UF BIKE LANE ANALYSIS DECEMBER 2, 2013 KELSIE HOECHERL, MARIA MISSENA, & SOPHIA SAPORTAS.

Slides:



Advertisements
Similar presentations
West County Transit Enhancement Plan Tuesday, May 24, 2011 El Cerrito City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Advertisements

Possible Bike Sharing Programs in UCLA Given the Arriving Purple Line Subway Tsai-wei Wen Tsai-wei Wen Department of Public Policy.
City of Hubbard Transportation System Plan Update April 25, 2012.
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Electric-assist bicycle pilot use on multi-use paths City Council Second reading and Public Hearing October 29, 2013.
December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
GIS methodology for bicycle parking planning in BRT systems: Case study in Bogota - Colombia Daniel PáezUniversidad de los Andes.
Mainstreaming Cycling for All Nick Vaughan Transport for Greater Manchester Eleanor Roaf Sustrans Local Sustainable Transport Fund National Conference.
Sidewalk Bikeways: A Safety Problem, Not a Safety Solution.
Share the Road Lesson Plan. “Share The Road” Lesson Plan: Why??  Usually little or no training for cyclists, motorists, and pedestrians on safe interactions.
What is the Model??? A Primer on Transportation Demand Forecasting Models Shawn Turner Theo Petritsch Keith Lovan Lisa Aultman-Hall.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Land Use Impacts of Bus Rapid Transit: The Boston Silver Line Victoria Perk, Senior Research Associate National Bus Rapid Transit Institute Center for.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
Interchanges, Arterials, And Networks Last Week. Interchanges Freeway – Multilane highway Ramps and weaves are the same Problem comes in when you have.
From Island Estates Parkway to St. Johns County Line.
Bicycle Resolution Bicycles are a good thing. We should admit that they exist, and provide facilities for them. Every time I see an adult on a bicycle,
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
Cycling Safely Nottinghamshire County Council. Safer Cycling It’s not a toy… Your bike is not a toy! When you ride your bike you are a ‘road user’. This.
The Bicycle Policy of Copenhagen Clean Air Conference Turin, 25 and 26 Octobre 2002 Thomas Krag Mobility and bicycle planning advice.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
City of Leawood Bicycle Friendly Community The Year in Review.
WEBINAR Provisions for cyclists 06/06/2012 Fermín Echarte Peña Ayuntamiento Donostia - San Sebastian.
Bike Path Connectivity Carsyn Painter Natalya Morgan Bridget Wlosek Janna Bond.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
© Bishop’s Stortford Town Council Bishop’s Stortford Neighbourhood Plan Silver Leys and Meads Wards Draft Transport Stage One 5 February 2013.
The Bikers Convention By David Wilson Maintenance Officer.
Presented By Connor Mills, Jessica Diaz, Lily Wan, and Giuseppe Zuozo Assessing Bike Paths Evaluating the Current State of Bike Paths On- and Off-Campus.
Measuring Perceptions of Active Transportation at UCLA Tyler D. Watson, MPH PhD Student UCLA Fielding School of Public Health.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
The Main Street Bike Lane Project LADOT Bike Program.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Scrutiny Presentation Local Transport Plan and Active Travel Strategy 24 th October 2013 Andy Summers and David Burt.
Cycling in the 21 st Century: Developing a Bike-Friendly Community in Hartford, CT By: Alex Perez Trinity College 17’
A METHOD TO ASSESS COMPETING RISKS ASSOCIATED WITH PEDESTRIAN-ORIENTED ENVIRONMENTS Audrey de Nazelle and Douglas Crawford-Brown Department of Environmental.
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015.
West County Transit Enhancement Plan Monday, May 23, 2011 Richmond City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Bicycle & Pedestrian Safety on Campus Randolph Dillon English 106 August 4, 2003.
Global City Teams Challenge September 29-30, 2014 Report Out: Connected, Intelligent Transit Portland, Oregon.
What are Complete Streets?. Complete Streets place an emphasis on alternative modes of transportation being incorporated into the streetscape and design.
2016 Active Transportation Plan Goals, Objectives & Criteria Bicycle and Pedestrian Facilities Advisory Committee March 2, 2016 meeting.
PROMOTING BIKING AND WALKING AS FUN, HEALTHY FORMS OF TRANSPORTATION IN PHILADELPHIA ELEMENTARY SCHOOLS.
Elliot Road Extension design critique and recommendations Petition to the Town of Chapel Hill Bicycle and Pedestrian Advisory Board March 25, 2014 Geoffrey.
BUFVELO BICYCLE COURIER AN INTRODUCTION TO How Increasing Bicycle Infrastructure Improves Cities.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
A Waterloo Region Case Study.  Waterloo Region  Connecting residents to your work  Ideas start off small  Plan for change  Moving forward  Your.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
City of Belmont Comprehensive Bicycle and Pedestrian Plan Parks and Recreation Commission Meeting 11/4/2015.
Network Analyst. Network A network is a system of linear features that has the appropriate attributes for the flow of objects. A network is typically.
Bicycle Lanes for the City of Boston
Finance Committee & City Council October 10, 2016
REGIONAL BICYCLE AND PEDESTRIAN PLAN
GCAT i3 Committee Presentation
BICYCLE AND PEDESTRIAN MASTER PLAN FINAL PRESENTATION
Pedestrian & Bicyclist Crash Analysis
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Bicycle and Pedestrian Plan Vision/Goals/Objectives
Developing a Pedestrian -Bicycle Safety Action Plan
Engineered Scoring System for Bicycle Lane Mapping Development Pedro Zavagna, Mena Souliman  The University of Texas at Tyler, Departments of Civil Engineering.
Emily Guenther Zach Olson Laura Scott Cameron Wein
How effective are Bicycle streets? Gert Jan Wijlhuizen
Transportation Workshop
Design Standards.
Glossary of regularly used cycling terms
Safe Routes to School John Schaefer State Coordinator.
FREEWAY MANAGEMENT SYSTEMS:
What follows after approval of Active Transportation
The Use Of Hard Shoulders As A Turning Lane: A Safety Evaluation
Presentation transcript:

UF BIKE LANE ANALYSIS DECEMBER 2, 2013 KELSIE HOECHERL, MARIA MISSENA, & SOPHIA SAPORTAS

Policy 1.1.7: The University shall cooperate and coordinate with the City of Gainesville, Alachua County, FDOT and the MTPO to identify and implement means to improve bicycle facilities within the context area. IMPROVING BICYCLE TRANSPORTATION ON THE UNIVERSITY OF FLORIDA CAMPUS

Background Information UF Campus 2,000-acre campus 900 buildings Approximately 5,000 cyclists daily Research on pedestrian and bicycle behavior indicates: willing to walk 1,000 to 1,500 feet between destinations (5-10 minutes) will bicycle up to three miles Constraints to development Crashes by mode

Cycling Deterrents Security during allocated times Not enough information about regulations while riding a bike Limited connectivity Risks of crashing into pedestrians and cars Policy : Corrective measures shall be identified and implemented in areas that experience bicycle and pedestrian conflicts.

GOAL: Use GIS to analyze the existing bike lanes on the University of Florida’s campus and target the areas where cyclists do not feel comfortable sharing lanes with pedestrians or automobile traffic.

SHARING LANES UF cyclists surveyed said that 250 ft was the maximum distance that they felt comfortable riding next to a vehicle or pedestrian.

Proposal Plan 1.Target paths that cyclist feel uncomfortable riding along with pedestrians and vehicles 2.Identify heavy flow areas of cyclist on campus 3.Analyze intersections of these paths with heavy flow areas as gaps for bike lanes 4.Target zones that need improvement so that cyclist feel more comfortable; therefore, people get encouraged to ride their bikes to campus more often.

Data Defined Shared Use Paths: Paths shared between bikes and pedestrians as well as paths shared between bikes and vehicles. Bike Racks Inventory: Availability of racks on campus. Analyzed by usage UF Buildings: Buildings will be used as a reference for the areas that need improvement

Methodology Select by Attributes (Length) Share-Used- Paths greater than 250ft Select by Attributes (Description) Heavy Usage Bike Racks Clip intersection of buffers Select by Attributes Select by location (intersection of two layers) Highly affected Buildings/Zones Gaps greater than 250 ft UF Buildings layer Buffer by 200 ft Buffer by 150 ft

STEPS OF ANALYSIS

SELECTION: SHAREDUSE PATHS LAYER By attributes, we extracted paths with a length greater than 250ft.

SELECTION: BIKE RACK INVENTORY 2010 By attributes, we selected hose bike racks that were deemed “heavy usage” from NOTES06

BUFFERING THE SELECTED “HEAVY USAGE” BIKE RACKS WERE BUFFERED BY 150FT. AS DETERMINED BY RESEARCH ON WALKING DISTANCES.

BUFFERING SHARED USE PATH SELECTION BY 200 FT.

CLIPPING CREATED CLIP THAT SHOWS INTERSECTION BETWEEN THE SHARED USE PATH BUFFER AND THE BIKE RACK

SELECTION SELECTED BY LOCATION THE BUILDINGS THAT INTERCEPT THE CLIP

RESULTS

Conclusion There is a definite need to develop a safer way for cyclists to navigate around UF’s campus without pedestrian or traffic interference in heavy usage areas targeted: J. Wayne Reitz Union Chemical Engineering Building Chemistry Laboratory Residence Halls: o Hume Hall o Kenne Flint Hall o Angela Mallory Hall o Mary Reid Hall o Nancy Yulee Hall o Beaty Commons

SOURCES LANNING/CMP/MP0515/TRANSPO%2 0D&A.PDF LANNING/CMP/MP0515/TRANSPO%2 0D&A.PDF LANNING/CMP/MP0515/TRANSPORT ATION%20ELEMENT% PDF LANNING/CMP/MP0515/TRANSPORT ATION%20ELEMENT% PDF LANNING/CMP/ LANNING/CMP/ LANNING/CMP/MP0515/2_URBAN%2 0DESIGN%20D&A.PDF LANNING/CMP/MP0515/2_URBAN%2 0DESIGN%20D&A.PDF All screenshots are original work of the authors created through either ArcGIS or GoogleEarth and therefore their property. Only to be used with explicit consent.

QUESTIONS?