Doc.: IEEE 802.11-08/0130r0 Submission January 2008 Gal Basson (Wilocity)Slide 1 VHT PAR Direction Date: 2008-01-09 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /661r1 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Advertisements

Doc.: IEEE /661r0 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Doc.: IEEE /078 Submission May 2000 Matthew Shoemake, AlantroSlide 1 Information Regarding and Status of HRbSG Matthew B. Shoemake HRbSG Chairperson.
ECMP for 802.1Qxx Proposal for PAR and 5 Criteria Version 2 16 people from ECMP ad-hoc committee.
Submission doc.: IEEE 11-13/1100r0 September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Progress Review Date: Authors:
Doc.: IEEE /1510r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 Summary of PAR and CSD Discussion Date: Authors:
Beyond ad – Ultra High Capacity and Throughput WLAN 2nd presentation
Doc.: IEEE /0271r4 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 Comments on TGay PAR and CSD Date: Authors:
Doc.: IEEE /1126r0 Submission September 2012 Krishna Sayana, SamsungSlide 1 Wi-Fi for Hotspot Deployments and Cellular Offload Date:
Doc.: IEEE /0848r0 Submission January 2008 Gal Basson (Wilocity)Slide Wireless LAN user experience Date: Authors:
Submission doc.: IEEE 11-14/0026r1 January 2014 Yong Liu, et al.Slide 1 Thoughts on HEW PAR Date: Authors:
Doc.: IEEE /252 Submission November M. Hoeben - No Wires Needed Load Balancing PAR Criteria Maarten Hoeben.
Submission doc.: IEEE 11-12/0589r1 May 2012 Donald Eastlake 3rd, Huawei R&D USASlide 1 General Links Date: Authors:
Doc.: IEEE /286r3 Submission July, 2006 Noriyasu Kikuchi, Oki Electric Industry Co., Ltd.Slide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
doc.: IEEE r0 Submission March 2000 Rick Alfvin, Eastman Kodak CompanySlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.:IEEE /1050r0 Submission September 23, 2009 Samsung Slide 1 Possible Technologies for TGac Mobile Device Support Authors: Date:
Doc.: IEEE /0065r0 Submission January 2014 William Carney, SONYSlide 1 Comments on Draft HEW PAR Date: Authors:
Doc.: IEEE /0583r0 Submission March 2009 Mark Grodzinsky, WilocitySlide 1 Amendment to WFA Usage Models Date: Authors:
Submission doc.: IEEE 11-14/0136r2 January 2014 Gal Basson, WilocitySlide 1 Beyond ad – Ultra High Capacity and Throughput WLAN 2 nd presentation.
Doc.: IEEE /2587r0 Submission September 2007 Gal Basson (Wilocity)Slide 1 VHT Applications Date: Authors:
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
1 6/3/2003 IEEE Link Security Study Group, June 2003, Ottawa, Canada Secure Frame Format PAR: 5 Criteria.
Doc.:IEEE /0821r3 Submission July 2008 Minho Cheong, ETRISlide 1 Some Ambiguities about Throughput Conditions in PAR Date: Authors:
Doc.: IEEE /0542r0 SubmissionSimone Merlin, QualcommSlide 1 HEW Scenarios and Goals Date: Authors: May 2013.
Doc.: IEEE r0 Submission November 2002 Pratik Mehta Slide 1 Next Generation WLAN Standard Pratik Mehta.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Security Problems related to Transition Date Submitted: January.
Doc.: IEEE /084r0 Submission March 2000 David Skellern, RadiataSlide 1 Comments by P WLAN WG on P WPAN High Rate Study Group PAR 7.
Doc.: IEEE / Submission March 2013 Juho Pirskanen, Renesas Mobile CorporationSlide 1 Discussion On Basic Technical Aspects for HEW Date:
1 IEEE interim, Orlando, Florida, March, 2008new-nfinn-fast-chains-rings-par5c-0308-v1 Fast Recovery for Chains and Rings Proposal for PAR and 5.
Doc.: IEEE /286r2 Submission July, 2006 Tadahiko Maeda, Oki Electric Industry Co., Ltd.Slide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE sru Submission 11 November 2013 M Ariyoshi, S Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0860r0 Submission July 2010 Jon Rosdahl, CSRSlide 1 Comments for p New PAR – July 2010 Date: Authors:
Doc.: IEEE ulp Submission Slide 1 May 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE /492r00 Submission Orange Labs Date: Collaboration between 2.4/5 and 60 GHz May 2010 Slide 1 Authors:
November 99 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal for WPAN High Rate Study Group]
Below 6GHz 11vht PAR&5C's proposal
Mapping WFA Usage Models to Operating Bands
Comments on HT PAR & 5 Criteria
Response to c Questions on VHT60 PAR
VHTL6 task group work plan proposal (VHTL < 6 GHz)
doc.: IEEE <doc#>
VHT SG Report to EC Date: Authors: July 2008 April 2007
VHT SG PAR Feedback from Individuals
Technology and Use Cases for TGac
VHTL6 Tutorial (VHTL < 6 GHz)
Towards IEEE HDR in the Enterprise
VHT60 Tutorial Date: Authors: July 2008 April 2007
VHT SG Report to EC Date: Authors: July 2008 April 2007
VHT PAR Direction Date: Authors: January 2008 July 2007
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PAR and CSD document discussion] Date Submitted:
Technology and Use Cases for TGac
Raising the PAR Date: Authors: January 2014 January 2014
<month year> Denver, March 2006
VHT60 Tutorial Date: Authors: July 2008 April 2007
Response to c Questions
Submission Title: [Proposal on PAR and 5C draft for BAN]
Raising the PAR Date: Authors: January 2014 January 2014
Proposed text for HTSG draft PAR and 5 Criteria
Below 6GHz 11vht PAR&5C's proposal
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PAR and CSD document discussion] Date Submitted:
900 MHz ISM Band Date: Authors: January 2010 Month Year
Submission Title: [VHT liaison report] Date Submitted: [15 May 2008]
IMT.Advanced aligned scope proposal
VHT - SG Date: Authors: July 2007 Month Year
VHT SG March 2008 Closing Report
Below 6GHz 11vht PAR scope and purpose discussion
WLAN Overlay with 60 GHz Channels
Interest for HDR extension to a
Presentation transcript:

doc.: IEEE /0130r0 Submission January 2008 Gal Basson (Wilocity)Slide 1 VHT PAR Direction Date: Authors:

doc.: IEEE /0130r0 Submission January 2008 Gal Basson (Wilocity)Slide 2 Content 1.Introduction and objective 2.Market needs-Usages 3.5 (6) Criteria 4.Conclusion

doc.: IEEE /0130r0 Submission Introduction and Objective VHT – Stands for Very High Throughput Discuss the market needs for Very High TPT Target solution requirements that meets the 5 criteria Suggest direction towards the PAR January 2008 Gal Basson (Wilocity)Slide 3

doc.: IEEE /0130r0 Submission Market Needs (Usage models) From WFA usage models (2792r0): 1.Wireless Docking 2.In Home Distribution of HDTV and other content 3.Rapid Upload and Download of large files to/from server 4.Backhaul Traffic (e.g. for Meshing, Enterprise, Small Office) 5.Campus / Auditorium deployments 6.Manufacturing Floor Automation Additional usages: –Distributed platforms (Advanced Docking) –“Sync and Go” Over IP January 2008 Gal Basson (Wilocity)Slide 4

doc.: IEEE /0130r0 Submission Mapping the usages to rates 1.Wireless Docking 1.Simple KVM- 3-5 Gbps (wuxga) WQXGA can get up to 9.8 Gbps 2.Advanced (distributed platforms) – 5-8 Gbps 2.In Home Distribution – up to 10 Gbps (2792r0) 3.Rapid Upload/”Sync and go”- 5 Gbps (2-layer blue ray disc can store 50 Gbyte) 4.LAN traffic – Ethernet is already at 10 Gbps,.11 will follow. January 2008 Gal Basson (Wilocity)Slide 5

doc.: IEEE /0130r0 Submission Market Drivers January 2008 Gal Basson (Wilocity)Slide 6 Need for Higher TPT standard Maintain Wired equivalence GigE is widely deployed 10GigE is emerging Faster CPUs Larger and Faster Storage HD content Faster CPUs Larger and Faster Storage HD content SSD Growing 2x a year >80 GB iPOD and camcorders DVD Capacity growing 8x Blue Ray– 50 GB dual layer Competitive environment driving Proprietary 11n extensions Proprietary modes fragment the market Higher Capacity Gigabit nano-cells free capacity for normal network use

doc.: IEEE /0130r0 Submission CPU performance drives networking speed Confidential 7 Source: Sun Microsystems

doc.: IEEE /0130r0 Submission By expect strong demand for new WiFi to Stimulate Revenues Stimulate WiFI Market with speed upgrade Source: ABI research 2Q b started at 1999, 11g started at 2003, 11n started at late 06  4 years cycle.. VHT at late 2010

doc.: IEEE /0130r0 Submission VHT A new PHY/MAC standard should support a data rate of at least 5 Gbps. –In order to be relevant 5 years from now –To satisfy the emerging throughput-hungry applications For such a high rate there is no substitute for BW –The 60 GHz band has 7-9 GHz of unlicensed BW with quite high output power and EIRP regulatory limits. January 2008 Gal Basson (Wilocity)Slide 9

doc.: IEEE /0130r0 Submission Suggested path for VHT To define standardized modifications to the MAC and PHY layers to operate in the 60 GHz band to achieve at least 5Gbps of over -the-air data rate. January 2008 Gal Basson (Wilocity)Slide 10

doc.: IEEE /0130r0 Submission January 2001 VK Jones, Ph.D, Woodside Networks.Slide 11 5c Worldwide Acceptance Meets the 5 Criteria 1. Broad Market Potential 2. Compatibility 3. Distinct Identity 4. Technical Feasibility 5. Economic Feasibility

doc.: IEEE /0130r0 Submission Broad Market Potential Platforms with >20GB HDD/SSD are everywhere.11 is known to be IP over Wireless Media appliances moving to HD content Significant industry-wide incentive to drive innovation into a commoditizing market of 11n (2010+) January 2008 Gal Basson (Wilocity)Slide 12

doc.: IEEE /0130r0 Submission Compatibility Backwards compatible to earlier IEEE standards – Triple-band WiFi Precedent:.11b/g are single band standards 11n which came later is a dual band standard. January 2008 Gal Basson (Wilocity)Slide 13

doc.: IEEE /0130r0 Submission Distinct Identity Substantially different from other 802 standards –Proposed speeds are substantially higher than the maximum n rates ~ 10 times higher –Addresses non-PAN market needs; e.g., traffic backhaul and campus/auditorium connectivity. January 2008 Gal Basson (Wilocity)Slide 14

doc.: IEEE /0130r0 Submission Technical Feasibility The availability of 7-9 GHz of unlicensed BW in the 60GHz band makes it very easy to achieve VHT. There are existing proprietary proofs of concept for wireless systems in 60GHz. – Ymk January 2008 Gal Basson (Wilocity)Slide 15

doc.: IEEE /0130r0 Submission Economic Feasibility Current processes more than adequate to support Giga speed Low cost 60GHz transceivers proven by several vendors VHT products must hit same cost envelope as 11n January 2008 Gal Basson (Wilocity)Slide 16

doc.: IEEE /0130r0 Submission Backup January 2008 Gal Basson (Wilocity)Slide 17