A PRACTICAL TRAINING SEMINAR ON PLCC

Slides:



Advertisements
Similar presentations
Seminar Report On Digital Power Line Carrier Communication
Advertisements

Chapter 12 Transformers. Chapter 12 Transformers.
Chapter 13 Transmission Lines
ASSIGNMENT TEACHER Smt. K.VASUMATHY GROUP MEMBERS:- MANSI DWIVEDI (ET 4 TH SEM) ARTI DWIVEDI (ET 4 TH SEM) DIKSHA CHANDRAKAR (ET 4 TH SEM) MAMTA CHOUDHARY.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
MUHAMMADALI MC SDE(KAM) KANNUR EARTHING. O BJECTIVES OF EARTHING  To reduce the cross talk and noise  To afford reliable path for circuits involved.
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
VIGNAN INSTITUTE OF TECHNOLOGY AND MANAGEMENT
How to efficiently use the electrical distribution underground cables for Power Line Communications and to achieve the Smart grid’s goals. Energy Smart.
Chapter 8 COMMUNICATION AND COMPUTER NETWORK
PRESENTATION ON SUBSTATION DESIGN
 The output from a single amplifier is generally insufficient to drive an output device. In other words, the gain of a single amplifier is inadequate.
Physiological Effects of Electricity on Human Body by Mohd Yusof Baharuddin.
ECOM 4314 Data Communications Fall September, 2010.
POWER SYSTEM PROTECTION
What makes substation work?
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Power Line Carrier Communication VAIBHAV RAI EN VI-B
Transmission Lines No. 1  Seattle Pacific University Transmission Lines Kevin Bolding Electrical Engineering Seattle Pacific University.
Electromagnetic Spectrum
1. Physical Transmission Transmission Media Wire (guided) Coaxial cable Twisted Pair UTP STP Fiber Optic Wireless (unguided) Radio waves Microwave Infrared.
COMMUNICATION SYSTEMS (5marks)
POWER HOUSE.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
Submitted to: Submitted by:
Programmable Logic Controllers
1 st semester 1436/  When a signal is transmitted over a communication channel, it is subjected to different types of impairments because of imperfect.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A SUMMER TRANNING PRESENTATION ON 400 KV GRID SUB STATION BIKANER
A Presentation On 132 KV GSS BEHROR
Submitted to: Submitted by:
SEMINAR PRESENTATION ON 220 KV GSS UDAIPUR
Distribution Systems-General
ON 400 KV GSS RAISER JAIPUR ROAD ,BIKANER
Department of Electrical Engineering
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
132KV GSS PIPAR CITY JODHPUR
Network Media. Copper, Optical, Fibre (Physical Layer Technologies) Introduction to Computer Networking.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
BENATO IT Session 4 – Block 3 – Question 6 Barcelona May 2003 THE ISLANDING PROBLEM PASSIVE PROTECTIONS AS DEMONSTRATE THE POSSIBILITY OF FAILING.
Submitted To:- Submitted By:- Mr.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
BASIC INSTRUMENTS - oscilloscopes
What makes substation work?
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
LIGHTENING PROTECTION USING LFA-M
PLCC OVERVIEW :PRESENTED BY BIMAL NANDA
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
D.C. Machine & Transformer Topic: Instrument Transformer Electrical:-1 presented by: Jill Chauhan ( ) Chirag Agarawal ( )
6 Week industrial Training Presentation
A TRAINING SEMINAR ON PLCC AT Presented to :- Mr. MANISH SINGHAL Mr. ANSHUL GOYAL Presented by: AJAY GUPTA IV year, EC - A 1.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
High Voltage Engineering
Sub Station.
A SEMINAR ON LIGHTNING ARRESTER
Balaji engineering college Special transformer
High Voltage Engineering
Overview Communication is the transfer of information from one place to another. This should be done - as efficiently as possible - with as much fidelity/reliability.
Basics of electrical engineering
OVER VOLTAGE The voltage waves having magnitude more than its normal value. In other words, sudden rise to an excessive or abnormal value It remains for.
Physical Transmission
EHV Transmission Equipments
Protection against over voltages
A. Touching both terminals with the hands can cause electrical shock
POWER LINE CARRIER COUPLING DEVICE
HIGH VOLTAGE ENGINEERING Presented By P.Sindhu Asst.Prof EEE Dept
Presentation transcript:

A PRACTICAL TRAINING SEMINAR ON PLCC RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD. www.engineersportal.in

INTRODUCTION TO PLCC POWER LINE CARRIER COMMUNICATION is the technology which is used to communicate between electric substations through existing electrical cables. POWER LINE CARRIER COMMUNICATION is mainly used for telecommunication, tele-monitoring and tele-protection between electric substations through power lines at high voltages. The data can be transfer at 9.6Kbits/sec over many miles of electrical cable. www.engineersportal.in

PLCC System www.engineersportal.in

BASIC PRINCIPLE OF PLCC In PLCC the higher mechanical strength and insulation level of high voltage power lines result in increased reliability of communication and lower attenuation over long-distance. Since telephone communication system can not be directly connected to the high voltage lines, suitably designed coupling devices have to be employed. Coupling devices consists of high voltage capacitors in conjunction with suitable line matching units(LMU’s) for line impedance matching to that of the co-axial cable connecting the unit to the PLC transmit-receive equipment. Carrier currents used for communication have to be prevented from entering the power equipment used in GSS as this would results in complete loss of power system. www.engineersportal.in

EQUIPMENTS USED PLCC Station. Line Matching Unit (LMU). CVT/CC. Earth switching. Lightning Arrestor. Wave Trap. Co axial Cable. www.engineersportal.in

Output Power : 10 – 80 W ABB PLCC TERMINAL ETL- 41 PLCC Station: It is the station where Transmitting, Receiving, amplification and Filtration are performed. Frequency Range : 40 – 500 khz Audio Bandwidth : 4 Khz Output Power : 10 – 80 W ABB PLCC TERMINAL ETL- 41 www.engineersportal.in

PLCC PANNEL TRANSMITTER/ RECIEVER www.engineersportal.in

Line Matching Unit For impedance matching between line and coaxial cable, includes high voltage protection devices like drainage coil(20mH), lightening arrestor(500V) and an earth switch. LMU functional www.engineersportal.in

Control Voltage Transformer/Coupling Capacitors It is connected between the line matching unit and the power lines to block the high voltage entering to PLCC equipment. It couples high frequency carries with power line. www.engineersportal.in

Earth Switch: This is used for the maintenances of LMU Earth Switch: This is used for the maintenances of LMU. The main function of Earth switch is to ground the trapped charges. Lightning Arrestor: This is used for arresting any A.C. high voltages spike entering to the LINE MATCHING UNIT. Co- Axial cable: This is used for interconnection between PLCC Station and LMU for carrying high frequency signal. www.engineersportal.in

A wave trap must satisfy the following requirements:        WAVE TRAPS or LINE TRAPS Wave traps – (WT’s) are used between the transmission line and the power stations to avoid carrier power dislocation in the power plant and cross talk with other power line carrier circuits connected to the same power station. WT’s also ensure proper operating conditions and signal levels at the PLCC transmit receive equipment irrespective of switching conditions of the power circuits and equipment in the station. A wave trap must satisfy the following requirements:  1)     It must block the carrier currents. By blocking, we mean that the track should attenuate the H.F. signals by at least 8 to 10 dB. 2)  It must carry the power frequency current safely during normal operation as well as during short circuit fault conditions. www.engineersportal.in

WAVE TRAP www.engineersportal.in

COUPLING : PHASE TO GROUND COUPLING: www.engineersportal.in

PHASE TO PHASE COUPLING: www.engineersportal.in

ADVANTAGES 1. No separate wires are needed for communication purposes, as the power lines themselves carry power as well as communication signals. Hence the cost is less. 2. Power lines have appreciably higher mechanical strength compared with ordinary lines. They would normally remain unaffected under the conditions, which might seriously damage telephone lines. 3. Power lines usually provide the shortest route between the power stations. 4. Power lines have large cross-sectional area resulting in very low resistance per unit length. Consequently carrier signals suffer much less attenuation than when they travel on telephone lines of equal lengths. 5. Power lines are well insulated to provide only negligible leakage between conductors and ground even in adverse weather conditions 6. Largest spacing between conductors reduces capacitance, which results in smaller attenuation at high frequencies. The large spacing also reduces the cross talk to a considerable extent. www.engineersportal.in

DISADVANTAGES 1. Proper care has to be taken to guard carrier equipment and persons using them against high voltages and currents on the lines. 2. High voltage lines have transformer connections, attenuate carrier currents. Sub-station equipments adversely affect the carrier currents. 3.  Noise introduced by power lines is far more than in case of telephone lines. This is due to the noise generated by discharge across insulators, corona and switching processes. 4. The noise is also introduced in the signal due to bad weather conditions. www.engineersportal.in

THANK YOU www.engineersportal.in

QUERIES….. www.engineersportal.in