 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung.

Slides:



Advertisements
Similar presentations
Operadores de Contentores S.A.
Advertisements

Container Ship Construction
GREEN GLOBAL LOGISTICS VIETNAM (GGLC) GGLC - Your Reliable Partner NO.01, CAI LAN ROAD, BAICHAY, HALONG CITY, QUANGNINH PRO., VIETNAM TEL/FAX: (84) ;
ICTT Vallarpadam First Trans-shipment terminal in India.
SEE Port Development A Variation on the Story of the Rabbit and the Turtle Erich Cossutta, President Confindustria Serbia.
Development of the port of Poti by strategic investor in the post-crisis world by Andrii Kuzmenko Poti Sea Port Corp. – an APM Terminals company.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
PT Tangguh Samudera Jaya
CONTAINER TERMINAL FSC Container Terminal FSC Company Presentation December 2010.
Royalties for Regions – Information Briefing 10 October 2014 Presenter:David Horton Chief Operating Officer.
U. S. Coast Guard Role and Process for LNG Mr. Alan Moore LT Dan McLean
DEVELOPMENT OF THE GIURGIULESTI PORT COMPLEX. Giurgiulesti International Free Port ha, - has the status of a free economic zone - the oil terminal.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Restrictions LOA244 m Draught11 m Air Draught18 m.
Uniport Multipurpose Terminals B.V.
Facilitating trade growth and optimising operations at Port Hedland.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
CANADIAN COAST GUARD AUXILIARY - PACIFIC PASSAGE PLANNING CANADIAN COAST GUARD AUXILIARY - PACIFIC February 2012.
Lumsden Point Development
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
HOW DO YOU DESCRIBE A CONTAINERPORT? Henry S. Marcus Massachusetts Institute of Technology.
SHIPPING,TRADE TRENDS AND THEIR IMPACTS ON PORT INFRASTRUCTURE
Port of New Orleans Pat Gallwey Chief Operating Officer Port of New Orleans Counselors of Real Estate Oct. 13, 2009.
PORT EVERGLADES. 3.7 MILLION CRUISE GUESTS 6 MILLION TONS OF CARGO AND 924,000 CONTAINERS The total value of economic activity at Port Everglades in FY.
PORT OF SANTOS Sao Paulo / Brazil. Location LATITUDE: 23º57’ 3’’ S LONGITUDE: 46º18’ 6’’ W Time Zone: (UTC -03:00) Brasilia.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
1 REPUBLIC OF SUDAN MINISTRY OF ROADS & TRANSPORT SEA PORTS CORPORATION 7th PAPC Conference 2008,PMAESA Council & IAPH Africa-Europe Group MEETING
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
AFRICAN PORTS AND MARITIME CONFERENCE EASTERN & SOUTHERN AFRICAN CHALLENGES IN PORTS DEVELOPMENT CHALLENGES IN PORTS DEVELOPMENT PORT LOUIS HARBOUR Aruna.
Challenges Facing Ports Today Containership capacities and containership fleet continues to expand Global economic development leading to growing world.
Opening of the Panama Canal in 2016 Its Anticipated Impact on Global Soy and Grain Transportation Ken Eriksen Senior Vice September.
Transport and handling at CERN for FAIR
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
1. Sittwe Ch. 0.0 km Paletwa Ch. 158 Km Kaletwa (Ch 225 km Myeikwa (IM Border) Kyauktaw Bay of Bengal KolkataSittwe539 km SittwePaletwa158 km PaletwaKaletwa.
Intermodal Transport in the Republic of Slovenia Igor Prinčič, B.Sc. Undersecretary Republic of Slovenia, Ministry of Transport, Railways Directorate Intermodal.
Djibouti Ports – DP World Jérôme Martins Oliveira
April 29, 2004 Project Status Meeting Liang Y. Hsia, P.E. ITS Engineer Administrator Florida Department of Transportation.
A REVIEW OF MOMBASA PORT PERFORMANCE, CAUSES OF CONGESTION AND WAY FORWARD.
2  THE COUNTRY  ROAD TRANSPORT SYSTEM  AIR TRANSPORT SYSTEM  RAILWAYS SYSTEM  PORT LOCATION  PORT OF LUANDA  PORT OF LOBITO  PORT OF NAMIBE 
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Stewards of Tomorrow 1 THE PORT OF VIRGINIA: KEEPING VIRGINIA’S ECONOMY MOVING JOSEPH P. RUDDY CHIEF INNOVATION OFFICER MAY 19, 2016 JOSEPH P. RUDDY CHIEF.
Port of Black Sea Regional Conference 31 st October 2007 CONSTANTIN MATEI GENERAL MANAGER National Company “Maritime Ports Administration”
Contents  Port Side handling of containers  Issues  New Levels of service standards.  Increasing Terminal Capacities.
Finance Department Environmental Services City of Superior Superior Water Light & Power Wastewater Billing.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Market information day new vessel series “MPV-05 “
MUUGA CONTAINER TERMINAL.
Development of the Passenger terminal in Port of Bar
PART I Give yourself MORE CASH! PART 1 CASH Bonus Incentive JUNE 1-30 Consultants Managers and above PART 1.
Accelerator Module Test Facility
SAIGON NEWPORT CORPORATION
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
13-block rotation schedule
Constructing Climate Graphs
2018/2019 School Calendar July August September October November
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Thailand Inland Water Transport System
DEPARTMENT OF POLICE, ROADS AND TRANSPORT TRANSPORT INFRASTRUCTURE
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Operational Container General Cargo Dry Bulk Ferry Cruise
MONTHS OF THE YEAR January February April March June May July August
Damietta Container & Cargo Handling Co.
Introduction: Aden Container Terminal is the largest container terminal in Yemen and currently operated by the Aden Ports Development company (APDC). The.
2015 January February March April May June July August September
THIEN CHI’s delivery flow chart
Presentation transcript:

 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung tau.Tan Cang- Cai Mep is in the Tan Phuoc commune, Tan Thanh District, Baria Vung tau province  THE ACCESS CHANNEL: - The distance between bouy "0" and SNP's Caimep terminal is 18 n.m. According to the Maritime Notice No. 120/2007/TBHH- CTBDATHH II dated October 02, 2007 of the Maritime Safety Ensuring Company No.II, the channel passage between bouys No. 6 and No.8 with the length of 2,800m is the shallowest with chart datum of 8.8m only. -Without any channel dredging works, with the tidal difference exceeding 3.5m, on high tide, vessels with maximum draft of 12.2m can come to and from SNP's Caimep Terminal.

Connecting road - SNP closely coordinates with Baria – Vung Tau Province to ensure the traffic of the container trucks going along the 4 km road linking Tan cang- cai Mep terminal with National highway No 51 when the terminal starts its operation. - The 80% of the land clearance for the road No.965 leading to the Cai Mep ports under the management of PMU 85 has been done. The construction is expected to begin in September, The length of the road is nearly 8.5 kms with 32m in width available for 8 lanes It will take 2 years to complete the road. Connecting road Interflour Port Tan cang –Cai Mep Port

DREDGING -The Caimep channel dredging project will be managed by the Project Management Unit Nr. 85 (PMU 85) under the Ministry of Transport. According to PMU 85.According to PMU 85, the winner of the channel dredging tender will be announced at the end of August 2008 and the project will be officially started from beginning of September 2008 and completed after 18 months. At present, there are only two tenderers, TOA and DELTA, both are Japanese. -The final channel chart datum after dredging will reach 14m. -Break Ground Ceremony of Tan Cang- Cai Mep port: Jan 11, 2006

 Berths: - Length: 300 m - Starting day of construction: Jan 9 th Completed day: Aug 31 st Expected productivity per vessel: 3 cranes x 30 moves/crane -Expected operational time of Cai Mep- Phase I: First Quarter of Available for safety mooring of vessel having LOA of 300metre. -Water draft - Water depth at berth: 14.5 meter - Saigon Newport is opening tender for deepening water depth in front of Caimep berth. - The dredging works here will be started from August 15 and completed by November 30, The minimum warter depth at berth after dredging: 15.8m. Phase 1

 Capacity - Maximum vessel size: DWT (6.000 TEUs) Maximum Capacity: 600,000teus/ year  CY : 20 ha. The CY is now under the loading removal 7ha of the CY (Area A) will be completed on November 30 th 2008  Handling Equipment: Number of Quayside gantry cranes: 3 Post Panamax (KOCKS). Lifting capacity under spreader of 65 tons, Outreach: 50m. Twin- lifting The installation of the first two quayside gantry cranes will start on Oct 1st 2008 and complete in January, The third one will be available in March, 2009.

Rails and moorings at the berth in Tan Cang- Cai Mep terminal

 CY equipment:  10RTGs (KALMAR): 6 plus 1, 1 over 5 high.  The installation will be completed in February 2009  Software management system:  CMS: operational from Jan, 2009  : In September, 2008, SNP will release the tender documentation for the TOS (hardware & software).  The new TOS will go live from September, 2009  Tugboat: -03 tugboats – 2 tugboats of 4,000 HP each & 01 tugboart of 3,600 HP  Office buiding: The construction started in Jun, 2008  Gate: Construction starts in Sep, 2008, completed on 15 dec,  Receipt/ delivery procedures: completed in Sep, 2008

Berths -Berth length: 600 m (2 berths) - Starting day of Construction: end of The tender documents for the berth construction is now under the preparation.  CY: 40 ha -Estimated operational time of Cai Mep phase II: end of  Handling Equipment: - 6 post panamax quayside cranes. -26 RTGs 6+1 Phase 2