1 Draft COPC/CSAB JAG-CCM Status Updates and Recommendations September 15, 2009 JAG-CCM Team version 1.0-20090911.

Similar presentations


Presentation on theme: "1 Draft COPC/CSAB JAG-CCM Status Updates and Recommendations September 15, 2009 JAG-CCM Team version 1.0-20090911."— Presentation transcript:

1 1 Draft COPC/CSAB JAG-CCM Status Updates and Recommendations September 15, 2009 JAG-CCM Team version 1.0-20090911

2 2 Outline CCM Team Membership Status Updates and Recommendations –Development of the Next Generation COPC Enterprise Network –Requirements gathering across the COPC partners Background Slides

3 3 CCM Team MemberOrganization Charles AbelAir Force/AFWA/A6 Kenneth BarnettOFCM Luis Cano*NOAA/NWS/NCEP/NCO Patrick GregoryNOAA/NESDIS/OCIO Jonathan L. HallNavy/CNMOC/N6 Craig HegemannNOAA/NWS/OCIO/TOC Seyed HosseiniNOAA/NESDIS/OSDPD/IPD Ben KygerNOAA/NWS/NCEP/NCO Tracy LePireNavy/NAVO Sherryl PanekNavy/FNMOC *JAG-CCM Chair

4 4 Development of the Next Generation COPC Enterprise Network COPC Action Item 2008-2.11: JAG CCM shall coordinate the development of the next generation COPC shared network infrastructure with DoD and NOAA IT leadership. The JAG CCM shall leverage projects currently underway that are planning a NOAANet-DoD enterprise network capability. [NUOPC related] Priority: (M) Advocate: JAG/CCM – [Craig Hegemann] Suspense: Spring 2009 CSAB meeting or (April 1, 2009).

5 5 Development of the Next Generation COPC Enterprise Network Status and Recommendation Summary Status: –Target date: August 2012, in progress, on track Risk (high probability/high Impact): –Funding to deploy enterprise network has not been identified Mitigation: –Determine COPC shared network cost estimates –Work DoD and NOAA budget request processes Recommendation: –Keep action item 2009 2.11 open

6 6 Development of the Next Generation COPC Enterprise Network DateMilestonesAssigned toStatusComments Aug 24, 2009 COPC CIOs send network requirements to OFCM COPC CIOs Complete4/24/09: Original due date 8/24/09: Received official response from CNMOC CIO, included network requirements for FNMOC and NAVO Sep 3, 2009 AFWA and CNMOC initiate short-term network upgrade for COPC DATMS-U Network CCM, CNMOC and DISA CompleteProvides ground work for a DoD-NOAA weather enterprise network 2 nd QTR FY2010 Short-term COPC DATMS-U network upgrade made operational CCM, CNMOC and DISA On Track9/3/2003: DATMS-U upgrade process initiated Provides additional bandwidth and aligns with DISA plans FY2011Enterprise Network designed with budget approval DISA, COPC and CIOs On Track9/11/2009: Network analysis requirements started FY2012Enterprise Network made operational DISA, COPC and CIOs NoneContingent on funding in FY12

7 Development of the Next Generation COPC Enterprise Network Short-term network upgrade –September 3 rd, 2009, AFWA and CNMOC (for FNMOC and NAVO) initiated the short-term network upgrade for COPC network –Excellent job by network team AFWA, CNMOC, FNMOC, DISA, NAVO, NESDIS, NWS and OFCM 7

8 Development of the Next Generation COPC Enterprise Network Short-term network upgrade –Estimate operational 2 nd Quarter FY2010 –Network upgrade include: AFWA from 14Mb,50Mb to 28Mb,60Mb FNMOC from 6Mb(2),14Mb to 28Mb(3) NAVO from 6Mb(2) to 28Mb(2) NOAA from 6Mb(2),50Mb to 28Mb(2),60Mb 8

9 Development of the Next Generation COPC Enterprise Network Short-term network upgrade –Provides ground work for a DoD-NOAA weather enterprise network Pathfinder to understand and exercise the integrated DISA, CNMOC and COPC network provisioning processes Provides additional bandwidth and aligns with DISA network infrastructure plans 9

10 10 Requirements Gathering Across COPC Partners COPC Action Item 2008-2.12: JAG CCM will provide an ongoing process to capture and coordinate telecommunication requirements across COPC partners. These requirements would include the size of the data, when the data needs to be transmitted, when the data needs to be received, which COPC partner will send the data, which COPC partner will receive the data, the schedule of when new data will or needs to be enabled, encryption requirements, other data restrictions, and related COPC business functions. As a follow-on action item, this process would be used to validate technical designs and resource estimates for new network infrastructure initiatives. This process would provide COPC continuing value by supporting network capacity management for existing infrastructure and help justify funding requests for future network upgrades. [NUOPC related] Priority: (M) Advocate: JAG/CCM – [Luis Cano (Chair)] Suspense: Spring 2009 CSAB meeting or (April 1, 2009).

11 11 Requirements Gathering Across COPC Partners Status and Recommendation Summary Status: –Target date: November 2009, in progress, on track Recommendation: –keep action item 2008-2.12 open

12 12 Requirements Gathering Across COPC Partners DateMilestonesAssigned toStatusComments Mar 14, 2009 OFCM send shared network requirements data- call to COPC CIOs CCM and OFCM Complete CCM coordinated design of requirements template with DISA Template design captures annual requirements for 5-years into future Aug 24, 2009 COPC CIOs send network requirements to OFCM COPC CIOs Complete4/24/09: Original due date 8/24/09: Received official response from CNMOC CIO, included network requirements for FNMOC and NAVO Nov 2009CCM analyze requirements and report-out to CSAB, DISA and COPC IT leaders CCM and OFCM On Track6/30/09: Original due date COPC CIOs and DISA use requirements analysis to help plan Next Generation COPC Enterprise Network AnnualUpdate COPC shared network requirements using annual data-call process CCM, OFCM and COPC CIOs None Annually update 5-year projection of COPC shared network requirements and share with COPC CIOs and DISA

13 Background Slides The following slides provide additional CCM status information 13

14 DATMS-U Silver Spring AP 1000 x.x127.32 x.x.249.22 Offutt AP 1000 x.x.129.31 x.x.249.30 Monterey Router x.x.249.17 Monterey AP 1000 x.x131.14 x.x249.18 Stennis Router x.x.249.25 Stennis AP 1000 x.x129.29 x.x249.26 Current DISA ATM System – Unclass (DATMS-U) for NAVAF.9.6 13.5 Offutt Router x.x249.29 CCSD-73WS CCSD-73WT CCSD-73WU.18.17.29 CCSD-73WH.14.10.30 Silver Spring ASX 1000 x.x117.161 Monterey ASX 1000 x.x.119.27 CCSD -73WJ Stennis ASX 1000 x.x118.68 Offutt ASX 1000 x.x118.31 OC3 CCSD – 6ARB 6TWB CCSD-73XZ CCSD-73XY DISN ATM Help Desk (800) 554-3476 DISN ATM NOC Alternate # (703) 735-3570/ 8351 DATMS-U NAVAF PM Terry Warren (703) 735-3520 As Of: Aug 2008 Silver Spring Router x.x249.21 6 Mb 50 Mb 14 Mb DS3 CCSD – 6GBF & OC3 CCSD – 6J4D 6TWA CCSD-73WG DS3 CCSD – 6HL5 6TWM OC3 CCSD – 6TNO 6TW6 CCSD -6574 14

15 2010 NAVAF MIGRATION TO OTN OTN Silver Spring ATM Stennis Router x.x.249.25 Offutt Router x.x249.29 73WS-28 Mb 73WT-28 Mb 73WU-28 Mb PENTAGON ATM Monterey MSPP Stenni s ATM Offutt MSPP 73XZ-28 Mb 73XY-60 Mb Silver Spring Router x.x249.21 ETH 10/100 Gunter ATM ETH 10/100 2xETH 10/100 Gunter MSPP 3xETH 10/100 3xETH 10/100 PENTAGON MSPP Monterey Router x.x.249.17 ETH 10/100 15

16 2012 DoD-NOAA Weather Enterprise Network 16


Download ppt "1 Draft COPC/CSAB JAG-CCM Status Updates and Recommendations September 15, 2009 JAG-CCM Team version 1.0-20090911."