PROPOSED CHANGES TO THE 2007 NATIONAL ELECTRICAL SAFETY CODE.

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

Wind Loads: The ASCE 7 Provisions
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
OSHA Region IV Electrical Outreach Construction Industry Photos 29 CFR 1926 Regulations.
2014 NEC Code Changes Ted “Smitty” Smith E Light Electric.
Heavy Equipment  Addressed under 1926 Subpart O: Heavy Equipment  All equipment left unattended at night, adjacent to a highway in normal use, or adjacent.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
CLIMBING SPACE Section 236
San Bernard Electric Cooperative, Inc. Arc Flash Assessment.
Welding, Cutting, & Burning. GENERAL HAZARDS General hazards of welding include: –Impact –Penetration –Harmful dust –Smoke –Fumes –Heat –Light radiation.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
1 Welding Module 10. 2Objectives After this module you should be able to – identify the most common welding hazards – take the necessary steps to avoid.
Networking the World TM 86 Leon Kempner, Jr., P.E. Bonneville Power Administration February 6, 2000 IEEE Three Second Gust Extreme Wind Speed Map, CP2363.
Rocky Mountain Power 2011 Clinic Dynamic Line Rating System Zhao Qi University of Utah.
Electrical Safety Training
“Standard for Electrical Safety in the Workplace”
CE 353 Lab 7: Rail Design Part 1: Train Acceleration, deceleration, and impact on Capacity Part 2: Design of a hump yard / classification facility Initial.
2010 Florida Building Code Wind Standard
2011 NEC ROP - CMP 5 Report to SCC 18
Case Study #2 Background You have selected your sub-contractors using your criteria in Case Study #1 and work will now begin The land has to be cleared.
Appendices Subpart R Steel Erection
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
UN ECE Sectoral Initiative on Equipment for Explosive Atmospheres 7 September 2011 United States Department of Labor Mine Safety and Health Administration.
Oregon Public Utility Commission Safety and Reliability Section Jerry Murray, Manager Bob Sipler, Utility Analyst What is an “Attachment”? … that’s easy!
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
14 th Edition of APPA Safety Manual Safety Manual Review of Changes John H. Borowski, CIH, CSP April 22, 2008.
February 24, 2015 First Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15 
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
IEEE Wind Farm Collector System Grounding for Personal Safety Summary of Topics.
1 Oncor Electric Delivery Proposed Changes To The 2012 National Electrical Safety Code.
 Welcome  Volunteer Advisory Committee ( ) Administrator: David Driver Assistant Administrator: Connie Muncy Content Coordinator:Mike Carter Secretary:
Electrical Safety.
Roadway Lighting on TxDOT Right of Way Greg Jones, EIT Master Electrician, State of Texas TxDOT, Traffic Operations Division, Illumination Branch.
1 Welding Module DISCLAIMER This material was produced under grant number SH from the Occupational Safety and Health Administration, U.S.
Storm Hardening Workshop Docket No Verizon Florida, Inc. July 13, 2006.
1a.  Exposed part  Live or energized part  De-energized part 1a.
2015 IEEE REPC Engineering Analysis of
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
STRUCTURAL ENGINEERING
NFPA 70E Electrical Safety in the Workplace. Objectives What NFPA 70E covers Understand Arc Flash, Incident Energy, & Flash Protection Boundary Standards,
Energy Cost Budget Highlights Jason Glazer, PE GARD Analytics Arlington Heights, Illinois Energy Cost.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
Chapter # 8 Mechanical Design of Overhead Lines.
OSHA Office of Training and Education
New CPUC Order on Pole Attachments Wireless West Conference Anaheim, California April 21, 2016 Charlotte F. TerKeurst Program Manager Electric Safety and.
National Electrical Safety Code 2017 SWEDE – Corpus Christi April 25, 2016.
Wood Truss Council of America Wood Truss Council of America Presents In Conjunction With...
Working On or Near Energized Conductors and FR Clothing.
Transfer Station Safety OR WORKER AND PUBLIC RISK.
Work Place Transport. Members of the BPF Health & Safety Committee.
©2011 Ohio Rural Electric Cooperatives 2012 NESC Update Changes to Work Rules.
Presented by Leighton Porter, EIT Monte R. Lee & Company
NFPA 70E: Standard for Electrical Safety in the Workplace
National Electrical Safety Code 2017
The influence of wind load on a suspended fiber optic cable
Manual on Accommodating Utilities in Pierce County Rights-of-Way
OSHA’s Final Rule: Electric Power Generation, Transmission, and Distribution Electrical Protective Equipment Presented to: RESAP Area Administrators Presented.
Electrical Safety.
TxDOT Utility Related Issues
Transmission Engineering
EET 323 – Electrical System Design Lecture 9: Grounding
The High Voltage Underground Cable Technician Inspector Training
Best Practices: Administrative Controls
Changes to Part 4 – Work Rules
Click anywhere to get started…
NESC Update Present & Future
Presentation transcript:

PROPOSED CHANGES TO THE 2007 NATIONAL ELECTRICAL SAFETY CODE

Time Schedule for 2007 Edition of NESC July 17, 2003Final date for receipt of proposals Oct. 5-24, 2003NESC Subcommittees meet Sept. 1, 2004NESC Preprints published May 1, 2005 Final date for receipt of public comments

Time Schedule for 2007 Edition of NESC Oct. 2-20, 2005NESC Subcommittees reconsider recommendations Jan. 15, 2006Proposed revisions submitted to NESC Committee for ballot May 15, 2006NESC Committee submits approved revisions to ANSI Aug. 1, NESC published

CP Section 2, Definitions Relocates and revises the definition of “readily climbable supporting structure.” Combines “readily climbable” and “not readily climbable” under one definition. Adds the notes that clarify what structures are considered not “readily climbable” to the code.

CP Rule 94B7, Directly Embedded Metal Poles Allows directly embedded metal poles to be an acceptable grounding electrode if: backfill is native backfill, concrete or conductive grout, embedment is > 5’, metal thickness is > ¼”, and any protective coating is conductive.

CP Rule 230, Uniform Clearance Calculations Moves current Rule 250 B, Figure and Table to new Rule 230. Retains the ice loading districts for determining clearances. Changes “loading districts” to “loading zones.” Wind loading values revert to 4 th edition values. Appendix B

CP Rule 230, Uniform Clearance Calculations Wind loading values revert to 4 th edition values. Wind values are 8 psf for Heavy and Medium; 10 psf for Light. The “adder constants” (0.3, 0.2 & 0.05) of Table were deleted. This will produce approximately the same sags as the lesser wind pressure in the 2002 edition with the adder constant.

CP Rule 232B3, Clearance to Support Arms, Switch Handles and Equipment Cases Adds switch handles to the rule. Requires a clearance of 15’ above areas accessible to truck traffic and 11’ under spaces and ways accessible to pedestrians if effectively grounded. Does not address switch handles not grounded. Excepts switch handles that “do not unduly obstruct a walkway.”

CP Rule 242, Grades of Construction for Conductors Requires conductors crossing navigable waterways requiring crossing permits to be designed to Grade B construction. Proposed because of downed overhead conductors hampering rescue craft during storm recovery efforts.

CP Revision of Sections 25, 26 & 27 Proposes incorporating the Reliability Based Method for determining structure loading. Consistent with ANSI/ASCE 7. New combined ice and wind loading map. Map based on 50 year ice and wind events. Provides a new formula for extreme wind. Eliminates the 60’ exclusion from extreme wind loading.

EXTREME WIND LOADING FORMULA Load in pounds = (V 2 ) (k Z ) (G rf ) ( I ) (F g ) (C d ) (A 2 ) = Ambient air density value V 2 = Basic wind speed in miles per hour (squared) Kz = Velocity pressure exposure coefficient. This value is defined in Tables & for open terrain and Tables & for sheltered terrain. Grf = Gust response factor defined in tables 250-1, , & I = Importance factor, 1.0 for utility structures and their supporting facilities F g = Factor for Grade of Construction (0.87 for C, 1.0 for B). Cd = Shape factor from Rule 252B2 (Rules N251A & 251B). A 2 = Projected wind area squared in square feet

CP Rule 250C, EXTREME WIND Limits extreme loading on structures < 60’. Limits V 2 k Z G RF to 15 psf for Grade C. Limits V 2 k Z G RF to 30 psf for Grade B.

CP Rule 250D, Construction and Maintenance Loads Where maintenance & construction loads exceed the wind and ice load: All conductor support points shall resist the bare conductor vertical loads expected to occur at sagging tensions times SF = 2. All structural members supporting linemen shall be able to support 240# vertical load in addition to the max loads during maintenance. When pulling thru stringing blocks, the pulling tension must be carefully controlled. If not, the pulling tension shall be applied to the block attachment point times SF=1.5.

CP Table 253-1, Rule 261A3, Table 261-1A, Fiber-Reinforced Polymer Structures Addresses the strength requirements and the strength factors for fiberglass poles and crossarms.

CP2622- Rule 351C, Location & Routing, Other Conditions In response to IR 524. Addresses the location of DB UG cable under an above ground pool. Recommends that DB UG cable should not be installed directly under buildings or other structures unless the structure is suitably supported to limit transfer of a detrimental load onto the cable.

CP Rule 410, General Requirements for Employers Requires that by 2009, an arc assessment be performed for employees that work on or near energized parts. If exposure > 2 cal/cm 2, FR clothing shall be worn. For V < 1000V, FR clothing with a min resistance of 4 cal/cm 2 shall be required. For V > 1000V, use Tables & or perform an arc hazard analysis to determine FR clothing requirements.

CP Rule 431C, Communication Antennas Prohibits workers from being exposed to radiation levels greater than those set forth by the administrative authority for 3 kHz < f < 3 GHz. OHSA , IEEE Std. C

QUESTIONS?