WP1 – Management & Knowledge Dissemination WP1 – Management & Knowledge Dissemination 1)Aims 2)Organisation 3)Plans.

Slides:



Advertisements
Similar presentations
19/02/ Cyclades Kick Off Meeting What a European Co-ordinator expects from his partners and what a European Consortium expects from his Co-ordinator.
Advertisements

Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
TENCompetence Management Issues: WP1 Eric Kluijfhout.
EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
Proposed Ontario Agency for Health Protection and Promotion Update on Agency Implementation Presentation for: Ontario Society of Nutrition Professionals.
High level expert meeting to develop the Near East Regional Action Plan to Implement the Global Strategy to improve Agricultural and Rural Statistics.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
UPP - Understanding Privatization Policy Management and organizational issues Luca Farinola 24/02/2006.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
The evaluation of research units at HCERES
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
1 Framework Programme 7 Guide for Applicants
Report of the Special Committee on the Logical Framework, Governance and Funding Shaida Badiee, Development Data Group, World Bank Paris, June 2, 2010.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
WP1Transnational project and financial management Establishment-Operation of the Project Management and Implementation Instruments Region of Peloponnese.
EPOCA – 11. June EPOCAConsortiumOrganisation.
EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
On the organization and conduct of expert examination in science and technology in the USA and the European Union Scientific Research.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator GRNET NA1: Project Administrative and Technical Management PSC07 Meeting, Zabljak,
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
1 National R&I Programme Auditing Procedure National Funding Unit 2013.
Evaluation Capacity building in Lithuania Presentation for Presentation for Evaluation Units Open days by Mrs. Ana Stankaitienė EU Programmes Management.
Genova 3-4/11/2011 DoCuP Presentation 1 Dissemination In order to assure the best information on the activities and the best dissemination of the results.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
A A R H U S U N I V E R S I T E T Det Jordbrugsvidenskabelige Fakultet The Danish Bibliometric Research Indicator Per Kudsk Dept. of Integrated Pest Management.
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
African Centre for Statistics United Nations Economic Commission for Africa Proposed Framework for Monitoring, Evaluation and Reporting Negussie Gorfe.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
1 st M&E Network Forum 7-8 November 2011 Crowne Plaza Manila Galleria, Ortigas Avenue, Quezon City.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Corporate social Responsabilty (a French example) Non Profit Europe Meeting in Gdansk (May 2012)
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
Under construction SPANISH PRESIDENCY OF THE EU 2010 FRAMEWORK CONDITIONS ROADMAP 4-May-2010.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
European Commission Virtual Institutes Workshop--28 September Thematic network contracts Megan Richards DG RTD Virtual Institutes  Thematic Network.
BHL-Europe Biodiversity Heritage Library for Europe – ECP-2008-DILI – Kick-off meeting – Berlin – May 2009www.biodiversitylibrary.org Biodiversity.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Project title Food Safety - Forming a European platform for protecting consumers against health risks Project coordinator Oddur Mar Gunnarsson Nordic Innovation.
WP6 – Monitoring and Evaluation GA Meeting 21/22 January 2016 Partners: UK and Canada.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
AMICI WP1 – Management, coordination and dissemination
ARIES Industrial and Societal Applications Network
Structural Funds Financial Management and Control, Romania
Saleh Al-Jufout/Tafila Technical University
Annual Report Instructions
Preparing for EGEE-III
SKADS Controller’s Meeting Timeline Annual Financial Report
EU Reference Centres for Animal Welfare
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Standard Setting – Input to Benchmarking
A High Intensity Neutrino Oscillation Facility in Europe
Project Integration Management
Project Integration Management
Presentation transcript:

WP1 – Management & Knowledge Dissemination WP1 – Management & Knowledge Dissemination 1)Aims 2)Organisation 3)Plans

Aims Aims Three jobs: Management of DS Dissemination of information Comparison between facilities Carried out by 3 bodies: GB + MB + CB DB + members of EURO Experts led by Carlo Wyss (input from WPM, MB, etc)

Tasks Tasks Coordination task: coordination of the contractual, financial and administrative aspects of the Design Study, including delivery of annual reports and control of the funds. Oversight task: oversight of the technical and scientific aspects of the Design Study, including the monitoring of milestones and ensuring that deliverables are produced on time. Knowledge task: management of the knowledge generated by the Design Study, including its protection, use and dissemination. Comparison task: comparison between the three facilities, based on their physics reach and cost, taking into account the knowledge of the neutrino oscillation parameters available at that time. Determination of the criteria to be used. Production of a priority list, based on this comparison.

Dissemination Dissemination All publications (internal & external) on website All external publications refereed: journals – DB member + consortium expert proceedings – expert Referees responsible for getting comments Making sure theyre implemented Reporting to DB DB authorisation required before publication

Comparison Comparison Needs to be independent: Carlo Wyss identified as chair Other experts to be identified Use IAP Exact mode of operation still to be defined Will use performance from machine design performance of detectors physics reach Output: Comparison Recommendations for next step(s)

Planning Planning ActionDone by Create websiteM1 Create IAPM1 Create DBM1 Find other external expertsM3 Define how comparison should be madeM6 Report of 1 st year activitiesM12 Define criteria for comparisonM18 Interim reportM24 Project review documentationM36 Comparison between facilitiesM46 Final reportM48