference systems 2 through to 17). Should the loaded program fail to find any of the alignment points. Manually align the eye points as shown using the red crosshair.

October 2006 Mark Whitley Mid term Review 9 Bond Parameters Welding parameters: US-threshold 1: Bond force 1: US-threshold 2: Bond force 2: Change at: US-channel: Max. deformation: Max. bond time: Positioning parameters: Offshoot: Delay: 110 ms % CN % CN ms A % mm 10 ms Please see bonding document for comprehensive list of parameters