Cryogenic Experts Meeting (19 ~ 20.09.2007) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR –

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
FAIR Synchrotrons SIS100/300
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Cryogenic Experts Meeting (19 ~ ) Heat transfer in SIS 300 dipole MT/FAIR – Cryogenics Y. Xiang, M. Kauschke.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Cryogenic Experts Meeting (19 ~ ) Helium distribution system for Super-FRS dipoles and multiplets MT/FAIR – Cryogenics and Magnets Y. Xiang,
Design pressure issues of Super-FRS dipole CrYogenic Department in Common System (CSCY), GSI, Darmstadt Yu Xiang, Hans Mueller* * Primay Beam Magnet Technology.
Raffael‘s Sixtinische Madonna in der Galerie Alte Meister in Dresden.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
LAUC Proposal: Feedboxes and System Engineering bnl - fnal - lbnl - slac US LHC Accelerator Research Program Michael Lamm LARP+LAUC DOE Review June 21,
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
General Considerations for the Upgrade of the LHC Insertion Magnets
Superconducting Quadrupoles inside the HERA Experiments M. Bieler, DESY, LHC LUMI 05 Workshop, Arcidosso, September The HERA Interaction Region.
Status of GSI-FAIR Project magnets - open issues - G. Moritz GSI CARE HHH AMT November
Road map of the workshop Machine availability: – “work-horse” in the injection chain – 100% availability not viable,.What is achievable? And at which cost?
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
The integration of 420 m detectors into the LHC
K H Meß AT-MEL CARE HHH-2004 Session2 Machine Protection 1 Machine Protection Can the upgraded LHC be protected? Scenarios Intensity upgrade (from 0.58.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
O. Kester, NuSTAR annual meeting, 27/02/2013
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
R. van Weelderen and U. Wagner CERN
SIS 100 Vacuum chamber Recooler String system Components
Cryogenic behavior of the cryogenic system
Quench Simulation at GSI
Hollow e- lens, Cryogenic aspects
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Outline: Why now ? What ? How ?
ILC Cryogenic Systems Draft EDR Plan
TEST PLANS for HL LHC IT STRING
Synchrotron Ring Schematic
Updated concept of the CBM dipole magnet
Some Thoughts on the JLEIC Ion Injector
Presentation transcript:

Cryogenic Experts Meeting (19 ~ ) Cooling scheme discussion for 300 Tm High Energy Beam Transfer line (HEBT) with large inclination MT/FAIR – Cryogenics Y. Xiang, M. Kauschke

Design constraints to helium flow in 300 Tm HEBT due to the tunnel with large inclinations; Simulation results on flow pattern analysis of two- phase helium flow in 300 Tm HEBT as the baseline design in FBTR; The single phase helium cooling scheme is to be presented together with one of the current feeding concepts; Conclusions Outline Cryogenic Experts Meeting (19 ~ )

300 Tm HEBT layout HERA type quadrupole HERA / UNK type dipole

Constraints given by the inclined tunnel for extraction One of the major constrains for magnet string design and layout; Inclination up to 6.6  (11.5%, 115 mrad ) for 300 Tm HEBT from SIS 300 to beam dump and CBM No such a big slope has ever been considered as constraints in the superconduting magnet baseline design for the existing large machines, e.g., HERA ring (6.3 km)  (1 %, max 10 mrad) LHC ring (27 km)  (1.4 %, 14 mrad) Tevatron (6.0 km), RHIC (3.8 km), Nuclotron (251.5 m) --- nearly horizontal Upper limit for using wheeled-vehicles for magnet installation % (2.3 , statement from Fermilab, "Design Study for a Staged Very Large Hadron Collider", 2001)

Design constrains to helium flow in magnet string with large inclinations One of the design experiences for two-phase helium flow in HERA proton ring: The JT expansion is done at the lowest point of each octant of HERA so that the two-phase flow in HERA magnets is always directed uphill to avoid the capture of bubbles. One-phase and two-phase helium flow arrangement (baseline design in FAIR Baseline Technical Report 2006)

Two-phase helium flow pattern in the inclined part of 300 Tm HEBT from SIS 300 to Beam Dump Too close to the transition boundary which means high risk of changing into unstable flow pattern We need another concept of cooling scheme!

Studies at CERN in A Possible Upgrade of the LHC Injection Lines (450 GeV) to 900 GeV using HERA Dipoles Injection lines between SPS and LHC are, TI2 (2.9 km with up-hill and down-hill slopes) --- steepest slope is 2.6%; TI8 (2.7 km) --- steepest slope is 3.77% One statement of the study, "The lines are characterized by a strong inclination (7.2% max slope)... The distribution to the magnets of liquid helium in strongly inclined channels and over a distance of several hundred meters represents a considerable cryogenic challenge." Such a study lets people to trace back another study which was done at CERN in earlier 1993 :

Single phase cooling schemeAlternative two-phase cooling scheme Studies at CERN in Design Criteria of the cryogenic system for the CERN LHC injection lines The authors proposed two cooling schemes for the inclined injection lines: Only the gaseous stream flows into a pipe thermally insulated from the existing channel Two single phase streams flow in a thermally insulated pipe inside the existing two channels to prevent possible heat transfer between forward and return streams Statements of the Study at CERN in 1993 : "The single phase cooling scheme adopts a cooling method different from that already operated in HERA. The alternative two-phase cooling scheme offers the possibility of developing a new challenging cooling scheme for SC magnets with two-phase flow over very long distances in strongly inclined channels. However, since it introduces several unknowns and “its feasibility is still doubtful”. Further tests are required before the solution can be seriously pursued."

Single phase helium cooling scheme for 300 Tm HEBT

Flow scheme of current feedbox for superconducting links (DFBL) for LHC If the concept that the current feedboxes are located close to the feeding points of the magnet string (LHC mode) inside the extraction tunnel is not a favourite solution for the power supply requirement at GSI, the recooler has to be integrated in the magnet cryostat design. No clear picture on this point at GSI up to now because of the uncertainty of cold link design.

Conclusions The numerical simulation shows the baseline of two- phase cooling flow scheme specified in FBTR for the 300 Tm HEBT magnet strings with strong inclinations has high uncertainty. The single phase cooling scheme which is based on the concept initiated at CERN for LHC injection lines has been presented for the 300 Tm HEBT magnet string. To start the recooler design, one needs the final decision of current feeding concept. Cryogenic Experts Meeting (19 ~ )