- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.

Slides:



Advertisements
Similar presentations
HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 03/0/2011 T9 transformation Repeatability test of experimental area.
Advertisements

TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
NA YETS: schedule week by week S. Evrard.
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
HIRADMAT IN THE WANF TUNNEL I. E FTHYMIOPOULOS, EN/MEF  HIRADMAT-Exp.Area Working Group  EN/MEF : I. Efthymiopoulos, A. Pardons, M.Lazzaroni, N. Gilbert.
CMS and Atlas cranes characteristics In the framework of WP8 TAS/Q1 region Gilles Roche & B. Feral – EN-HE-HM 02/06/2015.
HiRadMat hearing session: safety file HiRadMat Hearing session CERN, July 27, 2011 Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
Andre Henriques DGS/SEE LIU-PSB. S AFETY R EQUIREMENTS & S AFETY F ILE 14 TH F EBRUARY 2013 February 2013.
Remote Handling design progress for the Collimation Upgrade project Keith Kershaw EN-HE 6 June 2011.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
HiRadMat : report from WG2 – WANF dismantling WG3 - Irradiation Area October S. Evrard 1 WG2&3 meeting organization Preliminary WBS for related.
DGS/SEE Flammable Gas Safety – an update. DGS/SEE New Chemical Safety Rules New SR-C, Chemical Agents. GSI-C1, Prevention and Protection.
Lessons learnt from WANF (*) dismantling Outline  Introduction  WANF/HiRadMat location  WANF operation  WANF dismantling  Preparation  Dismantling.
SAFETY DOCUMENTATION: FOLDERS AND FILES IEFC Workshop CERN, March 7, 2012 S. Evrard – EN/MEF How useful is Safety Documentation for the general CERN population.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
1 1. Some recent views ( ) 2 Linac tunnel
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
HiRadMat Safety Register HiRadMat Review CERN, May 26, 2011 Outline  Guideline Documents  Hazard Inventory  Facility Risk Analysis  Risk Management.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
NA YETS: schedule week by week S. Evrard.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
H I R AD M AT SAFETY PREPARATION Follow-up meeting 14/07/2011.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Cryogenic safety organisation at CERN
Test beam check list Michael JECKEL EN-EA-EC.
Safety in the Neutrino Platform Hall
TE-MSC activities in SPS during LS2
FCC lifts Layout, characteristics etc.
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
HEL – Safety aspects Christelle Gaignant
Safety for the FCC Conceptual Design Report
EN-HE SPS works during EYETS
SPS Planning for the EYETS Meeting 9 (14/12/2016)
A very first look at siting issues
Cryogenic Risk Assessment in LHC
TE-MSC activities in SPS during YETS
IT-4328: Technical Specification
Radiation-safe area for electronics, or laser or
Experimental Areas – LS2 planning
Safety in the East Area Renovation Project
Presentation transcript:

- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative part  Operational part  Feedbacks  Other recommendations from safety review

S TATUS OF H IRADMAT SAFETY FILE 2 I - Descriptive part II – Hazards Inventory 1.Methodology 2.List of Hazards - Hearing Session - Marion Picard - July 28 th, 2011

H IRADMAT SAFETY FILE I - D ESCRIPTIVE P ART 3 - Hearing Session - Marion Picard - July 28 th, 2011 TABLE OF CONTENTS: 1.MOTIVATIONS AND GOALS 2.LOCATION AND VICINITY 3.TECHNICAL DESCRIPTION 3.1Beam line 3.2Experimental area 3.3Infrastructure 4.OPERATION LIFE CYCLE 4.1Assembly in BA7 lab 4.2Lab to test zone 4.3Test zone to cool-down zone 4.4Cool-down zone removal 4.5Irradiated experimental equipments 5.DISMANTLING PHASE & DISPOSAL 6.HAZARD INVENTORY

4 35-page content Safety oriented description 7 weekly meetings with DSO from BE and EN HiRadMat_descriptive_part_v2.0 in EDMS: Hearing Session - Marion Picard - July 28 th, 2011 H IRADMAT SAFETY FILE I - D ESCRIPTIVE P ART

1.Methodology: a.Scope of analysis: processes identification in HiRadMat 5 - Hearing Session - Marion Picard - July 28 th, 2011 H IRADMAT SAFETY FILE II – H AZARDS INVENTORY

6 - Hearing Session - Marion Picard - July 28 th, 2011 II – H AZARDS INVENTORY 1. A. P ROCESSES IDENTIFICATION

7 - Hearing Session - Marion Picard - July 28 th, 2011 … Basic Activity 7: Preparation crane for remote use … Basic Activity 8: Remote use of crane … … … Subprocess: Test table transport to cool down zone Basic Activity 1: Access in controlled area … … II – H AZARDS INVENTORY 1. A. P ROCESSES IDENTIFICATION Defined with operators

8 - Hearing Session - Marion Picard - July 28 th, 2011 Processes linked to the operationProcesses linked to the maintenance Tested equipment installation in labTNC relighting Table installationAUG tests Activated table handling to cooling areaPR532 maintenance in TJ7 Cooled table removal from TNCPR532 annual load test Containment + experiment separation from tablePR532 repair in TNC Gas and or vacuum connectionDrain network maintenance Gas and or vacuum disconnectionElevator & lifts maintenance Survey check of the 3 base tablesAir Handling Unit maintenance New cable pullingRadiation monitoring maintenance Plug-in system exchangeFire detection tests Patrol TNCDump and upstream collimator exchange HiRadMat procedures on processes during operation: EDMS HiRadMat procedures on maintenance: EDMS ● Creation of HiRadMat_Maintenance_Plan: EDMS II – H AZARDS INVENTORY 1. A. P ROCESSES IDENTIFICATION

9 - Hearing Session - Marion Picard - July 28 th, 2011 HiRadMat _Maintenance_Plan: ● Summarizes on which equipments, how often, who and how Equipments Type and frequency Personnel Procedure in EDMS 3.1 Fire detection testsPreventive: annual 2 operators from subcontractor 1 RP technician Absolute filters exchange in ventilation Preventive: check filter state 2 operators EN-CV 1 RP technician Evacuation of condensate water from dehumidification unit Preventive: check water level 2 operators 1 RP technician To be added 3.4 Dump and upstream collimator exchange Corrective 1 operator from EN- STI-TCD 1 RP technician Radiation monitors control Preventive: annual 2 operators 1 RP technician Material lift testsPreventive: quarterlyTo be added Elevator testsPreventive: monthlyTo be added Emergency, evacuation and regular lights replacement in TNC EL-OP, subcontractor Will be defined in VIC before 1 st intervention AUG testsPreventive: annual II – H AZARDS INVENTORY 1. A. P ROCESSES IDENTIFICATION

10 - Hearing Session - Marion Picard - July 28 th, Methodology: A.Scope of analysis: processes identification in HiRadMat B.Hazards identification on processes II – H AZARDS INVENTORY 1.B. H AZARDS IDENTIFICATION … Basic Activity 7: Preparation crane for remote use … Basic Activity 8: Remote use of crane Subprocess: Test table transport to cool down zone Basic Activity 1: Access in controlled area … …

11 - Hearing Session - Marion Picard - July 28 th, 2011 SAFETY FILE:LIST OF HAZARDS Process: HiRadMat operation Process n° 2.2 Subprocess: Test table transport to cool down zone Subprocess n° No. Work unit, tooling, material, substances Hazard Hazard Potential Safety rules known and available Rules covering the work Need for specialists HighLowYesNoPartly crochets de 13 kg du pont roulant sur palette et caméras en BA Accès en zone contrôlée BA1: Entrance/activity in controlled area Descente du matériel sur transpalette par le monte- charge BA7 Lifting and carrying loads (2x13 kg) x Personnel EN/HE from transport Lift transport limited in weight and size x Preparation remote PR- 532 BA7: preparation remote PR Installation manuelle des crochets intermédiaires sur le palonnier du pont roulant avec les blocages Hooks 13 kg at 1.50 m height x Crane operational procedure EDMS See (Manipulation by overhead craneman EN/HE) See (wearing IPE) x Remote use of PR-532 BA8: Remote use of PR Prise de la table dans les 2 anses avec les crochets intermédiaires See II – H AZARDS INVENTORY 1.B. H AZARDS IDENTIFICATION

HiRadMat_Hazards_Inventory in EDMS: Explains the methodology Summarizes the hazards on activities List of hazards in EDMS (sub-docs of Hazards_Inventory) : Associated with operation: Associated with maintenance: Hazards on basic activities: Hearing Session - Marion Picard - July 28 th, 2011 II – H AZARDS INVENTORY 2. L IST OF H AZARDS