RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
The Value of a Project Management Office Copyright: Kathy J. Lang, 2004.
Presented by: Leslie H. Smith, Manager Flight Technologies and Procedures Division, AFS-400 AVS Acquisition Executive Board (AEB) Member Date: October.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
NRC* Perspective on HDPE Road Maps Eric Focht, Materials Engineer U. S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Division of.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
Cumulative Impacts James Slider November 7, 2013.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
Center for Health Care Quality Licensing & Certification Interim Stakeholder Meeting 1 February 26, 2015.
ASME / NRC Management Meetings Kevin Ennis Director, Nuclear C&S Ryan Crane C&S Project Engineering Manager ASME 2 Park.
By Saurabh Sardesai October 2014.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Center for Health Care Quality Licensing & Certification Program Evaluation 1 August 2014 rev.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Software Engineering Institute Capability Maturity Model (CMM)
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
Procurement Analyst Position Update Procurement Training Forum August 24, 2010.
EASTERN MICHIGAN UNIVERSITY Continuity of Operations Planning (COOP)
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
Value Engineering at FHWA
NRC Endorsement of Standards
Federal Geographic Data Committee: Coordination Group Meeting Proposal: FGDC Annual Planning Process & Monthly Performance Management Reviews Submitted.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Project Initiation Document (PID) Strategic Plan PID Committee Meeting - November 5, 2012.
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
1 Strategy and Resources Committee - Performance Management Reporting: Quarter 4 Guide to reporting Key Service Priorities 2006/07 Key Service Priorities.
Roles and Responsibilities
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Summary of Rulemaking in California for the Forensic Alcohol Laboratories Regulation Review Committee Cathy L. Ruebusch, RN, MSN Office of Regulations.
New Identity Theft Rules Rodney J. Petersen, J.D. Government Relations Officer Security Task Force Coordinator EDUCAUSE.
RIC 2008 Power Reactor Security Requirements Rule Bonnie Schnetzler Team Leader, Security Rulemaking Team Division of Security Policy Office of Nuclear.
FERC Office of Energy Projects 1 Hydroelectric Licensing Regulations Final Rule July 23, 2003 Federal Energy Regulatory Commission Office of Energy Projects.
Overview of a Water Action Plan: California Public Utilities Commission Paul G. Townsley, President Arizona American Water January 18, 2011.
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
1 Geospatial Line of Business National Geospatial Advisory Committee Ivan B. DeLoatch, Managing Partner October 16, 2008.
1 Part 74 Material Control and Accounting (MC&A) Rulemaking Update NMMSS Users Annual Training Meeting Las Vegas, NV – May 20, 2010 Thomas Pham Material.
1 Options to Revise Radiation Protection Regulations SECY Kimyata Morgan Butler, Ph.D. Health Physicist/Project Manager Office of Federal and State.
Project Review Team Meeting Customer User Acceptance Test Update August 10, 2011 Santa Plummer, User Acceptance Test Section Head Government Employees.
1 RIC 2009 Licensing Action Acceptance Review Stephen Sands and Donna Wright Division of Operating Reactor Licensing March 11, 2009.
MDIC 1 George Serafin Deloitte & Touche LLP MDIC Open Forum Quality System Maturity Model Update.
East Hudson Regional Trail Council August 10, 2015.
RECOMMENDATIONS OF THE GOVERNOR ’ S TASK FORCE ON CONTRACTING AND PROCUREMENT REVIEW Report Overview PD Customer Forum September 2002.
Legacy Report of Select Committee on Finance By: Zolani Rento Date: 09 July 2014.
11 AB 32 Climate Change Scoping Plan Progress Report October 21, 2010 California Air Resources Board.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
Presented by Eliot Christian, USGS Accessibility, usability, and preservation of government information (Section 207 of the E-Government Act) April 28,
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Middle Fork Project Relicensing Process Plan April 25, 2006.
1 Item #10 Progress Report on Actions to Improve Regional Transportation Communication and Coordination During Incidents John M. Contestabile Director,
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
NRC Update of Low Level Waste Emerging Issues
Office of Nuclear Material Safety and Safeguards (NMSS)
NRC’s LLW Regulatory Program: Update of Emerging Issues
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
NRC’s LLW Regulatory Program: Update of Emerging Issues
Implementing the Transportation/Land Use Connection Program
NRC Cyber Security Regulatory Overview
Foothill College Accreditation Self-Study Update
Research and Test Reactor Safety: The Regulatory Perspective
Mountain Housing Council Innovative Policy Meeting
Presentation transcript:

RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman Chief, Regulatory Analysis, Policy and Rulemaking Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation March 11, 2009

2 Inconsistent Unpredictable Customer Requirements NOT met 50.55a Rulemaking

3 Lean Six Sigma Project Goal: -Establish a consistent, predictable and stable update process  Improve timeliness (24-month cycle time)  Improve stakeholder & employee satisfaction  Improve NRC resource utilization Inter-office effort: -Office of the Executive Director for Operations -Office of Nuclear Reactor Regulation -Office of Research -Office of New Reactors -Office of General Counsel -Office of Administration Assessment Period: -June – November 2008

4 A New Approach Recommended Solutions: -Developed in December solutions identified Procedures People Process

5 SolutionRank Delegate 50.55a rulemaking signature authority down to NRR Office Director. 1 Provide a dedicated 50.55a rulemaking Project Manager.2 Establish a scope control procedure to control emergent issues.3 Optimize the 50.55a rulemaking concurrence process.4 Begin the Technical Branch reviews for the next 50.55a rulemaking cycle in parallel with the current. 5 Provide training to Project Managers and Technical Staff.6 Establish a steering committee for oversight.7 Establish a 50.55a rulemaking working group.8 Recommended Solutions

6 SolutionRank Involve OGC early on and throughout the rulemaking process.9 Establish performance metrics tied to individual performance appraisals. 10 Create document templates.11 Define agency ASME Code Committee Program Managers (Section XI, Section III, and O & M). 12 Develop Inter-office procedure specific to 50.55a rulemaking.13 Determine the initial 50.55a rulemaking scope.14 Provide a dedicated Technical Group Coordinator.15 Enhance the MS Project schedule, including key milestones and tracking planned vs. actual. 16 Develop a standard operating procedure to track public comments and resolutions. 17 Recommended Solutions

7 Next Steps Implementation Plan: -Short-term actions (planned for current rulemaking)  Pilot scope control procedure  Optimize concurrence process  Delegate signature authority downward -Long-term actions (planned for next rulemaking)  Consider performing 50.55a rulemakings in parallel (single edition & addenda)  Create inter-office procedure  Apply solutions to 50.55a Regulatory Guide (RG) rulemaking  Determine optimum number of Edition/Addenda to include in rulemaking scope Communications: -User Feedback  Incorporate RGs for Code Cases into 50.55a as frequently as possible  Incorporate Code Editions/Addenda into 50.55a every 2 or 3 years  NRC representatives on Code Committees should identify to committees, early on, what items might be conditioned (so ASME can consider addressing issues in Code prior to rulemaking).  For ongoing 2005 Addenda through 2008 Addenda rulemaking, hold a public meeting during August 2009 ASME Code Week to get feedback from ASME before publishing proposed rule.  Give ASME (public) future rulemaking schedules for Edition/Addenda and RG rulemakings, including scope of rulemakings.  Create document templates  Establish steering committee  Dedicated Project Manager

8 Conclusion Improvements identified Implementation plan developed Enhancements underway Stable, Predictable and Consistent Process