ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

Slides:



Advertisements
Similar presentations
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
Advertisements

Radiation damage in silicon sensors
STFC RAL EE at SLHC CERN 15/04/08 R M Brown - RAL 1 EE at SLHC What do we expect at SLHC? EE Layout VPT vulnerability to radiation - Faceplate darkening.
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Micron detector testing in Liverpool G. Casse – O. Lodge Laboratory, University of Liverpool.
LHCb Velo Construction Authorisation steps Tony Smith.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
1 New build-up technique with copper bump AGP Process.
Richmond House, Liverpool (1) 26 th January 2004.
10-Nov-2005US ATLAS Tracking Upgrade Santa Cruz 1.
Module design for B-layer replacement V.1. Bare Module dimensions mm Active area mm mm Footprint mm stack 200um chip 20um bumps.
VOORBLAD.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
30 th March 2010 IoP HEPP/APP Annual Conference 2010 UCL Charge Collection Annealing in ATLAS SCT Silicon Sensors Craig Wiglesworth.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
Charged Particle Tracker for a RHIC/EIC joint detector Detector layouts based on EIC and NLC Physics drivers Silicon detector technologies Simulations.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Module Integration Issues Changing Occupancy Requirements Current Module Proposals Module Design Issues Conclusions Phil Allport Module Integration Working.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
11 th RD50 Workshop, CERN Nov Results with thin and standard p-type detectors after heavy neutron irradiation G. Casse.
HEP GROUP MEETING work on the ATLAS UPGRADE T.J.Fraser.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
23 th November 2010 Possibly relevant new from RD50 G. Casse.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
23/01/2007ID Software Workshop1 SCT performance from the SR1 endcap data Satoru Mima Okayama University ID Software Meeting 23-Jan Noise Study -
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Liverpool High Energy Physics Phil Allport 18 th RD50 Workshop 23 rd to 25 th May 2011 WELCOME.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
Irradiations / Birmingham Status Paul Dervan, Tony Affolder and Sven Wonsak The University of Liverpool, UK Paul Dervan, Paul Hodgson, Kerry Parker, Matthew.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Straw man layout for ATLAS ID for SLHC
Developing Radiation Hard Silicon for the Vertex Locator
Tracking detectors/2 F.Riggi.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Update on Annealing Studies for Severely Irradiated Silicon Detectors
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Building the SemiConductor Tracker of the ATLAS Detector
L H C A T L A S International Collaboration on the LHC Project
Setup for testing LHCb Inner Tracker Modules
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan

Contents SCT ENDCAP-C past year Ashley, Katharine, Dave, George, Helen, Joost, Neil J, Neil T, Nick, Paul D, Paul P, Phil, Sergey, Scott, Tim + many SCT colleagues General ATLAS Super-LHC upgrade activities Ashley, Gianluigi, Joost, Neil, Peter, Phil, Tony +others joining

EC-C assembled in Liverpool. Last Year: Transported to CERN Tested and Repaired This year: Installation into ATLAS Service connections Warm tests Cooling installation 4 barrels 2 endcaps with 9 disks each ~60 m 2 of silicon strip detectors ~4000 modules 6.3 Million channels |η| < 2.5 Sct and Inner Detector

ID-C Status at end of 2006 SCT integrated into the TRT Models tested OK Cosmic ray tests carried out Waiting for installation into ATLAS

SCT EC Installation EC-C was moved to pit on June 18 th Plan was to move the week before (Friday) but due to rain postponed to Monday EC-C stayed the weekend in the unloading dock of SR1 The transport went very smoothly Only one crane was necessary to move EC from SR1 to SCX1 EC-C arrived in the pit around 11am Accelerations measured < 0.2g

SCT EC Installation Alignment of EC-C (Tuesday morning) and insertion was completed by 19h EC-C was positioned ~3.5mm away from its nominal position

SCT EC In Position

Phase 1 – Pre-Installation – June - July 2007 – (Complete) Phase 2 – LMTs (Connect & DC test) – August 2007 – (Complete) Phase 3 – Fibres (Connect & DwD) – August 2007 – (Complete) Phase 4 – Cooling installation – November - December 2007 Phase 5 – Power modules with cooling – January 2007 Sign off the End-cap (Pixel can now connect-up) Phase 6 – Full module readout with cooling – March 2007 SCT Installation and Commissioning

The rest of the ID Has been painful because of a short to LAr ground (insulation failure of the sliding rails). May 24 May 29

June 25 - June Pixel Installation

VA-A VA-C Ion pump Both Calorimeter beam pipes are now in position and connected to the Be pipe Calorimeter beam pipe installation

2 nd June 07 End-cap Toroids installation

ATLAS Inner Detector Upgrade To keep ATLAS running more than 10 years the inner tracker has to be replaced (Current tracker designed to survive up to 730 fb-1 10Mrad in strip detectors) For the luminosity-upgrade (SLHC) the new tracker will have to cope with >3000 fb-1 – much higher occupancy levels – much higher dose rates n eq /cm 2 pixel b-layer 9×10 14 n eq /cm 2 middle layers 5×10 14 n eq /cm 2 outer layers For a new tracker by 2015, major international R&D programme already underway. (Current ATLAS Inner Detector TDR CERN/LHCC/97-16 is now 10 years old)

Pixels: Short (2.4 cm) -strips (stereo layers): Long (9.6 cm) -strips (stereo layers): r=5cm, 12cm, 18cm, 27cm r=38cm, 49cm, 60cm r=75cm, 95cm z=±40cm z=±100cm z=±190cm New SLHC Layout Including disks this leads to: Pixels: 5 m 2, ~300,000,000 channels Short strips: 60 m 2, ~28,000,000 channels Long strips: 100 m 2, ~15,000,000 channels

WP3: Sensors Comparison of measured collected charge on different radiation-hard materials and devices (M. Bruzzi, H. F.-W. Sadrozinski, A. Seiden, NIM A 579 (2007) 754–761) Signal (electrons) Signal vs Dose Latest n-in-p data from Liverpool (1000V) Micron Semiconductor UK Ltd Liverpool are pushing the n-in-p sensor designs (Gianluigi)

WP3: Irradiated Microstrip CCE(V) 140mm and 300mm thickness (Micron) Doses up to n eq /cm 2 (Ljubljana reactor neutrons ) Short microstrip layers to withstand 9×10 14 n eq /cm 2 (50% neutrons) at 500V with 750e - noise, can expect S/N 12 Tony Affolder, Gianluigi Case

WP4: SLHC Hybrid conceptual layout Digital I/O Power/Aux Bus 99mm MCC Power Regulation 24mm 74mm SENSOR Readout ASICs Ashley (provisional) 2 fingers per hybrid populated with 2 columns of 10 ASICs (40 ASICs total) Electrically one item? 4 Cu Layers with Kapton dielectric (example from LHCb VELO) Working closely with chip designers Working on how to layout the redundancy (various ways) HV MCC: Module Controller Chip

WP7: Single-sided Module Concept

Results Single-sided 1W/sensor Cooling 1W/Sensor 0.38W/Chip Max Chip temp: -10C Max Si Temp: C Temp Gradient over Si: 1.17C

Thermal Runaway - Temperature NB. Conductivity of air = 0 for ease of comparison!

Summary SCT: SCT End-cap C installed in ATLAS Awaiting final tests with the cooling Upgrade: Liverpool is involved (and leading) in quite a few areas The Upgrade effect is increasing all the time Merry Christmas