1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Nuclear Energy Standards Coordination Collaborative (NESCC) November 29, 2012.

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

Perspective on the ASTM Roadmap for Supporting Civil Nuclear Energy Plants Workshop on Emerging Trends in Nuclear Energy – The Standards Component June.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants Electrical Cable Task Group (ECTG) NESCC Update: 7 November.
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Opportunities Exist to Strengthen FHWAs Coordination Guidance and Oversight of the Tribal Transportation Program October 30, 2013.
1 Implementation Status of the U.S.-IAEA Additional Protocol Thomas Grice NMMSS Users Meeting May 20, 2009 Denver, CO.
ASME SMR ROADMAP (STP-NU-072)
1 Current Reviews of Standards by NRC Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) November 7, 2013.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
Cumulative Impacts James Slider November 7, 2013.
November 7, Topics NESCC 2013 Survey – review of results Buried pipe coatings Seals for doors and penetrations to prevent flooding NESCC discussion.
1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants Electrical Cable Task Group (ECTG) Co-Chairs: Dr. Stephanie.
ASTM International Nuclear Initiatives Roadmap Steve Byrne and Joe Koury March 2013.
Concrete Codes and Standards for Nuclear Power Plants (CTG) Chiara Ferraris, NIST Chairperson.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Seismic Instrumentation and Monitoring Needs of US Nuclear Power Plants Dr. Annie Kammerer Seismic Instrumentation Technology Symposium November 2009.
Overview of NSF Standards Process and Joint Committee Formation Sustainable Water Contact Products Stakeholder Meeting October 30, 2012.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
JK August, ANS/Chair ANSI Washington DC March 28, /28/2013 NESCC Standards Meeting ANSI Washington, DC1.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
IAEA International Atomic Energy Agency US NRC Approach for Seismic Hazard Assessments INTERNATIONAL WORKSHOP ON LESSONS LEARNED FROM STRONG EARTHQUAKES.
Electrical Cable Aging and Condition Monitoring Codes and Standards for NPPs Dr. Stephanie Watson Engineering Laboratory NIST 100 Bureau Drive, MS 8615.
NRC Endorsement of Standards
Repair of Reinforced Concrete of Existing Nuclear Power Plants (RCTG) Chiara Ferraris, NIST Nathan Sauer, SIMCO Technologies.
National Institute of Standards and Technology Information Technology Laboratory 1 USG Cloud Computing Technology Roadmap Highlights NIST Cloud Computing.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
NCHPS Fall Meeting CFR Part 37 Update. Reference: IMPLEMENTATION GUIDANCE FOR 10 CFR PART 37 PHYSICAL PROTECTION OF BYPRODUCT MATERIAL CATEGORY.
PROCESSES AND ISSUES TO CONSIDER ON WHETHER OR NOT TO AMEND AGREEMENT STATE STATUS Uranium Working Group August 2, 2012.
November 7, Status * Concrete Repair Report was published in August * Included 40 recommendations for: * Revisions to standards. * New standards.
Public Law Update Tyson Whitney Office of Federal Financial Management Office of Management and Budget August 30, 2006.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants March 28, 2013 Electrical Cable Task Group (ECTG) Lead: Dr.
Conformity Assessment Overview Nuclear Energy Standards Coordinating Collaborative November 2009 Gordon Gillerman Chief Standards Services Division National.
NMMSS Users Meeting Las Vegas, NV May 20, 2010 Status of the U.S. Nuclear Regulatory Commission’s Implementation of the U.S./IAEA Additional Protocol.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) July.
1 Standards Database Initial Development Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) March 1, 2011
1 RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation George Wilson NRR/ADES/DE/EEEB March 11, 2009.
Electrical Cable Aging and Condition Monitoring Codes and Standards for NPPs Dr. Stephanie Watson Engineering Laboratory NIST 100 Bureau Drive, MS 8615.
1 Meeting on April 18, 2013 Washington DC Workshop on a Joint HDPE Roadmap for Current and Future Service.
Status Report: Welding Task Group Report to NESCC – 23 July 2013 Tom Siewert – NIST
PH 8.01/99 - Seminar, Brussels, 9 November 2005 PH 8.01/99 – Seminar on “Dissemination of PHARE projects description and results” Overview of BG PHARE.
ABNORMAL OCCURENCE REPORTING: PURPOSE, USES, and PROCESS Angela R. McIntosh Abnormal Occurrences Coordinator Office of Federal and State Materials and.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
Federal Energy Regulatory Commission FERC Information Assessment Team (FIAT) Implementation.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Technology Services – National Institute of Standards and Technology Implementing the National Technology Transfer and Advancement Act in the Federal Government.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
March 10, 2011 RITA’s Research, Development & Technology Knowledge Management System Alasdair Cain, Transportation Specialist, RITA Research, Development,
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
EIF Updates for Energy Industry Fundamentals Statistics  As of the end of May, there are 29 approved providers nationally and 7 in Florida  Nationally,
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
Standards Coordination Office NIST presentation to the FGDC September 25, 2014.
James Shaffner, Project Manager
Updating the NRC’s Alternative Disposal Request Guidance Document
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
Regulatory Guide 1.21 – Reporting of LLW shipped
NRC’s LLW Regulatory Program: Update of Emerging Issues
LLW Forum Meeting October 17, 2017 Alexandria, Virginia
Adding Nuclear Power to the Grid
NRC Oversight on Storage of Special Nuclear Material
CRCPD Update Presented to the National Radiological Emergency Preparedness Conference May 2004.
Presentation transcript:

1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Nuclear Energy Standards Coordination Collaborative (NESCC) November 29, 2012

Task Group Overview Develop a modern searchable relational database to catalog 10 CFR and the current suite of NRC regulatory documents for citations of consensus standards. The database is intended to be used by the nuclear industry and NRC to assess currently cited standards to support certification of designs and development of licensing documents. The database is intended to be used by Standard Development Organizations (SDOs) to identify where and which version of their standards are cited in regulatory documents. Possible future expansion of the database for use in cataloging nuclear related standards currently under development by SDOs, plant-specific documents, such as COLAs and DCDs, and other licensing and design documents. 2

3 Current Status Data mining of Regulatory Guides through summer 2012 Revised Inter-agency Agreement and sent additional funds to NIST in October 2012