Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.

Slides:



Advertisements
Similar presentations
Public Private Partnership Investment and Construction Armando R. Araujo Cairo 2003.
Advertisements

The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Contract & Risk Management Process. Structured process to develop bespoke contracts from standard models initially for strategic direct materials, later.
Structuring Nuclear Projects for Success An Analytic Framework Presented by: Didier Beutier, Vice President for Economic and Prospective Studies, Areva.
Symposium on Private Financing for African Power Infrastructure US Treasury Department Washington, DC October 13, 2008.
InfraCo Limited Project Structures to Mitigate Risks and Access Capital Regional Electricity Investment Conference September 2005 Windhoek, Namibia.
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
GPA Renewable Energy Resource for Guam Power Authority
Technologies Waste to Energy JP Hoffman Siemens.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Simon Par Keeling, Société Générale Paris
Insight Conference How to Profit from the Business of Renewable Energy October 20, 2003, Hilton Toronto SMS Energy-Engineering Inc. Safouh Soufi.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
The Caribbean Renewable Energy Development Programme, CREDP Roland Clarke, Ph. D. Project Manager, CREDP Tel: thru 9 ext. 2631
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Financing Urban Public Infrastructure
INVESTMENT AND FINANCING OF RENEWABLE ENERGY PROJECTS
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
International Investment Funds in Bioenergy and Energy Efficiency Susan Legro, Eco Ltd. “Issues and Solutions in Bioenergy….” December 11, 2007 Minsk.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
Chapter 16 Capital Goods McGraw-Hill/Irwin Purchasing and Supply Management, 13/e © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
No part of this report may be circulated, quoted, or reproduced for distribution without prior written approval from KenGen. All the information contained.
Biofuels - Systems Integrator Perspective Lockheed Martin Helping shape our energy future Stephen Klotz, PhDApril 21, 2011 Copyright © 2011 by Lockheed.
Financing of Infrastructure Projects:
FINANCING WIND POWER PROJECTS. Project Financing is the financing of long term projects based upon a complex financial structure where project debt and.
H11.pE-3.0 Welcome Master of Project Management / International project contracts - r 1.1 – slide 1 International project contracts E.S.C.T
Public Private Partnerships in the Baltics and Europe Vilnius, November 2006 I. The Energy Sector in the Baltics 3. Renewable Energy Transactions.
Project Development Decision Tree PermittingIn-house Reqmts.Energy SalesFuel Consumption Plant Configuration Risk AssessmentCapital Costs Schedule Constraints.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
1 ASIA BIOMASS WORKSHOP 2007 BANK PEMBANGUNAN MALAYSIA BERHAD FINANCING FOR BIOMASS AND RENEWABLE ENERGY ROJECTS.
12/5/2003Global Energy Concepts, LLC1 of 11 Characteristics of Financeable Wind Energy Projects Northwest Power and Conservation Council Workshop on Wind.
DOE OFFICE OF INDIAN ENERGY Step 5: Project Operations & Maintenance (O&M) 1.
ANATOMY OF A DEAL: FINANCING Peter Y. Flynn, Bostonia Partners.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
The project finance termsheet Broad characteristics: 12 mln USD for expansion of power plant. Two year grace (construction) period, reimbursement over.
Energy for the Future Belene Nuclear Power Plant Project Status.
Procurement Part Two Marketing Logistics Purchasing Decision Variables: How to Rate Suppliers.
Weyerhaeuser CHP Project NWPPC CHP Roundtable June 24, 2003.
APPLYING RISK MANAGEMENT STRATEGIES PRUDENTLY Paper No 192 Presented At 2011 ICHS Conference September 13, 2001 By Michael Pero, P.E. – Director of Risk.
Municipal Solid Waste Power Plant Project DL ENT Co., Ltd.
1 Financing sustainable development Role of Banks Key financing prerequisites Major project parties “Hybrid” Models Demand side management Conclusions.
Risks for Investment in Hydropower Sector in Nepal; Developers’ Perspective Power Summit 2008 Kathmandu, Nepal September 24th 2008 Presented by: Dr. Sandip.
Use of Islamic Finance in PPP Energy Projects (Case: Ijara for IPP) Fida Rana PPP Investment Lead Hassan Idirissi Legal Counsel Islamic Development Bank.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
Total Cost of Ownership: Considerations
Key risks and challenges of VAT
Insert your presentation title here MICHAËL DE GROOT
WORLD BANK Harmonized SBD-Works
Makerere University Investors Conference
Enron Energy Services Energy Management Outsourcing Overview
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Insert your presentation title here MICHAËL DE GROOT
Infrastructure Development in India: Opportunities for Co-operation with Europe Presentation by Mohit Saraf Partner Luthra & Luthra Law Offices.
Photovoltaic Systems Engineering Utility Scale Development:
“Bankable” Construction Contracts
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework

Utility Project Development Project ProfitInvestment Technology Market Demand Risk Performance Schedule Cost

Project Development Organization Project CompanyEquity PartnersLenders EPC ContractorO&M ContractorFuel Supplier Offtaker Funding & Security AgreementsEquity Support Agreements EPC Contract O&M Contract Fuel Supply Agreement Power Purchase Agreement Tripartite Agreements

Project Company Information 1) Developer/Sponsor/Promoter Profile 2) Project status 3) Economics 4) Engineering/Feasibility Study 5) Equipment 6) Engineering, Procurement, and Construction (EPC) 7) Operation and Maintenance 8) Regulatory, legal 9) Taxation 10) Foreign Exchange 11) Insurance 12) Financing 13) Comprehensive risk analysis: technical or economic 14) Dispute resolution

1) Developer/Sponsor/Promoter Profile 2) Project status a) Status of key agreements b) Schedule to complete development c) Support for project 3) Economics a) Financial projections—Pro Forma b) Documentation of power pricing c) Documentation of operating expenses d) Disposition/refinancing/transfer

5) Engineering/Feasibility Study a) Site suitability b) Fuel procurement c) Proposed design, technology, cost d) Fuel and electrical interconnection e) Environmental impact, need for study, exemption f) Power purchaser load profile g) Water supply and discharge h) Ash disposal for solid fuel projects i) Emissions controls, options, cost j) Maintenance schedule, overhauls, spares k) Other site mitigation

6) Equipment a) Operational characteristics i) History in power application ii) Efficiency iii) Reliability iv) Availability v) Environmental b) Cost, payment schedule, delivery deposits c) Guarantees, creditworthiness for guarantees d) Financing considerations, export credit, vendor e) Technology, suitability for remote service

8) Engineering, Procurement, and Construction (EPC) a) EPC contractor: b) Contract terms: c) Guarantees, bonuses, penalties d) Insurance, retainage e) Construction schedule, penalties, damages f) Performance testing i) Output ii) Heat Rate iii) Availability iv) Duration of test, standards, derating v) Warranty period g) Start-up, training