1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.

Slides:



Advertisements
Similar presentations
WG-CSAB Updates Fall 2014 COPC Meeting (NSOF, Suitland, MD) Nov 4-5, 2014 Dave McCarren WG-CSAB Chair.
Advertisements

Update to COPC 4 – 5 November 2014 Dave McCarren, NUOPC DPM.
COPC/JAG-CCM Status Updates and Recommendations 16 November 2010 Chris Finnigsmier Acting JAG/CCM Chair.
Committee for Operational Processing Centers (COPC) Update NOPC Program Council Meeting 13 June 2012 (OFCM – Silver Spring, MD) Dave McCarren WG-CSAB Chair.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Fall COPC 2010 Mr. Evan Kuchera JAG/OCM Chair.
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
1 COPC Shared-Network Infrastructure Brief Prepared for: COPC Working Group for Cooperative Support and Backup (WG/CSAB) October 21 and 22, 2008 Meetings.
1 WRF Development Test Center A NOAA Perspective WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006 Fred Toepfer NOAA Environmental.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Release & Deployment ITIL Version 3
WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
05 December, 2002HDF & HDF-EOS Workshop VI1 SEEDS Standards Process Richard Ullman SEEDS Standards Formulation Team Lead
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
Working Group for Cooperative Support and Backup (WG-CSAB) Update Fall COPC 2007 John Zapotocny CSAB Chair.
1 Draft COPC/CSAB JAG-CCM Status Updates and Recommendations September 15, 2009 JAG-CCM Team version
Office of the Federal Coordinator for Meteorology OFCM Opening Remarks and WG/WIST Activities Update Paul Pisano Mike Campbell WG/WIST Cochairs June 6,
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
U.S. Department of Agriculture eGovernment Program July 10, 2002 eGovernment Working Group Meeting Chris Niedermayer, USDA eGovernment Executive.
1 NUOPC National Unified Operational Prediction Capability Status Review For NUOPC Executive Steering Group National Unified Operational Prediction Capability.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Forest Carbon Partnership Facility Global Dialogue on Developing a Readiness Preparation Proposal August 13-14, 2009 Structure of the R-PP template Review.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
1 Emergency Management Standards EM- XML Consortium & EM Technical Committee Presentation to Steve Cooper March 18,2003.
Allan Darling Deputy Director, NCEP Central Operations NOAA NWS NCEP
ExOB Discussions on Development Test Center WRF ExOB Meeting U.S. Naval Observatory, Washington, D.C. 28 April 2006.
JAG/ODAA Fall 2008 James Vermeulen & Jon Whiteside JAG-ODAA Co-Chairs Recommend NCEP's Bradley Ballish replace Jon Whiteside (term completed)
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Joint Action Group for the National Wildland Fire Weather Needs Assessment 12 Oct 2006, 12:30 – 4:30 EDT Cochairs: Dr. Al Riebau, Mr. Eli Jacks OFCM: Lt.
WG-CSAB Update Fall 2010 COPC Meeting (FNMOC – Monterey, CA) Allan Darling WG-CSAB Chair.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
PSCIOC-PSSDC Workplan Coordination Strategy– Draft Coordination Committee Telecon
RECAPITALIZING THE NATION’S WEATHER PREDICTION CAPABILITY National Unified Operational Prediction Capability (NUOPC)
Slides for NUOPC ESPC NAEFS ESMF. A NOAA, Navy, Air Force strategic partnership to improve the Nation’s weather forecast capability Vision – a national.
1 Geospatial Line of Business Update FGDC Coordination Group April 14, 2009.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
1 COPC JAG-CCM Status Updates and Recommendations May 4, 2010 JAG-CCM Team version
1 COPC/CSAB JAG-CCM Status Updates and Recommendations April 7, 2010 JAG-CCM Team version
1 NUOPC National Unified Operational Prediction Capability Update to COPC 27 – 28 May 2015 Dave McCarren, NUOPC DPM.
1 NUOPC National Unified Operational Prediction Capability Update to COPC 4 – 5 Nov 2015 Dave McCarren, NUOPC DPM.
1 Joint Action Group for Operational Community Modeling Dr. Nelson Seaman JAG/OCM Chair Fall COPC 2008 AFWA, Omaha, NB 13 November 2008.
WG-CSAB Updates Spring 2013 COPC Meeting (FNMOC, Monterey, California) November 20-21, 2013 Dave McCarren WG-CSAB Chair.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 COPC/CSAB JAG-CCM Status Updates and Recommendations Prepared for: CSAB Spring Meeting April 15, 2009 By: CCM Team version
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
National Unified Operational Prediction Capability NUOPC 1 National Unified Operational Prediction Capability (NUOPC) Fred Toepfer, PM Dave McCarren, Deputy.
NTIA Briefing EL-CID, FSMS & OSM-DD
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
1 Project Priority List (PPL) Update Troy Anderson ERCOT Enterprise Project Portfolio Management January 2011.
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
State of ESMF: The NUOPC Layer Gerhard Theurich NRL/SAIC ESMF Executive Board / Interagency Working Group Meeting June 12, 2014.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
WG-CSAB Update Fall 2008 CDR Mark Moran, NOAA WG-CSAB Acting Chair.
COPC Action Item : The COPC/CSAB shall work with the NUOPC Deputy PM to develop a proposed structure for the working relationship between NUOPC.
COPC Status Briefing on National Unified Operational Prediction Capability (NUOPC) Fred Toepfer 15 November 2007.
1 Status Briefing on National Unified Operational Prediction Capability (NUOPC) Fred Toepfer, NUOPC PM May 29, 2008 NUOPC.
September 2002 Brian Mathews - AbsoluteValue Systems Slide 1 doc.: IEEE /554r0 Submission Publicity Committee /.15 Brian Mathews, PC Chair.
Vers national spatial data infrastructure training program Training Materials Workshop Subject Matter Expert USGS Headquarters Reston, Virginia.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
CEOS Response to GEOSS Water Strategy
2009 IOOS Regional Coordination Workshop Thursday, August 27
Implementation Strategy July 2002
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
Review of Chair Priorities
SIT Chair Introduction
CEOS Virtual Constellations Process Paper
VC Title Goes Here Name (s), Organization, CEOS Affiliation
CONSTITUENT BODY REFORM (CBR)
Presentation transcript:

1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction Capability NUOPC Fred Toepfer & Dave McCarren November

2 NUOPC National Unified Operational Prediction Capability 2 Purpose of Briefing Provide NUOPC status update to COPC Review some key items prior to ESG presentation 2

3 NUOPC National Unified Operational Prediction Capability 3 NUOPC Outline Recent Accomplishments –IOC-1 implementation status –Common Model Architecture –R&D Workshop Near Term Priorities DAPE Annex Post-processing plan –Course of Action recommendations Common Metrics –Draft for presentation to ESG –Discuss Agency Implementation Plans 3

4 NUOPC National Unified Operational Prediction Capability 4 IOC-1 Update IOC-1 Implementation –Scheduled on track for Q2 FY2011 –TOC Infrastructure upgrade completed in July –FNMOC members integrated end of October –Transition to operations began with scheduled completion on January 11, 2011 IOC-1 Rollout –Lead TBD ○ESG desired OFCM Lead –Terminology 4

5 NUOPC National Unified Operational Prediction Capability 5 CMA Accomplishments 2010 NUOPC Architecture Documents Content Standards Committee - reviewing report findings and passing tasks to ESMF Core Team for implementation ESMF release 5.1 to include NUOPC Compliance Checker and Compatibility Checker NOGAPS programmed into alignment with ESMF NEMS implementation of ESMF adopted for NOAA –Ongoing alignment with ESMF/NUOPC interoperability standards Proposed single column model development will be instrumental in identifying additional coupling/interoperability issues

6 NUOPC National Unified Operational Prediction Capability 6 IOC-1 Product Terminology Necessary as Roll Out strategy for public, Tri-Agency use, journals, funding agencies The CMA Committee should recommend standard terminology for NEMS and the NUOPC Architecture (“Layer”) The CMA Committee should recommend standard terminology for NAEFS and NUOPC ensemble The ESG should approve for Tri-Agency use

7 NUOPC National Unified Operational Prediction Capability 7 R&D Workshop Research and Development Workshop was held Aug Workshop Objectives –Review NUOPC progress –Review Agency operational needs and identify common needs –Review ongoing ensemble research –Propose prioritized research and development agenda to meet common needs Prioritized R&D list to be presented to ESG Workshop summary submitted to Bulletin of AMS

8 NUOPC National Unified Operational Prediction Capability 8 Near Term (FY11-12) Actions Implement the National Unified Ensemble Forecast System –NOAA/Navy partnership to improve probabilistic forecasts –Common Metrics to measure performance NUOPC Common Model Architecture for Research transition to Operations –NUOPC Interoperability Layer into the Earth System Modeling Framework –Compliance Checker –Compatibility Checker National R&D Agenda for Global NWP –Socialize to R&D Agencies –Presentations at AGU and AMS Earth System Prediction Capability - Initiative –Grow partnership to other agencies, NASA, DOE, etc. 8

9 NUOPC National Unified Operational Prediction Capability 9 DAPE Annex Use current Data Acquisition, Processing, and Exchange (DAPE) MOA –Recommend Annex that deals with joint multi- model ensemble operations –Draft Annex revised; reviewing with COPC –Will be discussed at a later session 9

10 NUOPC National Unified Operational Prediction Capability 10 Post Processing Plan Post processing needs further discussion –Technical issues: QC of raw model outputs, bias correction, sophisticated calibration –Development of standard probability distributions of model parameters, joint probability products, other user products –Operations Concept: Who, What, When, Where, and How Will coordinate and recommend a path forward to ESG, potentially incorporate into a second annex to the DAPE MOA for ESG approval 10

11 NUOPC National Unified Operational Prediction Capability 11 Post Processing Plan Recommendation for IOC-1 –NOAA provides raw and bias corrected fields Recommendation for IOC-2 –NOAA provides raw and bias corrected fields –AFWA does primary post-processing for DoD mission products –AFWA maintains Tri-Agency post-processing tool kit –Post-processing coordinated by COPC JAG(s) (or whatever UEO Committee we recommend-must be same as other slide)

12 NUOPC National Unified Operational Prediction Capability 12 Common Metrics Technical metrics considerations –Need a controlled comparison (i.e. model vs model) –TTP Metrics subcommittee drafted initial proposal – sent to centers and liaisons –Common verification requires: »Common climatology (i.e., for anom. corr., skill scores) »Common analysis and/or common set of observations »Parameters of interest »Common test cases Request status of each agency’s implementation plan Request regular status reporting 12

13 NUOPC National Unified Operational Prediction Capability 13 Common Metrics Table

14 NUOPC National Unified Operational Prediction Capability 14 Ensemble Management beyond IOC-1 Future issues involve ensemble members, post-processing, upgrades Potential options: –COPC set up specific JAG –COPC distribute tasks over existing JAGs –Reconstitute the NUOPC UEO Committee under the ESG