1 RIC 2009 Engineering Issues Design Acceptance Criteria Laura Dudes Deputy Director, Division of Engineering NRO/DE March 11, 2009.

Slides:



Advertisements
Similar presentations
Module N° 1ICAO State Safety Programme (SSP) Implementation Course 1 Module N° 1 Introduction to SSP implementation course Revision N° 5ICAO State Safety.
Advertisements

New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
Independent Communications Authority of South Africa Bidders Compulsory Briefing Session Presenter: Irene Matsimela Bid Administrator 15 November 2012.
Enterprise Project Portfolio Management Solution RAF/2014/00012 Compulsory Briefing Session 31 March 2014 Centurion.
New Reactor Activities Joseph Colaccino, Senior Project Manager Division of New Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory.
1 RIC 2009 Federal Emergency Management Agency (FEMA) Activities at Nuclear Power Plants Session Chairmen: Mel Leach Director, Division of Preparedness.
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
 Changes for  Required Presentations  Certification prior to the end of class  Certification after class.
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
Heliocentris Commercial Confidential 1 Integration of Industrial Fuel Cells in Technical Applications Using the NEXA ® Training System Dr. Claus Fischer.
Class #9 Magnificent Seventh Feburary 1 CBO Mentor Project.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Allen Hughes State Materials Office
1 A Dialogue to Raise Awareness of Operating Nuclear Power Plant Issues RIC 2009 Regional Breakout Session A Dialogue to Raise Awareness of Operating Nuclear.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Module N° 1ICAO Safety Management Systems (SMS) Course 1 Module N° 1ICAO Safety Management Systems (SMS) Course 1.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
1 RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation George Wilson NRR/ADES/DE/EEEB March 11, 2009.
UKCC Level 2 Certificate in Coaching Rugby League Welcome 1.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
New Reactor Construction Inspection
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
1 Moving Forward with the USEPR Greg Gibson Vice President Regulatory Affairs.
1 RIC 2009 Perspectives on Digital I&C Licensing in the 10 CFR 52 Environment Thomas R. Fredette, PE NRO/DE/ICE2 March 11, 2009.
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
th Annual PABUG Conference MESSAGE SOLUTION WITH RHACOMM Judy Strauser Director of Operations, Financial Aid Swarthmore College.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
1 EVALUATING DIVERSITY IN DIGITAL I&C SAFETY SYSTEM DESIGNS Michael E. Waterman Digital Instrumentation and Controls Branch Division of Engineering Office.
1 RIC 2009 Design Acceptance Criteria: Searching for Acceptance Andrea Sterdis Tennessee Valley Authority March 11, 2009.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
RIC 2009 Human Factors DAC/ITAAC Reviews Michael Junge USNRC/NRO/DCIP March 11, 2009.
3 CDBG Disaster Recovery Waterway Debris Program Wednesday, January 13, 2010.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61
10 Stages Of the Engineering Design Process
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
NRC’s Category 3 Source Security and Accountability Initiatives
NRC’s LLW Regulatory Program: Update of Emerging Issues
Update on Category 3 Source Security and Accountability Initiatives
Enterprise Project Portfolio Management Solution RAF/2014/00012 Compulsory Briefing Session Centurion 31 March 2014.
Test Administration & The TA Sites.
Nuclear Power Update for The Society of American Military Engineers
Engineering Design Process
National Wildfire Coordinating Group
Welcome Back! 2016 – 2017 School Year Ms. Johnson Biology.
Dr. Nils J. Diaz 28th Annual Bonbright Center
Overview of NRC Low-Level Waste Activities and Initiatives
10 Stages Of the Engineering Design Process
10 Stages Of the Engineering Design Process
8th Grade Washington DC Trip
10 Stages Of the Engineering Design Process
Adding Nuclear Power to the Grid
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Margin Management Configuration Management Benchmarking Group
The Design Process.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Anna Bradford, Deputy Director Division of New Reactor Licensing
RESOLUTION OF GENERIC SAFETY ISSUE 191
Posting Job to CollectiveNet
Presentation transcript:

1 RIC 2009 Engineering Issues Design Acceptance Criteria Laura Dudes Deputy Director, Division of Engineering NRO/DE March 11, 2009

2 General Session Information Badges and Identification – Please remember to visibly display name badges throughout the duration of the RIC. Cell Phones and Pagers – At this time, please turn off or silence cell phones and pagers. Presentation Materials – All provided electronic presentation materials will be posted on the U.S. NRC RIC website at keyword: RIC. Evaluations – Please provide us with your valuable input via the Session Evaluation Form or comments directly to

3 Background SECY defined DAC as: –... “a set of prescribed limits, parameters, procedures and attributes upon which NRC relies, in a limited number of technical areas, in making a final safety determination to support a design certification.”

4 Background (cont.) SRM to SECY provided NRC policy on use of DAC: - Will not complicate the design process - COL holder can meet prior to fuel load - Can be objectively verified - Limited to rapidly evolving technologies or design areas for which as-built/as-procured information is not available

5 The Ideal… DC applicant provides a complete and final design. NRC certifies. COL applicant references the certified design and provides site specific information and operational programs. NRC licenses. COL holder constructs the plant and completes ITAAC. NRC verifies.

6 The Reality… Rapidly changing technology would render some aspects of a design solution obsolete Level of detail not possible to provide until selected components are procured Enter - Design Acceptance Criteria

7 Process Options Option A: Resolve through an amendment to the original design certification Option B: Resolve through a review of the Combined License application Option C: Resolve through implementation of ITAAC