FAIRway Danube Commission Meeting in Budapest

Slides:



Advertisements
Similar presentations
ENQA’S CONSULTATIVE MEMBERSHIP IN THE BFUG - WHAT DOES IT ENTAIL
Advertisements

Central Office for Development Strategy and Coordination of EU Funds ABSORPTION CAPACITY FOR IPA COMPONENTS III AND IV IN CROATIA 19 October 2009 Zvonimir.
1 Report on the Implementation of the EUSBSR Anders Lindholm European Commission Directorate General for Regional Policy.
Perspectives of development Petar Margic Budapest, September 17th, 2013 Danube Commission, Budapest.
Analytical Evidence on Research & Innovation in the Danube Region Progress of WP4 Vienna, Béla Kardon, PhD; RCISD
Sustainable development of inland waterways transport Tamás Marton – Ministry of Transport, Communications and Energy – Hungary
RIS Implementation survey and policy evaluation RIS workshop Italy October 2012 Sandra van Putten/Panteia-NEA.
Project presentation. Network of Danube Waterway Administrations – data and user orientation SVP via donau OVFRSOE AVP Plovput ACN EAEMDR AFDJ Photo credits:
Activities of Pro Danube International
Monika Schönerklee-Grasser JTS CENTRAL EUROPE PROGRAMME The CENTRAL EUROPE Programme Staccato is a project of the concerto initiative co-funded.
Global Business Transformation Master (GBTM) Certification
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Current state of play in the NtS Expert Group Danube Commission RIS Workshop Budapest 11 th April 2011.
The European TEN-T corridors
Platform for the implementation of NAIADES 
Guidelines for the administration of axis 4 LEADER 17th July 2014, Nitra Mgr. Veronika Korčeková, MA Ministry of Agriculture and Rural Development of the.
“SAFETY THROUGH QUALITY” Vessel Traffic Management and Information System on Romanian Danube ( Ro – RIS )
Vukovar, December , 2012 EAEMDR Status Report Bulgaria.
REHABILITATION AND DEVELOPMENT OF NAVIGATION ON THE SAVA RIVER.
Ministry for Regional Development of the Czech Republic MEETING OF DIRECTORS GENERAL “Territorial Cohesion” The Implementation of Action 1.1a (Urban –
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
European Commission eContent Towards the Workprogramme.
Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012.
1 IRIS Europe II – Implementation of River Information Services in Europe This project is co-funded by the European Commission / DG-TREN / TEN-T A project.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
WANDA - project overview and status Dr. Harald Beutl via donau – Österreichische Wasserstraßen-Gesellschaft mbH Budapest, Projektstatus “WANDA”
Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC.
Selected Activities of the Sava Commission DANUBE INFORMATION SERVICES CONFERENCE – DISC, Belgrade, 3rd-4th December, 2013.
Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary  Project goal is to ensure realization of national green technology policy aspiration and.
Status report Slovakia
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
1 Joint Research Centre (JRC) Annual Meeting of the EGTC Platform The EGTC-ready to use - Beyond cohesion policy Ulla Engelmann Interinstitutional and.
Portugal’s Gender Statistics Database: the Gender Profile Economic Commission for Europe Conference of European Statisticians Group of Experts on Gender.
Sergey Tzarnakliyski Belgrade, December 4, 2013 Danube Commission, Budapest Selected Activities of the Danube Commission Steps towards sustainable Mobility.
Overview of the Situation and Challenges for Water Quality Monitoring and Reporting in South Africa Wandile Nomquphu Department of Water Affairs and Forestry.
Budapest Danube Contact Point: an innovative tool to support the implementation of Danube Strategy Peter Kiss-Parciu Budapest Danube Contact Point EU Strategy.
BOSNIA AND HERZEGOVINA Cabinet of the Chairman of the Council of Ministers Public Administration Reform Coordinator’s Office PUBLIC ADMINISTRATION REFORM.
7 th Framework Programme: KNOWBRIDGE project The Cross Border Knowledge Bridge in the Renewable Energy Sources Cluster in the East Slovakia and North Hungary.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
Platform for the implementation of NAIADES River Information Services in Europe – results of a survey Andreas Bäck Deputy Project Coordinator of PLATINA.
Horst Schindler Vukovar, December 12, 2012 Danube Commission, Budapest Selected Activities of the Danube Commission Steps towards sustainable Mobility.
Platform for the implementation of NAIADES State of Play of RIS in Europe RIS Workshop of the Danube Commission Budapest, 11th of April 2011 Andreas Bäck.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing processes Core business of the NSO Part 1 Strengthening Statistics Produced in Collaboration.
Belgrade, December , 2013 EAEMDR Status Report Bulgaria.
Galati Municipality – project status - PCT meeting, Enns, 6-8 March
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
The fortieth session of the Working Party on the Standardization of Technical and Safety Requirements in Inland Navigation (SC.3/WP.3) (15-17 February.
HQVET High Quality of Vocational Education and Training - European best methods for improving VET system Meetings, Tasks and Responsibilities This project.
Overview of GFCM activities related to the MSFD Miguel Bernal Marine Strategy Coordination Group Brussels, 12 th – 13 th November 2013 GENERAL FISHERIES.
JOINT STATEMENT FOLLOW UP MEETING `09 Horst Schindler, Ivana Tomic Budapest, January 29, 2009 Danube Commission, Budapest.
Stela Barova, senior expert, “Marine environmental protection and Monitoring” Department, “Plans and Permits” Directorate State of play of MSFD implementation.
The NEWADA project in the Danube Corridor Hélène Masliah-Gilkarov via donau New Orleans 15 September, 2011.
RIS & IWW TEN-T Calls 2012 Open Annual and Multi-annual Calls for Proposals Nadia Chellafa – Project Manager – Ten-T Executive Agency.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Monitoring Visit to NatRisk Project
PLANNED ACTIONS – UPCOMING DUTIES
INTERREG VB Danube Transnational Programme
Enabling multi-modality and efficient freight logistics
Planning is a critical success factor
Marine Strategy Framework Directive (MSFD)
TRIMONITOR Danube TRIbutary MONITORing programme
EUSDR Action Plan - Revision
An overview The EU Strategy for the Danube Region -
News from the Sava Commission
Marine Strategy Framework Directive (MSFD)
DG Troika – 26 October – Portugal
Project delivery RIBA stages Define design deliver Key Objectives 1 2
MIG-P orientation debate
Danube Strategy New Challenge and new Opportunities- State of Play
Common strategy development process I
Presentation transcript:

FAIRway Danube Commission Meeting in Budapest 29.09.2015 Károly GOMBÁS (Andreas Bäck)

Harmonized realization of the Fairway Rehabilitation and Maintenance Master Plan Global Project IWW of the Rhine-Danube Corridor Proposed Action FAIRway waterways

Fairway Maintanance Master Plan Conclusions by Danube Ministers Fairway Maintanance Master Plan for the Danube and its navigable tributaries Guidelines + CEF Page 3

Key facts Schedule Start: 07/2015 Closure: 06/2020 [Duration of 5 years] Budget Total: 23,4 Mn EUR CEF: 19,7 Mn EUR Setting Multi-applicant CEF study including pilot operations: seven interlinked actions

Overview on FAIRway activities Elaborate coordinated national action plans and define pilots Procure equipment for hydrological services Execute and evaluate pilots Harmonized basic data on critical locations Coherent monitoring of navigational status Harmonized water level prognosis Potential of fairway relocation and floating ship data Develop innovative approaches (aerial monitoring, AtoNs …) Prepare documentation for future implementation steps Manage project and disseminate results

Activity 2 National action plans and definition of pilots Ministerial Conclusions (Dec 2014) ask for national roadmaps based on the Fairway Rehabilitation and Maintenance Master Plan until June 2015. Further development within FAIRway: Develop 1st version further Update national action plans yearly Elaborate pilot implementation concept and evaluation framework

Activity 3 Procurement of hydrological service pilots Joint market survey, aligned technical specifications, preparation of procurement documents with support of international experts Joint tenders envisaged for transnational waterway asset management system. Data gathering Data processing and analysis Respond to data 5 surveying vessels (3 multi-beam: SK, HU, RO - AFDJ, 2 single- and multi-beam: HR, BG 24 new + 13 modernized automatic water-level gauges (9 HR, 10 BG, 10 RO – AFDJ, 8 RO – ACN) Central computer based system for measured water levels (HR, BG, RO -AFDJ, RO-ACN) … - Hardware and software for interconnected waterway asset management systems - National water level prognosis set-up for a selected number of gauging stations (upgraded water level prognosis: HU, BG; new water level prognosis: HR, RO – AFDJ, RO - ACN) - 4 Multifunctional marking vessels (SK, HR, RO - AFDJ, BG) [ … 5 equipment for floating ship data: echo sounder, positioning system and data collector (4 HU, 1 HR) 3 sediment monitoring facilities (HU, RO - AFDJ, BG) 1 ADCP sensor (RO - AFDJ) 1 side scan sonar (RO - AFDJ) 1 on-line (web-cams) based system for remote meteorological condition monitoring, ice phenomena probability (BG) … ] Surveying vessels and gauging stations, floating ship data Waterway asset management system Water level prognosis Multifunctional marking equipment

Activity 3 Pilot operation over 3 years… Joint market survey, aligned technical specifications, preparation of procurement documents by national experts. Joint tenders envisaged for transantional waterway asset management system. Activity 3 Pilot operation over 3 years… Systematic decision support through improved data analysis. Exploit full potential of navigation conditions through dynamic marking Optimized surveys with denser intervals at critical locations. Strategically placed water level gauges deliver basic data. Matchable water level prognosis displayed in a harmonized way. … to gain experience for the full deployment of the FRMMP

Activity 5 Innovative approaches Add new perspectives to the waterway administration. Aerial photo monitoring concepts Optimum speed at navigable canals Recalculation of Low Navigable Water Level at the Lower Danube Agree on AIS AtoN application standard

Activity 6 Documentation for full deployment Prepare for the full implementation of the Fairway Rehabilitation and Maintenance Master Plan based on the national roadmaps and pilot results. Feasibility studies in Slovakia (Lower Váh and Gabcikovo) Prepare implementation of additional measures

Thank you for your attention! Contact Andreas Bäck viadonau Strategy & Action Programmes T +43 50 4321-1609 andreas.baeck@viadonau.org Donau-City-Straße 1, 1220 Vienna