RDR Report Writing Nan Phinney SLAC for RDR team of editors.

Slides:



Advertisements
Similar presentations
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Advertisements

6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
20-Nov-06 FALC - KEK Global Design Effort 1 GDE Report Barry Barish Caltech / GDE 20-Nov-06 RDR Design Freeze.
13-Feb-06 RDR: Goals and Scope Barry Barish Fermilab RDR Meeting 13-Feb-06 ILC Design/Cost WBS.
11-Nov-06 ILCSC - Valencia Global Design Effort 1 GDE Report and Discussion of Costs Barry Barish Caltech / GDE 6-Nov-06.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 Status of SB2009 Rebaselining Proposal Document, Known to the Editor As of vers.A N.Toge Check:
The RDR Report Odyssey Nan Phinney SLAC for N^3 team of editors.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Operations, Test facilities, CF&S Tom Himel SLAC.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
John Carwardine 22 June 2012 TEB webex meeting. Agenda Management items (John) –General updates, status of submissions –Principle Editor assignments for.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
June 13, 2007 Global Design Effort 1 ILC Effort at SLAC RDR > EDR Nan Phinney SLAC/GDE.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Conventional Facilities and Siting Global Group (ARCFS)
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Yamamoto WG3: ML-SCRF Parallel Session,
Technical Design Report preparation
The DBD: Outline and Scope
ILC Global Design Effort
ILC Cryogenics -- Technical Design Report Planning
ILC - Global Design Effort
Presentation transcript:

RDR Report Writing Nan Phinney SLAC for RDR team of editors

11/10/06 ECFA/GDE 06 Global Design Effort 2 ILC Documents Brochure – non-technical audiences, ready now “Quantum Universe” level booklet ~30 pages Executive Summary ~ 30 pages Physics motivation, accelerator and detectors RDR Report ~ 300 pages high level description of the accelerator DCR Report ~ 250 pages physics and detectors RDR Editors: Nan Phinney (SLAC), Nobu Toge (KEK), Nick Walker (DESY)

11/10/06 ECFA/GDE 06 Global Design Effort 3 RDR Report RDR is a high level description of the accelerator, CFS, sites and costs similar to 2001 Tesla TDR or 2003 GLC Report A snapshot of what we propose to build not a history of R&D, design evolution, and alternatives Original schedule was complete draft now, but has been pushed back because of cost iterations We have in hand a working outline for the RDR and outlines or drafts of many sections

11/10/06 ECFA/GDE 06 Global Design Effort 4 Draft Outline (1) I) RDR Introduction RDR Org and process (Walker) 5 pages II) Accelerator Design 1.ILC Parameters (Yokoya)5 pages 2.Electron Source (Brachmann)10 pages  3.Positron Source (Bharadwaj)15 pages  4.Damping Rings (Gao)20 pages  5.RTML (Tenenbaum)10 pages  6.Main Linacs (Adolphsen)20 pages 7.Beam Delivery (Seryi)20 pages  8.Beam Dynamics (Schulte) 10 pages  9.Operations and Availability (Himel)15 pages 

11/10/06 ECFA/GDE 06 Global Design Effort 5 Draft Outline (2) III) Technical and Global Systems 1.Magnets (Tartaglia)5 pages  2.Vacuum (Noonan)5 pages  3.Modulator (Larsen) 5 pages  4.Klystron (Larsen)5 pages  5.Power distribution (Larsen)5 pages  6.Cavities (Mammosser)10 pages 7.Cryomodules (Carter)10 pages 8.Cryogenics (Peterson) 10 pages  9.LLRF (Simrock)5 pages  10.Control & Timing Systems(Carwardine) 15 pages  11.Instrumentation (Burrows)10 pages 12.Dumps and Collimators (Markiewicz)5 pages

11/10/06 ECFA/GDE 06 Global Design Effort 6 Draft Outline (3) IV) Conventional facilities 1.Introduction5 pages 2.Site layout10 pages 3.Tunnel layout5 pages 4.AC Power distribution3 pages 5.Cooling water and Air conditioning3 pages 6.Safety systems3 pages 7.Metrology and Alignment5 pages 8.Construction plan and installation5 pages V) Sample Sites 1.Americas (Kuchler) 5 pages 2.Asia (Enomoto) 5 pages 3.Europe – Germany (Baldy) 5 pages 4.Europe – Switzerland (Baldy) 5 pages

11/10/06 ECFA/GDE 06 Global Design Effort 7 Draft Outline (4) VI) Cost 20 pages 1.Introduction – Methods and Assumptions 2.Overview 3.Accelerator 4.Conventional Facilities 5.Construction Cost Summary 6.Operating Costs VII) EDR R&D Plan 20 pages 1.Overview (Foster) 2.R&D issues (RDB)

11/10/06 ECFA/GDE 06 Global Design Effort 8 Accelerator Design Section Overview – high level requirements Key Parameter table System description Layout schematic Subsystem 1 include graphics or tables as needed Subsystem 2, etc. Optics and accelerator physics issues Technical systems issues mention any interesting technical components Tables summarizing components, lengths magnets, diagnostics, rf, etc.

11/10/06 ECFA/GDE 06 Global Design Effort 9 RTML Section

11/10/06 ECFA/GDE 06 Global Design Effort 10 RTML Section 2

11/10/06 ECFA/GDE 06 Global Design Effort 11 RTML Section 3

11/10/06 ECFA/GDE 06 Global Design Effort 12 Technical Section Overview - High level description of components Technical Issues Major classes considered, issues, how evaluated Special challenges, solutions Cost Estimation with Table of components Example: Vacuum >100 km of beamlines under vacuum, mostly conventional issues – Cryomodules, electron & positron source, DR, … how issues were addressed in design approach used to develop costs not a catalog of every system but a discussion of issues and solutions

11/10/06 ECFA/GDE 06 Global Design Effort 13 Vacuum Section

11/10/06 ECFA/GDE 06 Global Design Effort 14 Vacuum Section 2

11/10/06 ECFA/GDE 06 Global Design Effort 15 Vacuum Section 3

11/10/06 ECFA/GDE 06 Global Design Effort 16 CFS, Sites, Costs CFS High level description of design Leave technical details for ILC notes, wiki Sites Description of site, unique features, constraints Costs Description of approach, assumptions, guidelines Technical system approaches EDR R&D Plan Roadmap to EDR, description of R&D needed

11/10/06 ECFA/GDE 06 Global Design Effort 17 Plans until Beijing (Feb. '07) NovemberDecemberJanuaryFebruary Valencia Further cost consolidation CCR preparation & submission Cost & Design Freeze 30/11 Prepare for Full Cost Review SLAC Cost Review 14-16/12 MAC 10-12/01/07 Final cost corrections and documentation Agency cost briefings Beijing: RDR draft published RDR final editing RDR prepare 1 st drafts

11/10/06 ECFA/GDE 06 Global Design Effort 18 New RDR Schedule Now: Document and most section outlines in hand, editors to iterate content with section authors mid-Dec: 1 st drafts of Executive Summary and all area, technical, CFS and cost sections early Jan: Complete draft for review by ILC MAC and discussions with funding agencies Feb:Draft available in PDF and on web, pending final revisions before publication Summer 07:Published version

11/10/06 ECFA/GDE 06 Global Design Effort 19 Logistics RDR Wiki site to be created this week with Outline, templates, examples, areas for each section Password protected with access for RDR_Leaders and additional authors as needed Given the tight schedule, we plan to assemble the final document in Latex (like the DCR) Authors submit text and figures in either Word or Latex and iterate text with editors, with interim versions viewable in PDF Conversion to Latex (+ PDF) only when nearly final

11/10/06 ECFA/GDE 06 Global Design Effort 20 Final Comments We have a lot to do in a very short time We need to ask for your full cooperation (and forgiveness) Your RDR Editorial team N^3