CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
CLIC RF structure master schedule and CERN production
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Investigation threads on fabrication technologies for the CLIC X-band Accelerating Structures C. Rossi on behalf of the CLIC X-band Activity Thanks for.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Team: Wolfgang Burkert, Haimo Jöhri, Uwe Barth Mechanical precision and vibration behavior of mechanical supports Johan Wickström GFA-ATK.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
TM0 components inventory and procurement schedule In LAB testing facility A. Bartalesi.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
TBM Vacuum considerations Alex Vamvakas 15/07/2015.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Walter Wuensch SAREC review meeting30-31 January 2012 Direct measurement of the transverse long-range wake-field of the CLIC main linac accelerating structure.
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
LCWS11 WG4 Fully featured accelerating structure engineering design
Assembly of the doorknob
Update on the DB Girders FE Analyses
Baby-MIND Modules & Services
CERN – Zanon discussions
new straw end plug: D=10.6 mm straws support frame Levan option
F.E.T.S. Mechanical Engineering Update
Complementary ISTC Projects #3888, 3889p
INSTALLATION SEQUENCE
IR Detector - Test cryostat : Machining
XFEL Collimation and Beam Switchyard Vacuum Issues
IHEP Cryomodule Status
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
LARP Phase II Secondary Collimator RC-1
Cryomodule Assembly Plan
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
BGC Collaboration Meeting –
Beam Finder Wire (BFW) Status
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
SNS PPU Cryomodule Space Frame
Presentation transcript:

CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012

CLASSE prototype: CATIA model (1/3) 6 sections, 26 cells each, compact coupler design Clamped aluminum disks Ø180mm (x6)TD26 with Compact Couplers Cell shape accuracy 20µm Aluminium disk Damping material (SiC) Threaded rod for disk clamping Corner for SiC fixation Al disk Features for Tank alignment on the girder Features for AS alignment in the Tank Reference spheres AS A. Solodko, CERN Beam

CLASSE prototype: CATIA model (2/3) A. Solodko CERN

Frames for AS fixation Screws for vertical AS alignment (x5) Blocks for horizontal AS alignment (x4) CLASSE prototype: CATIA model (3/3) A. Solodko, CERN Estimated total load of the CERN installation is about 400 kg Two vacuum ion pumps (noble diode pumps, 53 l/s) The RF structure is aligned mechanically inside the vacuum tank The vacuum tank will be aligned to the beam axis by means of adjustable feet Two tooling balls on both ends are present on top of the vacuum tank

CLASSE drawing A. Solodko, CERN

Existing girder (a) Clamps (b) LI02 sector: location of ASSET test

Questions and remarks Deadline - supposed date for the installation. SLAC expert contact for integration check. Needed alignment features on the tank. Possibility to use existing strongback alignment features should be checked taking into account the weight of the tank (400 kg). Drawings or sketches if they exist. Value for alignment. What is the alignment procedure at SLAC and there will be a check of AS alignment into the tank at SLAC? Is manpower available? Bellows should be fabricated and inserted to cover  25cm length. Two ion pumps (53 l/s) are required. Can SLAC provide them? If so, which type of flange do we need? The AS will be aligned and fixed into the tank at CERN. After that will be shipped at SLAC. Compatibility of.stp file with the up-to-date SLAC layout The final drawings should be commented by SLAC colleagues (as soon as they will be finished).