News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.

Slides:



Advertisements
Similar presentations
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Advertisements

PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
PCB layout issues PCB alignment and spacing MMM meeting, 22/01/2014G. Sekhniaidze/ J. Wotschack1.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
XML Description of ECAL Geometry  For XML description of ECAL Geometry were used: Det/XmlDDDB/v5, Det/XmlEditor/v4, Det/DetDesk/v6, Vis/GaudiLab/v1r4.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Mass production and mechanical structure P. Pakhlov (ITEP)
M. Bianco On behalf of the ATLAS Collaboration
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
The HCAL barrel absorber structure
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Evgeny Kryshen (PNPI) Mikhail Ryzhinskiy (SPbSPU) Vladimir Nikulin (PNPI) Detailed geometry of MUCH detector in cbmroot Outline Motivation Realistic module.
TOF code status report : raw data data visualization geometry A. De Caro for the TOF group.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Start and Vertex Detector W. Boeglin, A.Klein Current Design: 3300 scintillating fibers 1mm diameter 3 double layers (1 axial, 2 stereo) cylindrical geometry.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN Doro Lehmann has started to update barrel DIRC in CATIA based.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Straw man layout for ATLAS ID for SLHC
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Status of the forward tracker design
Baby-MIND Modules & Services
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
ETD summary D. Breton, S.Luitz, U.Marconi
Hcal Geometry and Assembly
Present Read Out Chain for the PANDA Barrel DIRC
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
cooling and supports of the forward endcap EMC
Future Plan of the Neutral Kaon Spectrometer 2 (NKS2) Experiment
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
IHEP group Shashlyk activity towards TDR
IFR detector mechanics
First of all we will remind some numbers:
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
SIT AND FTD DESIGN FOR ILD
HERD Tracker Layout Considerations
Drawings taken from: L.Bartoszek and C. Daurer
Presentation transcript:

News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov ITEP(Moscow)

Requirements for PANDA Small radius ~ 50 cm Minimal radiation length “Holes” for pellet target About 100 % coverage Strip design modules with plastic covers and chamber fixation

Our old design mm= 426 mm mm = 496 mm As we found out from current design of PANDA barrel 4 mm gap between detectors foreseen (space for service and installation structure + cabling and ect.) About 100% coverage Minimal material budget “Holes” for pellet target – to be done 56 identical modules in total 7 degree shift

Some open questions We have some ideas how to fix strips, but we need to know common support structure for DIRC and TOF From B. Lewandowski : “We have these 16 rectangular forms planned for quartz boxes. … It would be excellent, if you could start a design for the TOF in a way similar to the one for the DIRC quartz boxes, because the material of these two systems have to be as close as possible together to improve the situation for the EMC “. – As you can see TOF is as close to DIRC as possible, we’ll redesign our current drawings to 16 sectors, but we need some time. From C. Schwarz: “Is it possible to have a single layer and optimized housings covering approx. 90% of the geometrical acceptance?” – We can do this, but we have to check if PCB (1.2x1.2 m 2 ) with parameters we need can be produced. In this case design will be very similar to IHEP-Dubna project. Also we need to redesign chamber support and chamber placement (4 rows). We also can design 16 sector segmentation with two layers (strips in each sector fixed together mechanically) feedback from the other subdetectors &subsystems very important!!!!!

We got some information after March meeting(1) Information from BwECAL. Many thank to David Rodríguez Piñeiro for providing very useful information. We’ll keep this in mind Frame for services BwECAL and tracker coupling

We got some information after March meeting(2) Information from DIRC. Many thank to Carsten for providing very fast reply mm = 496 mm mm= 426 mm

Inputs for new design Inner radius – 426 mm (as for old one) Outer radius – 483 mm (one row?) 16 sectors as for the DIRC (!) We try in any case to have geometrical coverage as high as possible We think this is a very good idea, but how we can do this for one layer only? We can fit 4 strips in one gas volume to form sector and save space for at least 2 covers!

We had a very few time due to LHC start again… but we have already new design (not so detailed like old one but with very similar strips)

Old and new dimension

Segmentation for supermodule 3 strips sector is not fit very well with DIRC sector The best solution as for us.Two type for supermodule should be produced

Electronics and services H.V. PCB FEE Readout connectors FOPI supermodule

Summary Many thanks again for feedback from the other subdetectors!!!!! 1.New system design for barrel TOF was done. 2.We are now fit as well into space between tracker and DIRC. 3.We rearranged strips to have 16 sectors.(4 strips in one module preferred) 4. The aim is to have one side services and readout, but we need to produce PCB ASAP to confirm this!!! 5.New ROOT model will be done soon (fortunately not so many things to change) We will update our EDMS documents: and

BACKUP

Strip design Zoom view for place of PCBs merging region 100 mm 1500 mm