Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Mission: Design, implement and evaluate an industry led, fully funded statewide.

Slides:



Advertisements
Similar presentations
Waste is a Local Issue: Product Stewardship in the Northwest July 29, 2002 Shirli Axelrod Seattle Public Utilities.
Advertisements

Overview of the Draft Regional Master Plan Presented to the Solid Waste Management Coordinating Board October 26, 2011.
Product Stewardship Recommendations Report Solid Waste Management Coordinating Board January 28, 2009.
EESE O&E Committee Update & Next Steps May 14, 2010.
Department of Environmental Quality Environmental Management System Overview.
California Integrated Waste Management Board Contractor’s Report Framework for Evaluating End-of-Life Product Management Systems in California Presented.
Paint Product Stewardship Initiative December 9-10, 2009 Scott Cassel, PSI Executive Director/Founder.
Jennifer Volkman, Statewide HHW Program Coordinator Proud NAHMMA Member since 1995.
Paint Product Stewardship Initiative Presentation to Retailers Scott Cassel, PSI Executive Director/Founder December 13, 2007.
Meeting with IESBA CPAB Update Glenn Fagan and Kam Grewal April 7, 2014.
RFPs: Best Practices Presented by: Patrick Pearson, Government Banking David Bass, Consultant.
1 Vision Area of Focus Success Metrics* * All success metrics to be completed by Spring ’08. Commitments to ActionStatus Provide access to quality and.
Paint Product Stewardship Initiative Sacramento, CA April 15-16, 2004.
Bringing Paint Product Stewardship to California © 2009 by the California Integrated Waste Management Board (CIWMB)
CONVENIENCE ANALYSIS OF THE OREGON PAINT MANAGEMENT PILOT PROGRAM Hedrick Strickland Advised by Dr. Lynn Maguire and Matt Keene, US EPA.
Western States Energy & Environment Symposium October 27, 2009.
PaintCare Paint Stewardship Program Alison Keane, VP, Government Affairs, ACA General Counsel, PaintCare.
Funding Discussion State of Vermont Solid Waste Management Districts and State Programs.
May 3-4, 2006 PPSI Meeting - Sarasota FL1 Education Workgroup Team Members Heidi Sanborn, R3 Consulting/PSI – Facilitator Scott Cassel, PSI Alison Keane,
“ From Waste to Resource Management: A New Way of Thinking about Waste Services and Contracts” Materials Management Resource Recovery Process (Private.
Managing Post-Consumer Paint Alison Keane, Counsel Government Affairs National Paint and Coatings Association.
Paint Product Stewardship Initiative September 19-20, 2007 Scott Cassel, PSI Executive Director/Founder.
Lessons Learned on the Be Paint Wi$e Project: Transition to Statewide Product Stewardship © Copyright 2011 by the California Department of Resources Recycling.
Presented to: John Villyard CEO San Luis Valley Rural Electric June 21, 2004 The “Next Mile” Tech Ready Communities Pilot Project.
Education Work Group September 26-27, 2005 Portland Oregon Dialogue Meeting.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
Integrating Evaluation into the Design of the Minnesota Demonstration Project Paint Product Stewardship Initiative St. Paul, MN May 1, 2008 Matt Keene,
1 Introduction to Evaluating the Minnesota Demonstration Program Paint Product Stewardship Initiative September 19, 2007 Seattle, WA Matt Keene, Evaluation.
The Measurement and Evaluation of the PPSI Oregon Pilot Program Paint Product Stewardship Initiative Portland, Oregon December 10, 2009 Matt Keene Office.
Paint Product Stewardship Initiative Minnesota Demonstration Project Collection & Management Infrastructure Comparison April 30, 2008 MN PPSI meeting.
“e-cycle St. Louis – Building Regional Support” AIChE Virtual Meeting July 6, 2006.
PSI Fluorescent Lighting National Dialogue Meeting © Product Stewardship Institute, Inc. July 2008 Fluorescent Lighting Product Stewardship Initiative.
Pass it On National Conference On Reuse of Assistive Technology May 9, 2006 Atlanta, Georgia.
From Policies to Programs to Practices Establishing the Green Infrastructure Eric Friedman Director of State Sustainability Mass. Executive Office of Env.
Paint Product Stewardship Initiative Chicago, IL September 20-21, 2004.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Smart Grid Interoperability Panel & ISO / RTO Council Smart Grid Projects David Forfia SGIP Governing Board Member – Stakeholder Category 21 ISO/RTO Sponsor.
The Community Collaboration Coaches Roles, Strategies, and Tools.
Paint Product Stewardship Initiative Presentation to California Integrated Waste Management Board Scott Cassel, PSI Executive Director/Founder December.
September 26-27, Paint Product Stewardship Initiative Meeting #5 Portland Oregon.
Memorandum of Understanding to Develop A Nationally Coordinated Leftover Paint Management System California Integrated Waste Management Board - December.
Paint Product Stewardship Initiative Update – May 2007 PSI National Product Stewardship Forum California Integrated Waste Management Board – Glenn Gallagher.
Age & Disabilities Odyssey Conference Tuesday, June 21, 2011.
California Integrated Waste Management Board Contractor Report Framework for Evaluating End-of-Life Product Management Systems in California Presented.
Overview of the PSI Paint Product Stewardship Initiative May, 2010 Scott Cassel, Executive Director/Founder Product Stewardship Institute, Inc.
The OCIO/PSCD, in collaboration with the Advisory Board’s Long Range Planning Committee, developed this Strategic Plan to foster the leadership and.
Paint Product Stewardship Initiative Update for PPSI Participants April 18-19, 2007 Scott Cassel, PSI Executive Director/Founder.
Transportation Technology Exchange Globally Presented by: Kay Nordstrom U.S. Dept. of Transportation at U.S./East Africa Workshop Arusha, Tanzania August.
Thank you to our funder and sponsors.. © Product Stewardship Institute, Inc. November 2008 PSI National Dialogue on Fluorescent Lighting National Dialogue.
California Integrated Waste Management Board 1 Update on the Paint Product Stewardship Initiative March 17, 2009 Emily Wang Agenda Item 4
Integrating Evaluation into the Design of the Minnesota Demonstration Project Paint Product Stewardship Initiative St. Paul, MN May 1, 2008 Matt Keene,
Coordination in Action: Coordination in Action: Building a Camden County Travel Management Coordination Center August 8, 2007 Faith-Based Workgroup.
May 3-4, 2006 PPSI Meeting - Sarasota FL1 Paint Product Stewardship Initiative Dialogue Meeting Sarasota, FL May 3-4, 2006.
1 NPCA Board Resolution. 2 September 2006 – PPSI Meeting State and Local governments requested a decision from NPCA at its March 2007 Board meeting State.
1 CIWMB E-Waste Update CIWMB Working Group December 2001.
PPSI Oregon Pilot Program Update Call 12/2/09 Oregon’s Paint Product Stewardship Law : 1 st in the Nation Abby Boudouris HHW Coordinator Oregon DEQ Alison.
1 Paint Product Stewardship Initiative Update PSI Forum, June, 2008 Shirley Willd-Wagner California Integrated Waste Management Board.
PaintCare MRRA Conference | May 3, PaintCare Inc. o Non-profit 501(c)(3) organization o Created in 2009 in response to Oregon paint stewardship.
Paint Product Stewardship Initiative April 30-May 1, 2008 Scott Cassel, PSI Executive Director/Founder.
Update On Progress Of Developing A Nationally Coordinated Leftover Paint Management System California Integrated Waste Management Board - July 2007.
1 after legislation: evaluation for continued improvement in EPR programs 2015 NAHMMA Annual Conference September 16, 2015.
Mattress Disposal and Recycling Chris Hudgins MRRA Recycling and Solid Waste Conference and Trade Show May 3, 2016.
First Things First Grantee Overview.
First Nation Waste Management Initiative
Kathleen Amos, MLIS & C. William Keck, MD, MPH
California Used Mattress Recovery and Recycling Act
Product Stewardship Institute Advisory Council Meeting The Lenox Hotel – Boston, MA September 14, 2012.
Paint Product Stewardship Initiative
Plastics Sustainability within a Circular Economy
Presentation transcript:

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Mission: Design, implement and evaluate an industry led, fully funded statewide post-consumer paint management system that is cost effective and environmentally beneficial. 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Method: Utilizing data from the Paint Background Report, 1 st MOU Project Reports and other relevant information, the PPSI Stakeholders will oversee the design and implementation of a paint management system in the State of Minnesota from August 2007 to December 31, /20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Essential Goals: Consumers generate no or less waste paint Consumers generate no or less waste paint Statewide post consumer paint management is as economic and convenient as possible Statewide post consumer paint management is as economic and convenient as possible Paint industry assumes responsibility for statewide paint management by January 2008 Paint industry assumes responsibility for statewide paint management by January 2008 An increase in market demand for recycled paint products An increase in market demand for recycled paint products Fair compensation for post consumer paint collection sites Fair compensation for post consumer paint collection sites Post consumer paint is managed as a resource, economic and environmental value is recovered Post consumer paint is managed as a resource, economic and environmental value is recovered The Minnesota paint project is a collaborative process The Minnesota paint project is a collaborative process The statewide system is transferable, replicable and relevant to other states The statewide system is transferable, replicable and relevant to other states 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Objectives: Environmentally Beneficial Post consumer paint is managed according to the waste hierarchy – reduce, reuse, recycle. Economical The paint management system will be as economically viable as possible, including but not limited to, aspects such as management methods, overhead costs, recycling, and new market niche ideas. High Recovery Rates Sufficient infrastructure and effective consumer education produce a high rate of post consumer paint recovery with a realistic short term and longer term measurable goals. 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Objectives Cont.: Replicable and Relevant Template of infrastructure, education, reuse, recycling, fee mechanism options, etc., that are useful to all stakeholders and proven effective. Fully Funded Coordinated system costs are identified and fully funded according to the National System Elements Matrix. Industry Led Paint Stewardship Organization A paint stewardship organization is established and responsible for aspects of leftover paint management. 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Stakeholder Governing Structure & Roles Governing Structure: Oversight Committee – establish criteria for decision making, bringing back to larger stakeholder group, etc. Oversight Committee – establish criteria for decision making, bringing back to larger stakeholder group, etc. Work groups – name them Work groups – name them Protocol – decision making, communication with groups Protocol – decision making, communication with groups Auditing – by independent entity Auditing – by independent entity 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Stakeholder Governing Structure & Roles Roles: PSI – facilitated establishment of roles on 9/19/2007 PSI – facilitated establishment of roles on 9/19/2007 Coordinator – facilitate, oversee, monitor MN “on the ground” work, communicate with stakeholders (including MN stakeholders), contact oversight committee, facilitate conference calls (MN Project) Coordinator – facilitate, oversee, monitor MN “on the ground” work, communicate with stakeholders (including MN stakeholders), contact oversight committee, facilitate conference calls (MN Project) 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Stakeholder Governing Structure & Roles Roles Cont.: MN Project Stakeholders (Steering Committee?) MN Project Stakeholders (Steering Committee?) Retailers – potential for voluntary collection points, educate customers, participate in co-op promotion of recycled paint Producers – timeline of responsibility, establish fee for ongoing funding, establish PSO, project leadership and staff, etc. Recyclers – paint markets, points of sale, new partnerships State and Local Government – regulate recycling, appoint auditor, make existing infrastructure available, procure recycled paint Committees – work on specific projects – evaluation, create templates for other states to use, oversight Advisory Representatives (Canadian PS Organizations, steel institute?) – provide feedback, new ideas Non-MN State and Local Representatives 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations PSO What does it take to create a PSO? Review of existing elements of PSO - Product Care, Eco-Peinture, others? Review of existing elements of PSO - Product Care, Eco-Peinture, others? 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Inventory of MN infrastructure Existing Programs – do inventory on paper, visits, photos Local feedstock Local feedstock Areas of missing or inadequate collection infrastructure, education, recycling Areas of missing or inadequate collection infrastructure, education, recycling What’s working well? What’s working well? What’s not working well? What’s not working well? Education Education Participation rates, population make up (rural, educated, long time programs, etc.) Participation rates, population make up (rural, educated, long time programs, etc.) History of HHW programs History of HHW programs Quantify baseline aerosols and paint containers, methods of management Quantify baseline aerosols and paint containers, methods of management 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Management Program efficiencies to examine: What should we look at for efficiencies? Examine government collection programs Examine government collection programs Methods of management Methods of management Overhead costs Overhead costs Reuse program costs/benefits Reuse program costs/benefits New infrastructure costs/benefits New infrastructure costs/benefits Retail foot traffic Retail foot traffic Retail customer loyalty – market niche Retail customer loyalty – market niche Transportation Transportation 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Education Kiosk Kiosk Point of purchase literature, posters, clerk training Point of purchase literature, posters, clerk training Website Website Media opportunities – home expo fairs, Martha Stewart, home how-to shows, local press Media opportunities – home expo fairs, Martha Stewart, home how-to shows, local press 3E – training at big box stores 3E – training at big box stores Government sites – libraries, HHW facilities, governmnet buildings Government sites – libraries, HHW facilities, governmnet buildings Presentations – conferences, meetings Presentations – conferences, meetings Focus groups for source reduction messages 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Local MN Implementation – identify local partners and structures, local paint council –Association of MN Counties –HHW program managers –Retail associations –Media Communication to all stakeholders – how often, substance, form (written, presentations, calls, newsletter), applications (board report, newsletter, layers of government) 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Evaluation 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Funding – determine funding Elements to be funded Recycling – PLP, paint Recycling – PLP, paint Direct and indirect collection point costs at new and existing sites Direct and indirect collection point costs at new and existing sites Determine likely schedule of payments including leftover paint collection points Determine likely schedule of payments including leftover paint collection points Mechanics of fee collection Mechanics of fee collection Create system – forms, reports, transparency Create system – forms, reports, transparency Proxy system funding process Time line Time line Phased approach? Phased approach? Disbursement and reimbursement mechanics Written agreements Written agreements Measures for accountability Measures for accountability Develop overall project budget 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations MN should provide a basis to create templates for other states. What do you want to see? 9/20/07 PPSI Dialogue, Seattle

Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Timeline – examples to plug into calendar Establish oversight committee and ways to communicate Establish oversight committee and ways to communicate MN infrastructure – choose target collection sites and volumes MN infrastructure – choose target collection sites and volumes Connect with local programs and establish new collection sites – municipal, fire station, landfill, willing retail Connect with local programs and establish new collection sites – municipal, fire station, landfill, willing retail Create reporting methods – volumes Create reporting methods – volumes Reevaluate methods Reevaluate methods Examine appropriate collection and other baseline costs Examine appropriate collection and other baseline costs Reevaluate costs if necessary Reevaluate costs if necessary PSO business plan drafted PSO business plan drafted PSO in place and operational – staffing, collecting fee, working with recycler, etc. (could be phased) PSO in place and operational – staffing, collecting fee, working with recycler, etc. (could be phased) Education (various media) in place Education (various media) in place EPP mandates at state? Other market support EPP mandates at state? Other market support Commence feedstock examination – bulking vs. non Commence feedstock examination – bulking vs. non Transportation issues – demonstrate milk run, rural collection, consolidation points Transportation issues – demonstrate milk run, rural collection, consolidation points State contract – examine, propose changes, commence changes State contract – examine, propose changes, commence changes Create audit tool Create audit tool Final report Final report 9/20/07 PPSI Dialogue, Seattle