R Scrivens – sLHC-PP annual meeting Feb 2010 SLHC-PP – WP7 Critical Components for the SLHC injectors (SPL) 7.1 Plasma Generator for a SPL ion source (J.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Lorentz force detuning measurements on the CEA cavity
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Tuning system requirements
Injector RF Design Review November 3, 2004 John Schmerge, SLAC LCLS RF Gun Thermal Analysis John Schmerge, SLAC November 3,
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
ESS cavities interfaces
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Linac Marx Modulator Update Trevor Butler 5/20/2015.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Lutz Lilje, DESY, TILC08 Tests with the Fast Frequency Tuners in the Saclay-I design Lutz.
RF Cavity Simulation for SPL Simulink Model for HP-SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgement: CEA team, in particular O. Piquet.
LLRF Cavity Simulation for SPL
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Development of an H - plasma generator for SPL Matthias Kronberger, CERN BE/ABP-HSL SPL collaboration meeting, 2010/11/25.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
W. 3rd SPL collaboration Meeting November 12, 20091/23 Wolfgang Hofle SPL LLRF simulations Feasibility and constraints for operation with more.
RF Cavity Simulation for SPL
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
SLHCpp 3rd Annual Meeting Feb 7-8, 2011 reported by Wolfgang Hofle SLHCpp Work Package 7 “Critical Components for Injectors” Status February 2011 Participation.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
RF Summary SLHIPP – 1 o. brunner BE-RF. RF sources and beam dynamics: o Magnetrons (Amos Dexter Lancaster Univ. ) o LLRF for the SPL SC cavities (Wolfgang.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
SPL waveguide distribution system Components, configurations, potential problems D. Valuch, E. Ciapala, O. Brunner CERN AB/RF SPL collaboration meeting.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Detail plan of S1-Global H. Hayano (KEK),
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
LLRF Control Simulations for SPL Cavities Simulink Model for SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgements: CEA team, in particular.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Piezo Tuning System (PTS)
ESS LLRF and Beam Interaction
Cryomodule test stand at ESS site
Test of the dressed spoke cavity
WP5 Elliptical cavities
Power Couplers, HOM Couplers and Tuners for the XFEL
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Second SPL Collaboration Meeting, Vancouver May 2009
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Test plan of ESS HB elliptical cavity
Mechanical setups Lorentz Force Detuning System Setup
Test plan of ESS HB elliptical cavity
Review of the European XFEL Linac System
CW accelerating module test progress at DESY
Prototype cryomodule development
Presentation transcript:

R Scrivens – sLHC-PP annual meeting Feb 2010 SLHC-PP – WP7 Critical Components for the SLHC injectors (SPL) 7.1 Plasma Generator for a SPL ion source (J Lettry, CERN, STFC, DESY) 7.2 Low Level RF system for SPL cavities (G Devanz [CEA Saclay], W Hofle [CERN], P Pierini, R. Paparella [INFN] Design of HP SPL plasma GeneratorSaclay SC cavity with tuner

R Scrivens – sLHC-PP annual meeting Feb Plasma Generator for a SPL ion source Create rotationally excited H2 Attach additional electron Molecule disassociates } General principle of an RF H- ion source (modified scheme of M. Stockli, SNS) Dipolar filter field (remove fast electrons) Inject high power RF (<100kW, 2MHz) ions Multicusp magnets (confinement) SLHC-PP Goal: Design and test the plasma generator at high duty factor

R Scrivens – sLHC-PP annual meeting Feb 2010 SLHC 7.1 meeting January 26th CERN, Room Comments, summary and conclusions 1) Experimental area Status (JL) 2) Power supply and RF amplifier (David, Mauro) Remaining power supplies specs should be sent to David. The average power dissipate by the 2 power racks will be ~ 50 kW RF amplifier built, interlock by end Feb. (Jose Marquez) Auto Voltage control (AVC) by end Feb. then tests. Matching network and insulating Transfo to be designed (we could start with the linac 4 transfo Remaining spending (2 MHz ampli: 35 kCHF) 3) Status of plasma generator production (December status (JL for Gilles, Didier, Elodie) 4) RF heating of magnets (Dan - Matthias) Up to 600 A/mm 2, 50 W average into10 micron Ni coating up to 150 W/magnet Cooling mandatory (Cu conducting to heat pipes but its low Mu doesn’t shield B fields) Demineralized water mu=80 should be included in simulation check other cooling fluids (MK) Ni saturated, investigate Cu-Ni layer deposition may require round edges. Test required on simple geom.

R Scrivens – sLHC-PP annual meeting Feb ) Cusp Magnetic field & Gas injection (Claus) Investigate move of permanent magnets outwards and transport of B field via ferrites (CS) Check mean free path of electrons P(H2) Simulation of new valve compared with old valve measured data 9repeat measurement. All measurements with one vacuum setup. 6) Simulation (Liviu) 7) Draft measurement scheduling (JL) Ambitious and optimistic to collect data for the H- conference by September and to allow partial redesign after intermediate analysis. 8) linac 4 experimental program (Oystein) 9) Summary and conclusion (all) Meeting in 2 month focused on RF induction on permanent magnets and their cooling Still on schedule to meet sLHC-PP deliverables.

R Scrivens – sLHC-PP annual meeting Feb Plasma Generator for a SPL ion source Ignition source Frame Plasma chamber Confinement magnet Collar During the project second year: Thermal issues that required solutions were detailed. The plasma generator was completely redesigned in order to include cooling, and mitigate the effects of adding this. It is now partially in production.

R Scrivens – sLHC-PP annual meeting Feb 2010 Extensive thermal simulations made of the model. Examples of conclusions: Use of AlN as a ceramic (high thermal cond.) Engrave cooling channel into the ceramic (improve thermal contact of water with material) Staggered helical cooling channel. Collar electrodes brazed onto ceramic, on a copper base flange with cooling required.

R Scrivens – sLHC-PP annual meeting Feb 2010 A dodecapole magnet structure is used for confining the plasma. Inserting a cooling jacket around the chamber moves the magnets outwards, decreasing the srength of the field (no margin to increase the magnet's strength). Solution to use a Holbach-3 magnet design (in order to maintain the same tangential field strength on the chamber inner wall.

R Scrivens – sLHC-PP annual meeting Feb 2010 Results of measurements of the Linac4 source show higher RF antenna currents. These induce higher currents in the permanent magnets. Produces a high heat load into a critical zone. Additional RF shielding is being investigated as a solution. Current induced into the permanent magnets by the RF antenna. RF antenna.

R Scrivens – sLHC-PP annual meeting Feb 2010 Test area in preparation, demin water, gas, electricity updated. Vacuum system now installed.

R Scrivens – sLHC-PP annual meeting Feb 2010 (7.1.3 in M30) Construction of the plasma generator and sub-systems (e.g. 2MHz RF generator, hydrogen gas injection and pumping) (7.1.4 in M36) Plasma generation and study of the thermal and vacuum conditions Tight to make these on time, but still feasible.

R Scrivens – sLHC-PP annual meeting Feb Low level RF for SPL Characterisation of the CEA, Saclay beta=0.47 cavity and tuner. Prospects for the INFN cavity and tuner. SPL RF power layout. Simulation of low level RF system RF ref

Saclay piezo tuner on the beta 0.47 cavity Planetary gear box (3 stages) Single NOLIAC 30mm piezo actuator to compensate for Lorentz Force Detuning Slow tuner with symmetric action Stiffness measured on the tuner pneumatic jack = 35 kN/mm G. Devanz CEA/Saclay

Tuner and coupler characterization in cryholab The full system : Beta cell 704 MHz cavity 1MW power coupler Magnetic shield Piezo tuner G. Devanz CEA/Saclay

R Scrivens – sLHC-PP annual meeting Feb 2010 G. Devanz CEA/Saclay 4.5 K, amplitude = +760kHz corresponding to 2.5 mm -> would be +400 kHz on SPL beta=1 cavity Mechanical hysteresis measurements will be done at 1.8 K Piezo tuner characterization Beta = 0.47 cavity measured at 1.8 K (main tuner parts at 20 K) piezo 44V for 1 mm elongation of the cavity ( ~2 mm for the piezo actuator) Maximum detuning measured at 150V DC is 1 kHz Measurement of the cavity tuning offset as a function of tuner parameter

R Scrivens – sLHC-PP annual meeting Feb 2010 G. Devanz CEA/Saclay Piezo tuner caracterization ? Phase demodulation measurements at 1.8K Transfer Function of piezo drive -> cavity detuning Fcav=703 MHz, far from tuner neutral point for correct piezo pre-load 3 or 4 dominant modes are observed Transfer function measurements – Excite cavity mechanical modes with the piezo

R Scrivens – sLHC-PP annual meeting Feb 2010 G. Devanz CEA/Saclay Cavity : Eacc=13 MV/m RF: Repetition frequency = 50Hz, pulse length 2ms Measurements using CERN developed LLRF (D. Valuch et al.) Piezo off Field change due to Lorentz force detuning Amplitudes phase Lorentz force compensation with Saclay piezo tuner Piezo on - Amplitude excursion now reduced to 1.4% and phase shift within ± 8 deg (not shown)

R Scrivens – sLHC-PP annual meeting Feb 2010 G. Devanz CEA/Saclay Conclusion – Characterisation of first tuner The mechanical characterization of the piezo tuner and cavity has been carried out. A Matlab model has been developed in cooperation of the CEA and CERN teams. Lorentz force detuning compensation at 50Hz demonstrated on the beta 0.47 cavity with the Saclay piezo tuner manually up to 13 MV/m. The cavity voltage stability is already suitable for a Low Level RF system. Automatic and optimal compensation is the next step : piezo drive signal synthesis by superposition of simple pulses is foreseen. The systematic measurements to check the validity of this approach just started, an interface from the CERN LLRF system to the piezo drive will be built

R Scrivens – sLHC-PP annual meeting Feb 2010 Room temperature test stand - INFN A special test stand has been equipped at LASA for room temperature evaluation of slow and fast tuning performances Test stand elements Tuning range measurement at warm P.Pierini, INFN

R Scrivens – sLHC-PP annual meeting Feb 2010 INFN cavity/tuner – Possible Schedule Warm characterisation of Cavity/Tuner/Motor at INFN. Cavity/Tuner/Motor transport to CEA Availability of INFN RF group in supporting preparation, installation and cold measurement is ensured Details of schedule to be finalized at INFN-MI during meeting with CERN/CEA 15-16/2 Mainly to agree on list of preparation activities, and sharing of work P.Pierini, INFN

Likely choice for high energy part of HPSPL 1 klystron per cavity: individual control possible without RF vector modulator Disadvantage: Many klystrons required Advantage: Easiest for control, considered adopted solution for low energy part In this case and all following cases we assume individual Lorentz-force detuning compensation with a fixed pulse on the piezo or an adaptive feedforward (pulse-to-pulse)

Possible layout for the initial high energy part of LPSPL Vector modulator Vector modulator Vector SUM Klystron Feedback optional RF vector modulator This case was analyzed, see O. Piquet, CEA Saclay, simulation, LLRF09 workshop

Lorentz Force Detuning (2) This case (O. Piquet, CEA Saclay, simulation) time offset 1 ms, i.e. 0  1 ms on left hand side graph detuning negative ! considerable spread from cavity to cavity to be expected ! slope determined by time constant of model stop of RF pulse

Two cavities per klystron high energy part of LPSPL O. Piquet, CEA Saclay, simulation, LLRF09 workshop 10% variation in Lorentz Force detuning K L,1 =-2.0 Hz/(MV/m) 2 K L,2 =-2.2 Hz/(MV/m) 2 PI FB controller 5  s delay in FB loop loop closed at start of beam pulse vector sum

Progress work package 7.2 (1) Tuner characterization has been re-scheduled during last annual meeting characterization of CEA Saclay tuning system close to completion characterization of INFN blade tuner and cavity assembly planned for mid February (warm measurements) at INFN  Report for milestone INFN cavity will be transported to CEA Saclay for cold testing at Saclay (vertical cryostat) integration into the “cryholab” for full power tests with nominal coupling and CEA developed couplers will follow, detailed schedule for INFN cavity to be negotiated during February 2010 meeting at INFN ( ) Risk: additional cleaning necessary to reach nominal field for INFN cavity Testing of CEA Saclay cavity in cryholab continues until completed and INFN cavity ready for power tests at Saclay

Progress work package 7.2 (2) RF layouts have been presented at the SPL collaboration meeting in November 2009 at CERN, backed up by simulations; optioned narrowed down to 1 klystron / power amplifier per cavity for the low energy part (low b cavities) 1 klystron per 1, 2 or 4 cavities investigated for the high energy part Power requirements estimated for the 1 and 2 cavity per klystron case  1.5 MW to 1.6 MW power from klystron needed Simulation model being extended to cover learning algorithm for control of the piezo Practical experience gained with Lorentz force detuning compensation will be incorporated into the simulation, with the aim to limit the required RF power.  Choices for RF system layout made, report to be produced (7.2.2), request to re-schedule this milestone as it is late, new date: end June 2010

Progress work package 7.2 (3) LLRF system development started jointly with CEA CERN prototype system for Lorentz force detuning measurement implemented and used in the test stand at Saclay on the CEA cavity, next step: hardware modification to control the piezo tuner with this electronics CEA developed phase feed forward and feedback to keep phase of klystron output constant; analog amplitude loop used, consolidation of these loops into a (I,Q) klystron polar loop being considered for the final demonstrator CW measurements necessary for calibration purposes (de-tuning calculation), difficult as only a relatively low power (200 W usable) solid state amplifier is available; possible solutions: make Saclay IOT operational; use more sensitive pre-amplifiers for weak cavity antenna signal; more sensitivity is also required to fully record the cavity field decay between pulses at the nominal 50 Hz rate Implementation of cavity feedback / feed forward after successful control of piezo by CERN electronics Prototype electronics must be ready by end of August 2010 (M30, 7.2.3) followed by 6 months to consolidate and validate (M36, 7.2.4)