CMS Sensormeeting 06.12.00: Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) Mechanical Assembly ready Instruments: LCR, Electrometer, PS, Quasistatic.

Slides:



Advertisements
Similar presentations
Status and future measurements on Micron detectors Outline: Irradiation and measurement in dry atmosphere Measurements in vacuum.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
IAP-PAI 25/05/20051 CMS Si Rad. Hardness Introduction Damage in Si Neutron tests => Beam => Irrad. Setup.
Water in the Atmosphere. Humidity Humidity is a measure of the amount of water vapor in the air. Air’s ability to hold water vapor depends on its temperature.
Irradiation Workshop KarlsruheA. Furgeri 1 Irradiation in Karlsruhe The Karlsruhe-Probestations Procedure of Irradiation Results Future annealing.
What are the 6 tools we use to measure the weather?
Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
WP3 10 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Re-structuring of QMUL Physics & Astronomy June/July 2013: Evacuated Physics building.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
Trade Skills Print Reading and Ductwork. 2 Drawings are a useful tool in manufacturing and construction because most people find it difficult to.
Characterization Lab Policy M. A. Alam April 24, 2012.
4 May 2010 Thomas Bergauer (HEPHY Vienna) Testing of Test Structures in Vienna CMS Sensor-TUPO.
Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
The OK Fast & Flexible Solution: SCS Sheet Collating System SCS 3010 – Sheet Collating System 3010 Semi-automatic positioning and fixing system for.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Examples and disciptions for measurements On pixel and strip sensors.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Relative Humidity. Humidity  the measure of the amount of water in the air  high humidity =lots of moisture in the air.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
Water in the Atmosphere Water vapor is the source of all condensation and precipitation. When it comes to understanding atmospheric processes, water.
By: Group 1 By: Group 1. At daytime, sunlight warms the Earth. Through conduction, air near the ground warms up.conduction conduction between the air.
Roadmap to the next 2015 run F. Marchetto GigaTracKer Working Group meeting Dec. 9 th 2014 a)Introductory meeting on Nov. 27, 2014 b)At that meeting several.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
Humidity The amount of water vapor in the air.. Expressed two ways Relative Humidity Dew Point.
Dew Point and Relative Humidity. What is Humidity? Humidity- the amount of water vapor (WV) in the air Relative Humidity- the % of WV in the air compared.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
A discrete event system: the CMS Tracker interlock Icaleps 2005 Icaleps 2005 Andromachi Tsirou, CERN The CMS Tracker interlock system The CMS Tracker and.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
S A Griffiths CM42 June 2015 Electrical & Control.
AIR COOLING & PROFILOMETRY OXFORD SYSTEM IMPLEMENTATION P.A. COE – OXFORD THURS 08 SEPT 2016 AIR COOLING & PROFILOMETRY.
Karlsruhe probe equipment and QA proposals/expertise
He Plant, LN2 Systems and Commissioing
Dielectric Oil Installations
Kröhnke, 14 November 2012 FCAL Collaboration Meeting Sergej Schuwalow
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
MEASUREMENT OF SPEED AND HUMIDITY
Weather Chapter 16 Notes.
ROD assembly and test in US
FNAL module testing summary
Pneumatic System Conditioning
Presentation transcript:

CMS Sensormeeting : Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) Mechanical Assembly ready Instruments: LCR, Electrometer, PS, Quasistatic CVmeter Probestation 2: 4“ (100mm * 100mm + 15mm Z) (IQC) Working ( old software version )! improvements planned: increase of max. movement  200m stage ordered 4“  6“

CMS Sensormeeting : Vacuum Chucks  4 individual vaccum systems to cope with the different sensor geometries  Masks for all sensors types to cover free vacuum channels  Actual chuck has a leak in the cooling channel  good a RT  Bias supply travels with sensor  System to spill air onto COLD sensors  We will build 3 improved versions beginning January.  Actual: one „WARM“ Chuck + intermediate chuck present

CMS Sensormeeting :  New Software 95% ready.  Switching Devices (3 of 4) ready  16 channels for each station.  New framegrabber cards (Nat. Inst. PCI 1408) + IMAQ VISION software; programming underway.  Storage present: large old metal chemical cubboard ~ airtight, flooded with dry air.  Piping system ready to be installed (partly done) (vaccum, cooling liquid, dry air)  Chiller present  Precision Hygrometer ordered, evaluation object tested (next slide)  RH in probestation goes down to 0.4% at RT and 4% at –10°C

CMS Sensormeeting : Hygrometer First instrument (shown at last meeting) is not sufficient for our purpose:  Precision only „good“ at a certain temperature, linear correction is not enough:  Readout jams the system because it uses the system interrupts (works fine but slowly under DOS)  New system:  Controls up to 4 sensors  RH; T, Dew Point + others  RS232 bus: unidirectional ASCI transmission  possible to readout with many PCS.  High Precision at all temperatures (2D correction matrix)  We tested it from RT to –10°C  Drawback: CHF 2000.– for Control + CHF 450.– each Sensor (add.10% rebate)

CMS Sensormeeting : Experience from first Irradiation and cold measurements  Cyclotron run successful.  Cool box during irrad. OK – still room for improvements!  Chuck has to be improved – principle is ok.  First strip measurements with bricolage cooling chuck done.  Humidity under control.  Two additional cold boxes for IV and CV are under construction.  Oven for annealing installed.  Yesterday ( Dec 5): first test with biased structures during Irrad.