AIP-6 Kickoff: Water SBA Breakout March 28–29, 2013 NOAA, Silver Spring, MD David Arctur University of Texas at Austin.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Water/Drought Scenario 5 Feb 2008 David Arctur OGC Interoperability Institute
Advertisements

GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
Successful Implementations for SBAs using GEOSS Interoperability Arrangements George Percivall The Open Geospatial Consortium Jay Pearlman, IEEE Nadine.
Summary Kick-off meeting AIP-6 (March 28-29, NOAA, Washington DC) Slides provided by Bart De Lathouwer Open Geospatial Consortium AIP Lead
SIF Status to ADC Co-Chairs
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
GEOSS Common Infrastructure (GCI)
AIP-6 Water SBA GEOSS Water Services (GWS) Progress Update OGC/WMO Hydrology DWG OGC TC, Frascati Italy 23 September 2013 David Arctur University of Texas.
Digital Earth Communities GEOSS Interoperability for Weather Ocean and Water GEOSS Common Infrastructure Evolution Roberto Cossu ESA
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
GEOSS Water Services for Data and Maps Community Recommendations David K. Arctur, Project Lead, GEOSS AIP-6 Water SBA University.
AIP-6 Water SBA GEOSS Water Services (GWS) Introduction AIP-6 Kickoff, Silver Spring MD, USA March 2013 David Arctur David Maidment University of.
Integrating NOAA’s Unified Access Framework in GEOSS: Making Earth Observation data easier to access and use Matt Austin NOAA Technology Planning and Integration.
Multidisciplinary interoperability To build Operating Capacity Initial (IOC): extend current GEO IP3/AIP-2 interoperability systems in Forest, Biodiversity,
The GEO Web Portal New Interface Guido Colangeli.
Task WA-01 GEO Work Plan Symposium 2014 Managing and Sharing Data WA-01 R. Lawford and M. Schlummer based on contributions from D. Arctur, D. Maidment,
ESIP Air Quality Workgroup and the GEO Air Quality Community of Practice collaboratively building an air quality community network for finding, accessing,
A Global Agriculture Drought Monitoring and Forecasting System (GADMFS) Meixia Deng and Liping Di.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
GEOSS Water Services Showcase Demos 2, 3, 4 AIP-6 Water SBA Team Proposals 17 May 2013.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
GEOSS Community Portal Recommendations GEO IIB Meeting, Frascati, Italy February 23-25, 2015 Ken McDonald/NOAA
Global Earth Observing System-of- Systems (GEOSS) Architectural Framework Doug Nebert FGDC, U.S. Geological Survey February 2008.
AIP-6 Agriculture/Disaster Management SBA Eugene Yu and Joan Masó.
Vision and architecture of GEOSS Information System GEOSS Design and Evolution George Percivall The Open Geospatial Consortium (OGC) GEO Task IN-05 coordinator.
Task IN-05 GEO Work Plan Symposium 2014 IIB AIP-7 (May 1 st ) Reporting: Bart De Lathouwer (OGC)
© GEO Secretariat Global Datasets (GEOSS task DA-09-03) 3rd GEO European Project Workshop 8-9 October 2009 Istanbul Douglas Cripe, GEO Secretariat.
GEOSS Architecture Implementation Pilot AIP February 2011 GeoViQua First Workshop George Percivall Open Geospatial Consortium Task Lead AR-09-01B - AIP.
Digital Earth Communities GEOSS Interoperability for Weather Ocean and Water GEOSS Common Infrastructure Evolution Roberto Cossu ESA
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ENV proposal meeting, Geneva, Sep. 24, GCI Presentation Joost van Bemmelen, ESA
GEOSS Common Infrastructure (GCI) – Here and Now (Okay a Peek at the Future) IIB Meeting at ESA-ESRIN Barbara Ryan Director, GEO Secretariat Frascati,
GEOSS Architecture Implementation Pilot, Phase 3 - AIP-3 Initial Concepts - Hervé Caumont George Percivall Open Geospatial Consortium GEO Task AR-09-01b.
GEOSS AIP-5 Architecture Implementation Pilot, Phase 5 - Disasters Management Session- Hervé Caumont - Session Lead - OGC IP Team AIP-5 Kick-off Meeting,
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
AIP-8 All Hands AIP-8 AIP-8 Kick-off. Preparing for AIP-8 Lessons learned from AIP-7 In short: –AIP-8 will be more focussed on technical details than.
AIP-7 Results to the IIB Feb. Architecture Implementation Pilot What is the Architecture Implementation Pilot (AIP) –Pilots future components.
EarthCube Building Block for Integrating Discrete and Continuous Data (DisConBB) David Maidment, University of Texas at Austin (Lead PI) Alva Couch, Tufts.
GEOSS AIP-2 Overview AIP-2 Societal Benefit Area Working Groups: Air Quality & Health Disaster Response Biodiversity and Climate Renewable Energy Air Quality.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall September 2008.
WGISS-40, Harwell, Oxfordshire, UK, Sept. 28-Oct. 2, 2015 GEO/CWIC Interactions Ken McDonald/NOAA CWIC Session, WGISS–40 October 1, 2015.
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
GEO 2014 Work Plan Symposium Opening Remarks Barbara J. Ryan Director, GEO Secretariat Geneva, Switzerland 28 April 2014.
GEOSS Community Portal Recommendations Report to the IIB.
The GEOSS Portfolio for Science and Technology Produced by ST (PoC: Hans-Peter Plag,
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
® © 2010 Open Geospatial Consortium, Inc. Use Cases for Geospatial Interoperability Presented to ICAN-Great Lakes Workshop on Coastal Web Atlas Madison.
GCI Overview Steve Browdy with input from Doug Nebert May 2012.
GEOSS Common Infrastructure (GCI) The GEOSS Common Infrastructure allows Earth Observations users to search, access and use the data, information, tools.
GEOSS Architecture Implementation Pilot AIP-3 Engineering Use Cases Nadine Alameh & Josh Lieberman AIP-3 kickoff Frascati, Italy March
GCI Architecture GEOSS Information System Meeting 20 September 2013, ESA/ESRIN (Frascati, Italy) M.Albani (ESA), D.Nebert (USGS/FGDC), S.Nativi (CNR)
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
Gregory W. Withee USGEO Task Group Co-chair September 21, 2007 Gregory W. Withee USGEO Task Group Co-chair September 21, 2007 GEOSS and Fourth Earth Observation.
ESA-FAO GEOPortal STATUS & PLANS
NextGEOSS data hub incl. alpha release
The Group on Earth Observation The water related activities Vanessa Aellen Technical Expert for Water 16 may 2017, Tuscaloosa.
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
GEO-CRADLE: Fostering regional cooperation and roadmap for GEO and Copernicus implementation in North Africa, Middle East and Balkans Funded under H2020.
George Percivall September 2008
Session 7: Wrap-up and Planning
Use Case: The GEO-Wetlands Community Portal
AIP-5 Kick-off Workshop Summary 3-4 May 2012, UNEP, Geneva
GEOSS Future Products Workshop March 26-28, 2013 NOAA
AIP-6 Water Services CEOS Water Portal integrating with GEO DAB
Presentation transcript:

AIP-6 Kickoff: Water SBA Breakout March 28–29, 2013 NOAA, Silver Spring, MD David Arctur University of Texas at Austin

Water SBA Breakout – Attendees GWS – D. Arctur, A. Couch, J. Nelson, B. Teng, M. Hertzfeld CNR/MEDINA – S. Nativi, M. Santoro GeoViQua – J. Maso GMU – Genong “Eugene” Yu CITI-SENSE – ?? Esri – Dan Zimble GLOS – not at kickoff, but would be member

Water SBA Breakout – General Discussion 1 Mature AIP-5 –GWS: improve GCI integration with water service portals –Esri, CNR: Test interoperability of GEO DAB, ArcGIS Online, and other portals –GeoViQua: Improve user feedback system –GMU: improve drought monitoring User Requirements –GWS: gather hydrology community req’ts, apply to portal GUI design –GeoViQua: improve the capture and application of user feedback Use of GCI: New elements, alterations –GWS: make a catalog federation framework with DAB –GWS: simplify registration and discovery processes –GWS: externalize controlled vocabulary server and promote a standard internationalization SKOS server

Water SBA Breakout – General Discussion 2 Ministerial Summit demo proposals –Drought scenario –Flood scenario –Biodiversity & human interaction scenario –Crowdsourcing for air quality/health info Data Sharing (authentication, licensing, etc) –CUAHSI will host an authentication broker that other GWS partners can use easily, and that interfaces well with GCI –Esri will improve ArcGIS Online capability to work with GCI, brokers, and authentication More in-situ observations –GWS, CITI-SENSE, MEDINA, GeoViQua Involvement of Developing Countries / Capacity Building –GWS, MEDINA

Water SBA Breakout – Scenarios Overall: Water SBA teams are providing data and model results that could be valuable to Disaster Management SBA teams and products GEOSS Water Services –Flood & drought real-time monitoring, prediction –Catchment or other aggregations of sensors & time series GMU –Flooding occurrence and duration; crop loss assessment; insurance rates –Drought monitor CITI-SENSE –Crowd-source; air quality reporting; in situ observations MEDINA –Posidonia oceanica algae (seagrass) infestation forecast model –Bio / chem / physical inputs –Societal benefits: prediction of seagrass infestation on beaches; hypoxia potential; fisheries impacts GeoViQua / MEDINA –Agriculture and biodiversity / ecosystem sustainability

Water SBA Breakout – Coordination Biweekly telecons of all water projects –Coordinate use cases, inputs, outputs –(doodle poll to pick weekday and time) GeoViQua twiki registration AIP_Water list registration (important!) AIP_Plenary list registration (important!)

Define Success (Conclusions) How will we know when we’re done? –We can search GEOSS for time series of soil moisture, precipitation, stream flow and get a federated map of the results