Engineer Training Pneumatic System Overview. Engineer Training Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:  Y Pistons.

Slides:



Advertisements
Similar presentations
USER MAINTENANCE.
Advertisements

Engineer Training XL1200 Safety System. Engineer Training XL1200 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Dennis Fire Appliances Operations & use. PTO Step 1 Move slide cover towards the drivers seat to lock out the gearbox Step 2 Select drive on the gear.
Engineer Training XL1200 Pneumatics. Engineer Training XL1200 Pneumatics Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:
Operation of One Speed Control valve. Transmission control valve N-range operation Transmission Control valve.
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
Engineer Training XL1200 Electronics. Engineer Training XL1200 Electronics Confidential 2 XL1200 Electronics The XL Jet Electronic System consists of.
Engineer Training Media Feeder TJ8300 / TJ8500 Media Feeder.
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Using the Avanti Tabletop Centrifuge As demonstrated by Joe Toney.
principle.components.structure.application.circuit.h118/1d
FoamPro 1600 Series Fully automatic Class A foam ONLY
GI/EMME series TRAining CEntre Burner setting. TRAining CEntre Setting sequence: OIL PRESSURE SETTING : Pump and pressure regulator AIR QUANTITY SETTING.
KOSMAK MACHINE ELECTROFOK (MICRO FIBER OPTIC CABLE BLOWING MACHINE WITH ELECTRIC)
Sava air bags. The new equipment Air Bags Kevlar reinforcing w/ thick, multi-layer rubber shell 24” x 24” positive grip surface w/ safety straps Max load:
4Identifying Leakage Source (Mech/ Elec) 4Mechanical Air Leak- Down 4Mechanical Air Leak- Up 4Electronic Drift- Up/ Down 4Load Cell Operation 4Understanding.
Engineer Training Rear Operation Unit TJ8300 / TJ8500 Rear Operation Unit.
SAFETY MEETING Off Highway Trucks. Brakes There are four separate controls used for braking Service Brake Retarder Secondary Brake Parking Brake.
Unwinding module is designed for unwinding of laminate tape, for its steering, for the cutting of the necessary width and for the easy feeding of material.
The Handling Camera1 Trainer Training The Handling Camera.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Mitsubishi RA90 4 axis Wire EDM
Overview The top seal mechanism consists of a foil unwinding and feeding mechanism and a cutting and welding mechanism. It is designed to cut out and weld.
AccuMax Single Point Injection Operation (See Installation and Operation Manual for detailed instructions)
Engineer Training XL1500 Safety System. Engineer Training XL1500 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Engineer Training Troubleshooting TJ8300 / TJ8500 Troubleshooting.
LED Solder Press Final Presentation Final Presentation Senior Projects 2 Senior Projects 2 By Ryan Bigl & By Ryan Bigl & Kyle Levesque Kyle Levesque.
PNEUMATIC SYSTEMS.  The learning objective of this presentation, To develop the student's knowledge of the vacuum system to meet the basic functions.
Actuators.
Pneumatic Logic Sensors and Actuators
Engineer Training Electrical System Overview and Requirements.
Features of CNC Machining Centers
Diesel Engine Starting and Reversing
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
AccuMax Multi-Point Injection Mechanics
Control of Pneumatic Energy
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
Engineer Training Electronic System Overview. Engineer Training XL1500 Electronics Confidential 2 XLjet Electronics The XL1500 Electronic System consists.
Engineer Training Bridge System TJ8300 / TJ8500 Bridge System.
Autoclave Machine.
Trouble shooting Before starting to work on a problem, first we have to understand the problem Once the problem is understood, we will try to “isolate”
Paratech Air Struts SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Settings & Adjustments. Settings & Adjustments.
Unit - #6 Air Brake System
Pneumatic and hydraulic actuation system (cont.)
Oxyacetylene Cutting O.A.C. Pattern Cutter Cutting Torch.
Industrial Electronic Department Copyright of German Malaysian Institute. All rights reserved.
BioRad Sputter Coater  Instructions for gold coating a SEM sample.  NO, it’s not your eyes. This image is out of focus.
TECHNICAL TRAINING SMART COMMANDER System Requirements CPU : 800MHz and aboveCPU : 800MHz and above Memory : 256MB RAM or HigherMemory : 256MB.
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
XAS 375 JD6 Compressors Scott Malm
XAS 375 JD6 Compressors Scott Ellinger
XAS 375 JD6 Compressors Scott Ellinger
4) Design the logic to control the motor on a simple remote control car. There are two buttons on the remote control for the motor. If neither button is.
LCD Wiring Diagram Presentation B / B.
Utility Vehicle Driving Safety. Types of Utility Vehicles Golf Carts Gator Vehicles Toro Vehicles Daihatsu.
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
MACHINE OPERATION.
GC Startup.
Pneumatics Module 9 Time delay valve.
Trainings 10/28 Woooooo!!.
Operation of EASY-CHARGE Electronic Unit
On/Off Control (bang-bang) Proportional Control
Servo Pilot SFP-150 to 1500.
Presentation transcript:

Engineer Training Pneumatic System Overview

Engineer Training Confidential 2 Working Concept Overview: The Pneumatic System is comprised of:  Y Pistons  Z Pistons  Ink Purge  Pneumatic Panel

Engineer Training Confidential 3 Y Pressure Roller Pistons The pistons are controlled by the Pneumatic Panel.  They work with an air pressure of 2.5 bar.  The pressure roller has a total of 3-5 pistons depending on the machine.  The speed of this pistons can be regulated.

Engineer Training Confidential 4 Z Shaft This shaft is controlled by two pistons, which hold the Z rubber Roller.  The Pressure used is 4.5 Bar.  The speed of those pistons can also be controlled, and for safety reasons it should be very slow.  The Off position for this axis, is when the pistons are UP. If there is a loss of pressure, the roller has two springs, which lift or maintain the roller in the upward position.

Engineer Training Confidential 5 Ink Purge We use air pressure of 0.8 bar to clean the heads, and for this reason, there are two air valves for each color. Each air valve controls 4 heads, and the valve splits to two outputs, one for each partition of the secondary tank.

Engineer Training Confidential 6 Pneumatic Panel  This Panel controls the Z pistons and Y pistons. It also regulates and displays the air pressure for the pistons as well as for the Ink Purge.  The Panel is also included in the safety system. If the Emergency Stop is pressed, all air supply to the system will be cut off.

Engineer Training Confidential 7 Pneumatic Panel The Panel is comprised of the following:  On / Off Buttons  3 Valves  2 Filters  2 timers  3 Gauges  Pressure Regulators  Main switch

Engineer Training Confidential 8 ON/OFF Buttons These 4 buttons control the Z and Y pistons in the following way.  On Y: when the Green Button is pressed, the pressure roller will go UP. The green button will light.  On Z: when The Green Button is pressed, the rubber shaft will go down. The green button will light.  Pressing the Red Buttons, will turn OFF each Shaft; Y will go down, Z will go UP. The red Button will Light.

Engineer Training Confidential 9 TIMERS  There are 2 safety timers which control the delay of each shaft before it starts to move. After pressing any button, an alarm will go off, while the delay is present.  You can adjust this delay in the timers, by rotating the little dial in them, and setting the desired number. The units are in seconds, but that can be changed.

Engineer Training Confidential 10 The timer has 4 dip switches. The first 2, define the time range and the last 2 the mode. The Correct setting, should be 1 up, and the rest down, so that the range is in seconds. TIMERS (Cont.)

Engineer Training Confidential 11 Regulators and Filters There are 2 water filters in the panel. The first one on the bottom, filters the whole system from water, and the second one is for the Ink purge, because it is more sensitive. There are 3 regulators, one for each function, Z, Y, and Ink Purge. It adjusts the pressure by turning the black top cap.

Engineer Training Confidential 12 Gauges and Main Air Valve There are three gauges, one for each section. They display the current pressure applied. The first for Ink Purge (0.6bar), the second Y pistons (2.5 Bar) and the third is Z pistons (4.5 Bar). The main Ink Valve, open and closes the entrance of Air to the whole system.

Engineer Training Confidential 13 VALVES There are 3 electronic valves in the panel. One is for the safety system, which cuts off all air entrances if the emergency button is pressed. And the other two are for the Y and Z piston control.

Engineer Training Confidential 14 General Diagram

Engineer Training Confidential 15 System Diagram