9th RCC Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008, Prague, Czech Republic.

Slides:



Advertisements
Similar presentations
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Advertisements

BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Vienna, 8 April th IG Meeting Meeting Guide.
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Dipl. Ing. Dr. Stephan Ressl Vice Chairman EFET Europe Gas Chair EFET SSE Head of Business Development EconGas GRI SSE Vienna, European Federation.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
6th RCC Meeting – Region South-South East 30th March 2007, Milano.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Gas Regional Initiatives (GRI) – Progress Report Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
1st RCC Meeting – Region South-South East June 1, 2006, ROME.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Advisory 8 April 2008 Regional Market Development Impediments for Traders Strictly Private and Confidential.
Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Madrid, 11th September st RCC Meeting South Gas Regional Initiative.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
3rd SG Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008 Prague, Czech Republic.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
3rd IG Meeting – Region South-South East 9th October 2007, Maribor, Slovenia.
Regional Initiative Progress and Next Steps Graeme Steele.
7th RCC Meeting – Region South-South East 5th July 2007, Krakow, Poland.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
1st Implementation Group Meeting – Region South-South East 13th 2006, Vienna.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Madrid, 3rd October st SG Meeting South Gas Regional Initiative.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Region South-South East
10 year investment plan ERGEG approach and contribution
New transparency guidelines
Harmonization of Cross Border Transmission Tariffs between
43th IG Meeting South Gas Regional Initiative
2009 TSO Transparency Gas Regional Initiative North-West
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
29th April 2014 Teleconference
43th IG Meeting South Gas Regional Initiative
Gas Regional Investment Plan project
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

9th RCC Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008, Prague, Czech Republic

2 Agenda Under AOB

3 Suggested AOB (to be addressed later) Update on CEER/ERGEG related issues: 1. Issue of barriers to market entrance 2. Coherence & convergence 3. Memorandum of Understanding 4. Annual Report of Regional Initiative & Annual conference of the Regional Initiative 5. Joint ERGEG-EFET work shop on R_ISO

4 Action Points 1-3 of the last IG meeting 1. Topic: Best-practice standardised bulletin board Action: harmonized content for individual TSO platforms according to TAG and OMV best practice Responsible/Result until: TSOs/presentation at next SG 2. Topic: Summary of planned investments in the region (incl. storage) Action: Inclusion of information on expansion projects (Transmission & Storage) into the survey Responsible/Result until: RCC/presentation at next SG 3. Topic: Removing remaining obstacles to implementation of IPA/OBA Action 1: further update on implementation Action 2: Baumgarten Responsible/Result until: TSOs, Shippers

5 Action Points 4-6 of the last IG meeting 4. Topic: Best practice provision of OSS service Action 1: Transparency platform (GTE pilot project) Action 2: TSOs offer OSS service to shippers who request it Action 3: best practice OSS (OMV, Responsible/Result until: TSOs/CEGH presentation at next SG 5. Topic: Regional Entry Exit Tariff System (REETS) Action 1: Presentation of benchmarking results Action 2: Simulation of introduction of REETS Responsible/Result until: RCC/presentation at next SG 6. Topic: Hub development as regional balancing market Action 1: Update on implementation of next steps according schedule Responsible/Result until: CEGH/EFET and PSV/EFET/presentation at next SG

6 SG meeting agenda – 1

7 SG meeting agenda – 2

8 SG Meeting: Agenda: Suggested next steps 2007 ECRB South East Europe Gas Survey, table 5, annex

9 GTE approach: Winter outlook (presentation at the SG)

10 Suggested next steps Questions to SG members  Which approach is useful for a regional long term planning?  Could the GTE approach be used as a starting point to define (a) different gas flow scenarios and (b) long term projections e.g. until 2020?  What are likely scenarios that could impact on supply/demand in the region? - Demand side:Supply side: - Power station newbuilt- IGI (Poseidon) - Household demand- Nabucco - Industry demand - LNG Poland - Extension Transmed. - North stream  Update on situation for each country: Priorities infrastructure planning  Report/Presentation at the next IG meeting Aim: To develop a better understanding for natural gas supply/demand in the region and implications for infrastructure investment SG invited to send their comments to Your input needed!

11 4. Closure: Any other business  Any other business?  Further examination of the issue of potential barriers to market entry E.g. Traders, shippers Examination via study Similar study carried out by PwC in electricity Collaboration with EFET to ensure high participation rates Suggestion: Commission of similar study for natural gas Coverage of whole of SSE region Who is interested in participating? Funding: Approximately €5000 per regulator

PricewaterhouseCoopers April 2007 Participation of SEE GRI in PWC MulitClient Study Structure of the PWC Multi Client study 2006/2007 for the Regional Electricity Market: Austria, Czech Republic, Germany, Hungary, Poland, Slovakia and Slovenia 39 traders, with a response of 48%, research was done between June and October Analyse of requirements for traders for an efficient and transparent market 2.Traders where asked directly about their experience Comparison Country by Country The survey covers following main topics: Network access administration and bureaucratic formalities Power exchanges and trade mechanisms Balance Energy Congestion Management Market structure and Timetable Divergent IT Platforms and Data Delivery Overall valuation

13 4. Closure: Any other business  Brief update on findings from coherence and convergence report  Consultation process has ended/evaluation of responses document to be published soon  15 responses received, 3 of them are confidential  Key messages from preliminary analysis of responses: - Sufficient degree of consistency between the regions - Scepticism about current approaches towards interconnection and capacity: not enough consistency, not enough progress made - Divided views on progress w.r.t. transparency - Majority in favour of deleting the 3- shipper rule - More gas hubs as functioning & liquid markets for natural gas are needed - MoU to be rolled out to all regions?

14 4. Closure: Any other business  Discussion of MoU for SSE region Suggested by AEEG In line with conclusions of public consultation from the coherence and convergence report  Background: MoU concluded in GRI REM NW on 23rd of October 2007 Signatories: Belgium, Denmark, France, Germany, Great Britain, Ireland, The Netherlands, Northern Ireland, Sweden (not: Poland) MoU clarifies mutual responsibilities for cooperation Key question: Do we need/would we want such an MoU also for the GRI REM SSE? Suggestion: Circulation of existing NW MoU to all RCC members

15 4. Closure: Any other business  Update on Annual report of the Regional Initiative  Background: Annual conference on 27th February 2008  Agenda available online from ERGEG web page  Annual report has been finalised Timing: - 18 January: draft report submitted to to the GA and Ofgem designers - 23 January: Board approval at Board meeting - 25 January: deadline of GA online approval (small changes, typos etc.) We are still awaiting the input from Commissioner Piebalgs on the joint Foreword.

16 4. Closure: Any other business  Update from joint ERGEG-EFET workshop on R_ISO - Key findings and next steps: - ERGEG presented its view on the R_ISO model in line with its official position - Examples from other areas were reported - Stakeholders were given the opportunity to comment - Examples: EC, EURELECTRIC, EUROGAS, GTE, OGP  EFET will collect all views and revise its paper (new version/conclusions paper)  An updated paper will be available shortly

17 Conclusion  Conclusions of today’s workshop - Practical examples of regional TSO cooperation already exist  Identification of costs and benefits for regional market integration/of a R_ISO based on existing examples  Parallel process to 3rd Package - Workshop participants identified scope for the regional cooperation in the following areas where regional TSO cooperation delivers the greatest benefits to market integration - Access to capacity/Congestion Management at Cross Border Points - Management of capacities (“one-stop-shop”) - Easier access to the systems through Interconnection Point Agreements - Harmonisation of services - Merging of balancing zones to foster wholesale trading - Regional investment planning to remove physical congestion - Roles and responsibilities - Cost / Benefit analysis

18 Outlook Outlook: Next steps after today’s workshop - EFET to evaluate all comments and draft an evaluation and conclusions paper based on the outcomes of the workshop - TSOs are invited to make a proposal (e.g. MoU on cooperation) covering the identified issues, the envisaged structure for cooperation and a time schedule for implementation - RCC to update progress on Regional TSO-cooperation at next IG meeting WITH ALL STAKEHOLDERS in mid-April Forms of Regulatory Cooperation

19 Operational Conclusions  Approval of agenda and procedures for SG meeting  Review of outcomes from joint ERGEG-EFET work shop: Comments on REETS paper  Next steps Consultancy work Coherence and Convergence MoU  [to be added]