CAT - 244 Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Do you know your signs?.
Chapter 12 Freeway Driving.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Harris Road Question 2. Contract Zone In February, Justin Fletcher requested the Town Council grant a Contract Zone for his property located at 3 Longwoods.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
© OPDS 2009 WELCOME TO OCEAN PARK DRIVING SCHOOL My Name is Kim Filby and I will be your Driving School Instructor First things first, do we all know our.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Traffic Controls Lesson 1 Understanding Traffic Signs and Signals
Traffic Controls Lesson 1 Understanding Traffic Signs and Signals
Hardin County Engineering Department September 12, 2006.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
What Makes a Roadway Safe? ISLAND COUNTY PUBLIC WORKS DEPARTMENT Press key to advance this display.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
2.75 Miles Route A 2.75 Miles Route A Presidential SP Quarter mile markers are marked with orange circles at the locations designated
Ch. 6 - Passing NY State DMV 1. The law requires that we drive on the right side of the road.  When we are allowed to pass other vehicles, we usually.
From Island Estates Parkway to St. Johns County Line.
Driver Theory Traffic Signs Work Zone Signs. Work Zone Work Zone Signs are usually diamond shaped, like warning signs, but they are orange instead of.
Exit Quiz Road Signs Recognition
Virginia Learner’s Permit
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Timothy E. Barnett, P.E., PTOE State Safety Operations Engineer Alabama Department of Transportation.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Community Development Department Construction Phase.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
STA Safety Project PID #76439 December 12, 2006.
Traffic Signs Warning Signs Construction Signs. Warning Signs Warning Signs tell you what to expect on or near the road. They warn you about possible.
Intersections.
Understanding Regulatory and Warning Signs Regulatory Signs Regulates and controls the movement of traffic. Tells drivers what to do and what not to.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
At-Grade Intersection Design
Signs, signals,& Road Markings
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 8 December 3, 2015.
6-1 Module 6: Group Activity Wright County Safety Review Identifying Opportunities for Making Roads Safer 6-1.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Maintenance and Temporary Traffic Control
9.6 Turning Roadways and Channelization, Types of Turning Roadways p.9-55 ~ 9-92 Lean how to determine minimum edge-of-traveled- way radii for the.
Intersections.
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
North Main Street Intersection Improvements at Route 460 Bypass
Minnesota Driver’s Manual – Chapter 3
Geometric Design: General Concept CE331 Transportation Engineering.
Walker Street Reconstruction Project 25% Design Public Hearing
Monterey County Project Report for Measure X Expenditures
Presentation transcript:

CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009

2 Project Introduction  To improve public safety, approximately 2.5 miles of roadway will be constructed.  0.4 miles of realigned roadway will be new construction to eliminate the dangerous “S” curve on Rt. 28A.  2.1 miles of roadway improvements to existing Rt. 28A include tree line cut-backs, pavement and shoulder widening, guide rails, directional signage, etc.  Two existing intersections will be reconstructed.  The width of the lanes is being increased from 9 to 12 feet.  A typical clear zone is 30 ft from the edge of travel lane

3 Project Introduction  Design speed of 45 mph and a posted speed limit of 40 mph between Waste Channel Bridge and Rt. 214 intersection  Design speed of 40 mph and a posted speed limit of 30 mph between Waste Channel Bridge and Dividing Weir Bridge  A parking lot located near the intersection of Route 213 is added to facilitate public safety for people who visit the area for bird watching or utilize the dam’s walkway for exercising.

4 Project Introduction Contractor: DA Collins Construction Construction Manager: NYCDEP & Haider Engineering P.C. Engineer: Greeley and Hansen LLC

5

6 Rt. 28A and 213 Intersection Existing New

7 New Monument Road Parking Lot

8 Monuments Rd and Rt. 28A Intersection New Existing

9 Construction Schedule  Clearing/Grubbing: Jan-March, 2009  Waste Channel to existing “S” turn: Spring/Summer 2009  Dividing weir to Waste Channel: Summer/Fall 2009  Route 213 to “S” turn: Spring 2010

10 Construction Schedule

11 Construction Activities:  Working hours- 8:00 AM – 4:30 PM  Flagmen/security services will be provided  Maintenance and protection of traffic will be required for at least one lane of traffic.  Standard construction noises from both mobile and stationary equipment will occur as well as from the limited rock blasting.

12 Questions