ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.

Slides:



Advertisements
Similar presentations
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
Advertisements

FD support status N.Geffroy, G.Gaillard, B.Bolzon, A.Jeremie (and discussion with T.Kume)
1 27 Sep 05 Discussion of anti-DID ( “DIDNT” ? ) A.Seryi September 27, 2005.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
Suggestion Directive from Magnet Systems Group for how to name ILC magnet types Cherrill Spencer, ILC 2 nd May 2006.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Structural Drafting Connection Details and Gages.
BPM support and beam pipe length FD support status A.Jeremie.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
ATF2 Magnets Results of the Field Measurements of three ATF2 DEA Dipoles by Single Stretched Wire and Hall Probe at IHEP over past 2 months: updated report.
ATF2 Magnets ATF2 Magnets 7 Oct 08,ATF2 weekly meeting Cherrill Spencer Report ATF2 FD Quads: Mech Msts 1 Report on the mechanical measurements of ATF2.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
IP Tuning Task Updates Glen White, SLAC January
ILC BDS LATTICE DESIGN WITH TDR PARAMETERS
Alignment and stability session
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Summary FD Support System
Emittance Diagnostics
Tolerances & Tuning of the ATF2 Final Focus Line
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
ATF2: final doublet support
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
ATF2 IP Tuning Task Simulation Updates
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy
FD supports A.Jeremie.
High Precision Magnet Production for NSLSII at IHEP
IP configuration session
IR Lattice with Detector Solenoid
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Presentation transcript:

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made at SLAC from old FFTB “QC3” style quads: 11 th March 2008 Cherrill Spencer, SLAC Member of ATF2 Magnet Team

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 2 Concern about affect of nearby steel H beam on the QD0 field Shintake monitor’s support structure, closest approach to QD0

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 3 Plan view of Shintake support & magnet support table showing about 40 cm from middle of H steel beam to closest edge of QD0 steel core Closest approach here QD0

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 4 Use a ~60cm long steel H beam of approx correct dimensions and put it 40 cm from core edge, stand it up vertically for ease of installation & is worst case. Size & shape of H beam: A=B=15cm T 1 =0.7cm Steel H beam QD0 being measured

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 5 Measure QD0’s integrated strength & multipoles at 132 amps, 5 times without H beam & 5 times with H beam Calculate averages of ∫G.dl/amp without and with H beam: Without: / T/A With: / T/A –Delta=0.0019% -> insignificant 12-pole without with as % of quad at 1cm > NO change in multipoles

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 6 Chosen method for enlarging the FFTB “QC3” quad’s bore diameter Place a very flat and precise thickness shim in each split plane to “explode” the quad and enlarge the bore diameter. Shim will be low carbon steel, ground to ” flatness Hyperbolic pole-tip is moved, along a radius, further out than it’s equation says it should be. XY= r 2 /2. Consequence: the 12-pole component increases, ~17 times predicts POISSON. ATF2 has very tight tolerances on the multipoles in QD0 & QF1

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 7 Drawings of the modified core with ground shims in place Sextupole component is very sensitive to poletip being at wrong radius or the poletip being offset “azimuthally” GOAL :Adjacent pole distances (red arrow above) adjusted to be same to +/ mm. Then cores pieces pinned –BUT DOWEL PIN HOLES TOO SMALL, so achieved +/-0.031mm

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 8 Close up view of modified quad Shim added at split plane Large bolts keep 4 core quadrants attached to each other

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 9 POLE SIDE SHIMS IN PLACE- reduce the 12-pole to below tolerance

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 10 Sextupole/quad values did not change when installed pole side-shims 12 pole/quad at 1cm reduced from 0.17% to 0.034% [tolerance was <0.05%] Sextupole/quad still at 0.038% at 1cm Much too large said Glenn White. The spot size at the IP is very sensitive to the sextupole components in QD0 and QF1 –The unwanted sextupole is mostly a skew sextupole, it affects the spot size, we have to improve the adjacent pole distance symmetry. The pole side- shims having some asymmetry [ ~0.3 mm] did not increase the sextupole component.

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 11 Worked with technician to improve adjacent pole symmetry Had to enlarge the dowel pin holes so could adjust the quadrant positions- first try did not improve the symmetry on quad #1, so worked on quad #2 – bolt torque settings adjusted iteratively, distances re- measured Have achieved much closer distances, largest difference is mm, or +/ mm, other differences are smaller. Measured field without pole-side shims: sextupole/quad at 1cm = 0.013% –i.e. one-third its previous value.

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 12 Magnetic measurements also measure the angle of the first south pole of any multipole, relative to horizontal axis The angle measurements indicate there is significant skew sextupole mixed in with the normal sextupole. Glen White has modelled the beam passing through QF1 & QD0 with the smallest multipoles I have achieved, at their measured angles, and the spot size is still “too large”. But when the FD sextupoles strength and roll (using their magnet movers) are adjusted to compensate for the unwanted sextupoles in QF1 & QD0 then the spot size is below 40 nm.

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 13 How to maintain the best positions of the 4 quadrants, e.g. after quad been split for SBPM to be installed? Problem: when the pole side-shims are installed you cannot access the ends of the hyperbolic poletip to measure the adjacent pole distances anymore. The shim to shim distances don’t tell you how good the poletip distances are. But need these poletip distances to be correct to better than 0.010mm We will shorten the pole-side shims by about 1cm at each end so gauge blocks can still be used to adjust the adjacent pole distances. 12-pole will increase a little- but we are sufficiently below the 12-pole tolerance we can afford to let it increase.

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 14 Thermal behaviour & integrated strength Thermal tests : run at 150 amps for ~ 1 hour with 2.5 gpm total in 8 water circuits –Cooling water temperature increased by ~1.3°C [will be less at operating current] Will run at amps to get required nominal ∫G.dl. In order to shift the IP spot onto the Honda monitor, QD0 needs to run much stronger- will need 220 amps. Did a thermal test at 220 amps also. LCW temp increased by ~1.8°C- acceptable increase.

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 15 ATF2 FD quad run at 150 amps for 45 minutes

ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 16 ATF2 FD quad run at 220 amps for 2 hours