Internet, T-PARC Operations Center NPS, Monterey CA Ops. Coordination Science Team Facility Status In-field Analysis Forecast/Nowcast Data Ingest T-PARC.

Slides:



Advertisements
Similar presentations
TOPIC 3 CHAIR REPORT TROPICAL CYCLONE MOTION Russell L. Elsberry OUTLINE Need to improve track prediction –Importance of track forecast Opportunities to.
Advertisements

3rd THORPEX International Science Symposium, Monterey, USA, 14 Sept Overview of T-PARC Falcon operations and ECMWF data denial experiments Martin.
NASA Global Hawk Aircraft Status, Integration, Op’s, Schedule 8May’12 Hurricane and Severe Storm Sentinel (HS3) Science Campaign 2012.
Upgraded Russian Radiosonde Network for IPY U.S. (NOAA) Winter NOAA G-4 and Air Force C-130s JapanPalau Typhoon Landfall EU, US, Japan, Korea, Canada [DLR.
Tropical Cyclone Structure I: Tropical Cyclone Formation II: Tropical Cyclone Intensification III: Tropical Cyclone Structure Change Acknowledgments:
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
Marine Meteorology 1 Ronald J. Ferek, Ph.D. Marine Meteorology Program March 5, 2013 Tropical Cyclone Research Sponsored by the Office of Naval Research.
NOAC Yokosuka, Japan LT William Girdler Operations Officer.
Support Considerations for the Houston Environmental Aerosol Thunderstorm (HEAT) Project Richard Dirks, Jim Moore, Steve Williams UCAR/Joint Office for.
Operations Section.
INTERNATIONAL H 2 O PROJECT (IHOP_2002) FLIGHT PLANNING PLAYBOOK.
T-PARC Operations Meeting Tsukuba, Japan, April 7-8, 2008 Chun-Chieh Wu Department of Atmospheric Sciences National Taiwan University Recommendation from.
Operations center, NPS, Monterey, CA Driftsonde center, Driftsonde Balloon release, Hawaii Aircraft locations, and aircraft operations centers Guam Japan.
RAINEX Real time Communications Overview NCAR, NOAA, Rest of the World Operational Products Satellite Imagery Model Products Surface Observations RECON.
T-PARC (Summer Phase) Sharanya J. Majumdar (RSMAS/U. Miami) Christopher S. Velden (CIMSS / U. Wisconsin) Section 4.7, THORPEX/DAOS WG Fourth Meeting
Overview of integrated science goals, flight planning, and formation flying Brian Toon.
IS-700.A: National Incident Management System, An Introduction
Lidar Remote Sensing for Environmental Monitoring IX
Upgraded Russian Radiosonde Network for IPY U.S. (NOAA) Winter NOAA G-4 and Air Force C-130s JapanPalau Typhoon Landfall EU, US, Japan, Korea, Canada [DLR.
Field Project Planning, Operations and Data Services Jim Moore, EOL Field Project Services (FPS) Mike Daniels, EOL Computing, Data and Software (CDS) Facility.
VAMOS PROGRAMS PROJECT OFFICE C. B. Emmanuel, Director José Meitín, Deputy Director C. B.
TROPICAL CYCLONE STRUCTURE (TCS08) FIELD EXPERIMENT IN THE WESTERN NORTH PACIFIC DURING 2008 Russell L. Elsberry (Naval Postgraduate School) Ronald J.
BAMEX Operations Center Functions Daily Planning Meeting Facility Status Forecasting Nowcasting Field Catalog Research Flight Planning Operations Coordination.
NSF Hurricane Research National Science Foundation Pamela Stephens Geosciences Directorate.
EOL’s Capability and Technical Development In RAINEX Wen-Chau Lee NCAR/EOL 15 Nov. 2004
THORPEX Pacific Asian Regional Campaign and Tropical Cyclone Structure-08 Toward Better Understanding of Typhoon Life Cycle T. Nakazawa 1 P. Harr 2, S.
VOCALS Operations Coordination José Meitín VOCALS Project Office and EOL Field Project Services
Targeted Observations for Improving Tropical Cyclone Predictability – DOTSTAR, TH08, TCS-08, and T-PARC Chun-Chieh Wu Acknowledging collaborators in DOTSTAR.
30 November December International Workshop on Advancement of Typhoon Track Forecast Technique 11 Observing system experiments using the operational.
Boundary-layer Pressurised Balloons & Driftsondes Status of implementation on April 1 st 2006.
T-PARC Operations Plan Outline Chapter 1. T-PARC Overview Chapter 2 Scientific Mission Planning Organization and Intensive Observing Period Definition.
Pre-Genesis Monitoring of the 3-D Atmospheric and Oceanic Environment Via High Altitude Aircraft Observations Jeff Hawkins 1, Peter Black 2, Pat Harr 3,
Strategic Plan for Korean Participation in T-PARC 2008 Hee-Sang Lee Forecast Research Lab., NIMR/ KMA April. 7-8, 2008 Tsukuba, Japan.
START-08/pre-HIPPO FIELD CATALOG AND DATA MANAGEMENT Steve Williams NCAR Earth Observing Laboratory (EOL) Boulder, Colorado START-08/pre-HIPPO Planning.
Upgraded Russian Radiosonde Network for IPY U.S. (NOAA) Winter NOAA G-4 and Air Force C-130s JapanPalau Typhoon Landfall U.S.(NSF/ONR), EU, Japan, Korea,
Case of June , Dropsonde Jet Lear Jet: (model 35A?) Ceiling: ~ 43,000 Feet (roughly 30 min to 37,000 ft.) Duration: 6 hours; option to refuel.
Falcon coordinator: Martin Weissmann Aircraft manager: Andrea Hausold Falcon Steering Committee (SC): M. Weissmann, P. Harr, T. Nakazawa, S. Jones, H.-S.
NORTH AMERICAN MONSOON EXPERIMENT (NAME) An internationally coordinated, joint US-Mexico process study aimed at improving warm season precipitation prediction.
1 Rolf Langland NRL-Monterey Plans for Evaluation of Lidar Wind Observations at NRL-Monterey Working Group on Space-Based Lidar Winds 05 Feb 2008.
Institut für Physik der Atmosphäre DLR Contribution to the THORPEX Pacific Asian Regional Campaign T-PARC O. Reitebuch, M. Weissmann DLR Oberpaffenhofen.
Upgraded Russian Radiosonde Network for IPY U.S. (NOAA) Winter NOAA G-4 and Air Force C-130s JapanPalau Typhoon Landfall EU, US, Japan, Korea, Canada [DLR.
August 2001 Meeting Action Items: Status of unknown Facilities: –Long EZ (Dobosy) – will not participate –XPol (Anagnostou) together with 2D video disdrometer.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 Air Force Director of Weather 1 March 2010 USAF Tropical Cyclone.
NAME 2004 Field Operations and Procedures NAME Special Session Field Operations Center Concept: Define requirements for, and conduct the day-to-day operations,
T-PARC Operations Support Dick Dirks Jim Moore National Center for Atmospheric Research T-PARC Operations Meeting Tsukuba, Japan 7-8 April 2008.
Munehiko Yamaguchi, Sharanya J. Majumdar (RSMAS/U. Miami) and multiple collaborators 3 rd THORPEX International Science Symposium 14 Sep Coordinated.
Tropical Cyclone Structure I: Tropical Cyclone Formation II: Tropical Cyclone Intensification III: Tropical Cyclone Structure Change Acknowledgments:
F l y - F i g h t - W i n HQ United States Air Forces Director AF Weather 3 Mar 08 USAF Tropical Cyclone Support.
AMS Annual Meeting - January NRL Global Model Adaptive Observing During TPARC/TCS-08 Carolyn Reynolds Naval Research Laboratory, Monterey, CA OUTLINE:
Communications Plan: Ji Young Kim, Chul Han Song, Saewung Kim, and Jim Crawford.
A Proposed New Strategy for Tropical Cyclone Reconnaissance Based on Western Pacific TCS08 Proof of Concept Peter G. Black (1), Jeffrey D. Hawkins (2)
Japan, Atsugi, NAF Okinawa, Kadena AFB T-PARC/TCS-08 Components Guam, Andersen AFB ET characteristics, forcing of downstream impacts, tropical/midlatitude.
PLANS FOR NAME FOC - TUCSON Bob Maddox - Univ of AZ With inputs from: Erik Pytlak - NWS TUS Art Douglas - Creighton Univ.
2015 HS3 Science Team Meeting Ames Research Center, Moffett Field, CA.
T-PARC2008 Operation Plan of JMA 1Overview of T-PARC2008 activities in JMA 2Outline of Special Observation 3Routine Observation and Special Observation.
UCAR Office of Programs University Corporation for Atmospheric Research Overview of NAME Field Catalog NAME Special Session José Meitín NAME Project Office.
THORPEX A Global Atmospheric Research Program Pai-Yei Whung Acting Director THORPEX International Program Office NWS/NCEP, August
RICO DATA MANAGEMENT Steve Williams and Scot Loehrer UCAR/Joint Office for Science Support (JOSS) Boulder, Colorado RICO Workshop Boulder, CO February.
JOINT TYPHOON WARNING CENTER 2007 YEAR IN REVIEW Lt Col Bob Falvey Director, JTWC 62 nd INTERDEPARTMENTAL HURRICANE CONFERENCE 3-7 MARCH 2008 CHARLESTON,
T-PARC/TCS-08 Quicklook 29 October Operations by the numbers… 9 participating nations –Canada, China, England, France, Germany, Japan, South Korea,
Japan, Atsugi, NAF Okinawa, Kadena AFB T-PARC/TCS-08 Components Guam, Andersen AFB ET characteristics, forcing of downstream impacts, tropical/midlatitude.
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS User readiness – Himawari-8 Presented to CGMS-44 Plenary.
Radiosonde Network for IPY
Tropical Cyclone Structure-2008 (TCS-08) ONR/NRL Funded Projects
José Meitín Overview of NAME Field Catalog NAME Project Office
TPARC Action Items JMA--
Science Objectives contained in three categories
Status Report of T-PARC/TCS-08
(NRL Base-funded project)
Western North Pacific Tropical Cyclone Formation and Structure Change
Presentation transcript:

Internet, T-PARC Operations Center NPS, Monterey CA Ops. Coordination Science Team Facility Status In-field Analysis Forecast/Nowcast Data Ingest T-PARC Field Catalog Data Collection Facility CoordinationMission Planning ATC/Military Coord. Elluminate Web conferencing T-PARC Communications Overview NRL, JMA, UKMO, ECMWF, NCEP Special model products Targeting products Sensitive areas Ensemble products NCAR Driftsonde (GTS) Coordination Center Boulder, CO Taiwan DOTSTAR (GTS) Dropsonde Operations Japan Coordination Center, JMA DLR Support Model products ATC Coordination Internet Satcom Internet Driftsonde Launch Center Hawaii Launch preparation Specialized Data Products Guam Aircraft Support Base Andersen AFB USAF C-130 Aircraft (GTS) NRL P-3 Aircraft (GTS) ELDORA, Lidar, Dropsondes Data analysis Pre-/post flight briefings ATC Coordination DLR Falcon Aircraft (GTS) Support Base Atsugi NAF, Japan Mission Planning Status Updates Pre-Post flight debrief Flight planning Chat, phone Internet, Satcom Internet JTWC, Hawaii Special forecasting, and alert products Internet Phone SSEC, NRL Special Satellite products Internet Phone Chat Satcom

T-PARC Operations Support Science Leadership Science Steering Committee (SSC) Falcon Steering Committee Science Group (large participant group) Science Director Falcon Expert Teams Mission Planning Team (MPT) Mission Scientist (IOP specific) Mission Support Scientist (Guam, Atsugi) Flight Scientists (on-board each aircraft)

T-PARC Operations Support Science Leadership Science Steering Committee (SSC) Chair: Harr, Co-Chairs: Nakazawa, Weissmann, TCS-08 Rep: Elsberry Korea: Lee, China: Chen, Canada: McTaggart-Cowan, Ex-Officio: Moore, Parsons, Wu, Toth. Falcon Steering Group (Nakazawa, Harr, Weissman ) Science Group (large participant group) Science Director (4 in MOC) Mission Planning Team (MPT) (6) Mission Scientist (IOP specific) (MOC ) Mission Support Scientist (Guam, Atsugi) Flight Scientists (on-board each aircraft)

T-PARC Resources Deployment MOC USAF C-130 NRL P-3 Guam Support 7/25 10/04 7/30 7/25 10/04 9/30 9/30 9/30 7/30 DLR Falcon Driftsonde COAMPS model MTSAT Rapid scan Field Catalog TargetingProducts 8/01 8/019/15 10/04 10/157/15 10/04 7/2010/04 8/0110/04 7/20 NominalT-PARC Field Season 8/26

 Finalize daily mission plan  Select alternate missions  Make key personnel assignments (e.g. flight scientists)  Notification of flight facilities  Notification of project personnel (Daily Ops Summary)  Communicate notification requirements to airspace agencies (advance notification as necessary)  Preparation of flight plans and dropsonde points  Advanced notification to driftsonde and rapid scan satellite programs T-PARC Operations Support Mission Planning

 Status of aircraft and remote observing systems  Data management and communications status report  Forecast discussion from hours, special products; outlook to 72 hours  Report on the status of scientific objectives and results of the last mission and/or update on the status of an on-going mission  Mission Selection, staff assignment, and schedule of operations and advanced notification  Logistics or administrative matters/other items T-PARC Operations Support Daily Planning Meeting The Daily Planning Meeting will be co-chaired by the T-PARC Science Director and Operations Director. The agenda for the meeting will be consistent each day and include the following items:

DPM 23 DSM T/O WC-130J 14 Pre-flight WC-130J Pre-flight P-3 T/O P-3 Initial decision time Initiate flight planning 01 Final Decision time Modify flight plan 01 Start Crew Rest 22 (07) T/O Falcon Pre-flight Falcon Sample timeline for a three plane mission: WC-130, P-3: TC structure Falcon: Targeting for track Assumptions:Targeting for 0000 UTC Synoptic time TC structure missions desired to be as close to dawn as possible Two-hour transit time to target (WC-130J, P-3) All times are UTC: 0000 UTC = 0900 Japan, 1000 Guam, 1700 Monterey Team 2 Team 1 Daily Planning Schedule (00UTC) Decision Time Frame (Japan LT)

Sample timeline for a three plane mission: WC-130, P-3: TC structure Falcon: Targeting for track Assumptions:Targeting for 0000 UTC Synoptic time TC structure missions desired to be as close to dawn as possible Two-hour transit time to target (WC-130J, P-3) All times are UTC: 0000 UTC = 0900 Japan, 1000 Guam, 1700 Monterey DPM 23 DSM T/O WC-130J 14 Pre-flight WC-130J Pre-flight P-3 T/O P-3 Initial decision time Initiate flight planning 01 Final Decision time Modify flight plan 01 Start Crew Rest 22 T/O Falcon Pre-flight Falcon

DPM UPDATEDPM 23 DSM T/O WC-130J 02 Pre-flight WC-130J 04 Pre-flight P-3 T/O P-3 Initial decision time Initiate flight planning 01 Final Decision time Modify flight plan 13 Start Crew Rest 10 T/O Falcon 08 Pre-flight Falcon Team 1 Team 2 UPDATE 11 UPDATE 11 UPDATE 11 Team 1A Sample timeline for a three plane mission: WC-130, P-3: TC structure Falcon, DOTSTAR: Targeting for track Or: WC-130, P-3, FALCON, ET Structure and Targeting Assumptions:Targeting for 1200 UTC Synoptic time Two-hour transit time to target (WC-130J, P-3) All times are UTC: 0000 UTC = 0900 Japan, 1000 Guam, 1700 Monterey Daily Planning Schedule (12UTC) Decision Time Frame Japan LT

Sample timeline for a three plane mission: WC-130, P-3: TC structure Falcon, DOTSTAR: Targeting for track Or: WC-130, P-3, FALCON, ET Structure and Targeting Assumptions:Targeting for 1200 UTC Synoptic time Two-hour transit time to target (WC-130J, P-3) All times are UTC: 0000 UTC = 0900 Japan, 1000 Guam, 1700 Monterey DPM 23 DSM T/O WC-130J 02 Pre-flight WC-130J Pre-flight P-3 T/O P-3 Initial decision time Initiate flight planning 01 Final Decision time Modify flight plan 13 Start Crew Rest 10 T/O Falcon Pre-flight Falcon UPDATE 11

 An Intensive Observing Period (IOP) is a period of comprehensive airborne observations in the project target area, organized and launched to document the structure and evolution from the Formation through the Extra-tropical Transition (ET) stages of a tropical cyclone. An IOP also occurs if there are special “targeted observations” carried out with aircraft in support of forecasting objectives. T-PARC Operations Support Intensive Observing Period (IOP)

 The main criterion for launching an IOP will be an indication 24 to 48 hour in advance of the conditions noted above that warrant special aircraft measurements with any project aircraft.  IOPs do not have a predetermined length. Weather conditions can last from several hours to several (3-4) days.  Given the importance of transitions from undisturbed to disturbed conditions favoring tropical cyclone development, an attempt will also be made to include transition periods as part of IOPs, based on the available forecasts.

T-PARC Operations Support Intensive Observing Period (IOP)  Special attention will be paid in the mission planning process to effectively use available resources to maximize documentation of each IOP event  Question—Do we define IOPs by phenomena or the start of special observations?  Question—How do we handle simultaneous observations (e.g. TC formation near Guam and targeting near Japan?)

Tropical Cyclone Structure Extratropical Transition Targeting IOP # FormationStructureSatelliteValidation Transfor mation Re- Intensific ation Formation Recurva ture Non-TC targeting 1XXX 2AXX 2B USAF 10.5 NRL drops USAF drops NRL 8.0 DLR drops DLR 4.0 DLR drops 2C X DLR 4.0 NRL 8.0 C drops XX Proposed T-PARC Resources Scorecard

T-PARC Operations Support Operations Staffing  It is necessary to have two teams of key staff in the MOC to support operations.  Team-1 will be the daily shift of people to handle typical support operations when there are no IOPs planned or underway  Team-2 will be the special shift to support activities during IOPs (or other special periods as required).

T-PARC Operations Support Operations Staffing  Team-1 (Daily Planning)  Science Director  Operations Director  Facility Status Coordinator  Lead Weather Forecaster  Forecast support staff (2-3 people)  Communications Specialist  Team-2 (during IOP)  Mission Scientist  Operations Director-2  Aircraft Coordinator  Sounding Coordinator  Lead Nowcaster  Forecast support staff  Communications Specialist

T-PARC Operations Support Operations Staffing Aircraft Support Center Staff (Guam, Atsugi)  Facility Manager and Center Support Coordinator  Mission Support Scientist  Data Manager Driftsonde Coordination Center Staff  Driftsonde Scientist  Communications Coordinator

T-PARC Aircraft Coordination Center at Andersen AFB, Guam

T-PARC Operations Center Operations Center in Monterey in Monterey

Action Items  Staffing key positions for all centers  Added Sections of the Ops Plan –Modeling –Aircraft program –Data Management –Sounding Systems  Clear picture of airspace and flight operations capabilities  Documentation and clearances for personnel  Aircraft scientific crew training