Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for.

Slides:



Advertisements
Similar presentations
Serving PI in a Geospatial World Amie Evans Seattle Regional Seminar November 10, 2009.
Advertisements

DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
OptiShip ® Multi-carrier Shipping System. OptiShip ® customers save on average 13.6% of parcel shipping costs… OptiShip ® is a comprehensive system that.
Is your company drowning in a sea of documents and regulations ? Quality Systems Integrators presents... TMSWeb Quality Management Compliance System.
Presentation by Priyanka Sawarkar
Components of GIS.
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. PI Maximization Strategy at Duke Energy Tim Murphy IT Manager.
Space Missions Can Your Library Automation Software Do This? David Hook MDA
Value Now: Off-the-Shelf Operational Visibility in ProcessBook and RtPortal Data South Systems and Dominion Power.
HP Quality Center Overview.
Self-Service Business Intelligence for the Product Management Department (Concurrency Corporation)
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
E-Mon Energy™ Energy Monitoring Software
1 Value now. Value over time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using OSIsoft to Become Compliant James Cosgrove, Northeast Utilities.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Improving Boiler Water Chemistry Regional Seminar Series Cincinnati.
Gathering, Managing, and Displaying Soil Data Using Automated Tools Dr. David W. Rich Atlanta, GA April 28, 2013.
Lean Operations for Water and Wasterwater Controlling Cost While Improving Efficiency… A Real World View.
Information and Decision Support Systems
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
1 Alternate Title Slide: Presentation Name Goes Here Presenter’s Name Infrastructure Solutions Division Date GIS Perfct Ltd. Autodesk Value Added Reseller.
High-Level Assessment Month Year
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
Brooklyn Navy Yard Cogeneration Partners
Computerized Maintenance Management Solutions (CMMS)
Risk Modeling with Condor at The Hartford Condor Week March 15, 2005 Bob Nordlund The Hartford
By N.Gopinath AP/CSE. Why a Data Warehouse Application – Business Perspectives  There are several reasons why organizations consider Data Warehousing.
Operational Excellence at Roche: PI Delivers Robert Fretz F. Hoffmann-La Roche Ltd. Basel, Switzerland.
Production visibility: KPI’s in Real-time BASF – The Chemical Company
AFISS, ◊ Tel: (519) ◊ ◊ ◊ Web: ◊
ADDED VALUE APPLICATIONS ~ ENABLED THROUGH PI Jerry Weber, Thermal Performance Specialist Frank Borth, Performance & Data Engineer Wayne Benedeck, Thermal.
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
Fleet Performance and Reliability in Generation Utilities
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
‘Monitoring Solutions for 2001’ Rome, Italy Wednesday 31 st January, 2001.
2 © 2005 OSIsoft, Inc. – Company Confidential Paul Ireland Manager – Information Engineering, RWE npower Technology Services P I.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
1 © 2008 OSIsoft, Inc. | Company Confidential Edison Mission Energy: PI for the Next Generation (of Generation) OSI Regional User Conference 10/09/08 Jerry.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
PI – An Enterprise Integration Tool Mark Brown – Calpine Corporation Mark Bowles – Calpine Corporation Sam Jenkins – Calpine Corporation.
1 OCEANIA TECHNOLOGY SEMINAR 2008 © 2008 OSIsoft, Inc. | Company Confidential OCEANIA TECHNOLOGY SEMINAR 2008 Jason Cheshire Network Management Systems.
Real Time Data As A Corporate Asset Presenters: Steve Browder John Rodgers.
Network Management Presentation HP Openview Christopher Scott December 10, 2004.
Web GIS Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 MCS Web GIS Commander is Web-based GIS (Geographical.
1 Critical Mission Support Through Energy Security Susan Van Scoyoc Concurrent Technologies Corporation 16 August 2012 Energy Huntsville Meeting Huntsville,
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Site Specification Management Using the RtPM Platform
Systems Analysis and Design
Toward Generic Systems Shifra Haar - Central Bureau of Statistics-Israel.
Sea Ice Mapping Systems Archive Browser Interface Distribution IngestProduction Ice Analyst Application Database Henrik Steen AndersonDMI Paul SeymourNIC.
Technology is Integral to Corporate Culture May 8 th, 2008 H. Kevin Stogran Director - Market Operations Support OSISoft Regional Conference, Kansas City.
#ConnWeek Data Pedigree: Can you trust your data?.
Managing Reliability and the Markets with PI
THE SIP PROJET by Emilio M. Dominguez
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
How AEP is Approaching the Information Management Crisis by Leveraging OSIsoft’s Suite of Tools Bill Sigmon Sr. Vice President Fossil and Hydro Generation.
Evolution of PI in an Expanding Utility’s Strategy John L. Ragone KeySpan.
Systems Development Life Cycle (SDLC)
U.S. Department of Agriculture eGovernment Program May 26, 2004 eGovernment Working Group U.S. Department of Agriculture eGovernment Program.
c fingler - bc hydro 1998 PI User's Conference 25 March.
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
Project Outline I A New CRM database must accomplish the following:  Deliver support resources for internal IT  Integrate all data from existing CRM.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Cut down on the time it takes employees to process invoices using Square 9’s SmartSearch integration with Microsoft Dynamics GP. SmartSearch allows invoice.
Presenter: Prof. Dimitris Mourtzis Advanced Manufacturing: Industry 4.0 and Smart Systems.
John Philbrick PE, CCP, PMP
An all-in-one Solution to take file contents to disparate Cloud
Opportunities in the Changing Energy System
Systems Analysis and Design
An all-in-one Solution to take contents to Cloud
Presentation transcript:

Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for the 2004 OSI Users Conference

Introducing - Calpine Geysers

First Electrical Generation From Geothermal Steam in the U.S. First Electricity Generated at Geysers

Pacific Gas and Electric Company Begins Commercial Operation of the First Geothermal Electric Generating Station Run by a Utility in the U.S. Commercial Operations Begin

Geysers Becomes Largest Geothermal Power Facility 1973 The Geysers Becomes the Largest Geothermal Power Facility in the World, Surpassing Larderello, Italy 1984 Calpine Founded

1989 – Calpine Acquires 5% Interest in the 20-mw Aidlin Plant (First Megawatt) Calpine Acquires First Megawatt

By 2000 Calpine had Acquired Freeport McMoRan’s, Thermal’s, Unocal’s, PG&E’s, SMUD’s, FPL’s and Mission Energy’s Interests in Plants and Wells at the Geysers Calpine Expands Interest

The Geysers Today 21 Power Plants 425 Production Wells, 53 Injection Wells 30 Square Miles in Lake and Sonoma Counties Approx 350 Employees

The Geysers Geothermal Field

Objectives Integrate Operations and Processes developed by five different companies without disruption Automate and streamline processes where possible to increase accuracy, reduce cost, decrease delay of information, and increase information access for Decision Makers Develop and Implement an Integrated Centralized Operations Capability for all Generation and Production Assets

Original Situation

Challenges Multi-Vendor Environment Must Not Disrupt Data Flow or Accuracy Processes must be approved by outside Agencies Training and Operational Understanding Collection and Reporting Systems are Changing

Keys to Success Reliability Accessibility Solid Communication Infrastructure Central Repository Easy to Use Customizable Flexible

Solution PI Used initially as a bridge between data collection and SCADA to reporting systems Transition to the Central Data Repository Not a SCADA or DCS System! –Used for Historical Data

Process Implemented PI server in between the data collection systems and the reporting systems Develop non-standard PI interfaces if required Created Process Book Displays to mimic existing Operational Displays Redirect Reporting Systems to retrieve data from PI

Interim Solution

Sample Screens OLD

Sample Screens NEW

Sample Screens OLD

Sample Screens NEW

Sample Screens OLD

Sample Screens NEW

Sample Screens OLD

Sample Screens NEW

Next Steps Retire Legacy Systems Transition PI from Data Bridge to Total Data Repository Automate while Maintaining Data Accuracy Import Legacy Data Remember Don’t Break Anything!!!!

Data Accuracy Issues Historically some data verification wasn’t accomplished until the Analyze and Distribute Phases on a Monthly basis Gather Assign Context Analyze Distribute Visualize Act

Data Accuracy Solution To obtain desired accuracy level all data must be initially checked as close to the Gather stage as possible! Gather Assign Context Analyze Distribute Visualize Act

Today’s Snapshot

Current Snapshot PI Tag count = 10,320 Average Scan Rate = 5 Seconds PI interfaces –DCS to PI –PI to PI collecting data into PI test server from PI production Archives –Count = 204 –Date Range = From Jan 1, 1990 to present (includes data backfilled from production archives)

Future Visions Assign Context – Transition to Modular Database Analyze & Distribute –Transition PI from One to Many Data Bridge to Total Data Repository –Continue to Automate while Maintaining Data Accuracy Visualize –Increase Accessibility and Flexibility of Reporting Tools (WEB Based)

Future Vision

Observed Benefits - ACT Ability to see the whole picture with one view Ability to View Geothermal Plants as part of the entire Calpine Fleet Able to quickly react to changing conditions in resources or market ($$$) Able to improve performance and monitor or improve environmental effects while reducing cost of operations Enable decision-makers to make more informed decisions

Summary PI met our needs based on our requirements PI not only allowed us to transition but also positioned us to reap further benefits for years to come utilizing the exact same technology.

THANK YOU FOR YOUR TIME QUESTIONS?