EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
CONSOLIDATION ON CIVIL ENGINEERING AND TECHNICAL INFRASTRUCTURE P. Alves, M. Nonis, P. Pepinster, W. van Baaren 6 th ST Workshop – March 2003.
Detector Cooling Project Thermosiphon Project Status Report
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Associated detection/extinction systems D. Swoboda.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
LS1 Day EN-CV M. Nonis on behalf of CV group / CERN
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Cooling & Ventilation feed-back M. Nonis – EN/CV.
LS2 Cooling & Ventilation Activities M. Battistin EN/CV Acknowledgements: P. Barriere, R. Bozzi, A. Broche, O. Crespo,
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
TE-CRG Activities D. Delikaris, TE-CRG.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Update on the PSB Cooling and Ventilation Systems
EN-CV activities for LHC during LS2
FCC Tunnel and Shaft Cross Sections
Keeping LHC cold during LS periods Preliminary proposal
Accelerator and Experiment Interface Session: LS2, LS3
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
CV maintenance works during YETS
Cooling systems for HL-LHC (WP17.3)
EN-CV interventions during EYETS for PS and PSB
COOLING & VENTILATION INFRASTRUCTURE
ATLAS Thermosiphon Electrical Distribution and Run Modes
Insertable B Layer Cooling System
EN-CV: P8 systems and Detector Cooling
Presentation transcript:

EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group

Table of contents General overview LS1 Activities: – Work – Maintenance CV services during LS1 Commissioning Final considerations 2

General view CV interventions in LS1 Meyrin / PSSPS / ZNLHC / Experiment HVAC PS Cooling L4 Chilled water PS complex HVAC 513 PSB dump cooling Surface NA62 HVAC HVAC bldg 107 ELENA connection cooling Reverse osmosis 378 Mixed water 513 HVAC ISOLDE Cooling ISOLDE CCR HVAC BA3 piping for RF upgrade BA3 chilled water station Concrete refurb. bldg 863 Back up chiller BA4 Valves in BAs Tunnel safety valves replacem. Reject NA cooling towers Control chilled water stations Drain TT20 Regulation valves BA80, 81 and 82 Chilled water piping NA Tunnel air monitoring Delta p tunnel UAs - RAs R2E Collimators Point 7 Pumps UWs Wizcon replacement Landis replacement PM32 raising pumps York chillers replacement Thyristors replacement Chilled water Pt 2 Back up cooling SH5 Back up cryo cooling towers SF4 primary circuit Back up cryo Pt 1 Thermos. ATLAS 3 Operation, Maintenance, Commissioning

Issue: Very old installation, need urgent refurbishing (control system obsolete, no spare parts) Avoid build up of sand. Plant presently accessible only during technical stops. If system fails  level 3 alarm triggers within 12 minutes, overflow after 3 additional minutes. Action: Three new dry pumps (1+2 stand by duty). Replace the electrical and control cubicles. Modify the inclination of the bottom of the pit Keep the two existing back up pumps (operational during works) Each pump will still be supplied by three power sources: General services network / Pays de Gex / Secure network. Planning: Work: 3 months, from February MCHF PM32 Raising system 4

Pumps replacement in UWs All sector pumps (but 6-7) run at an excessive flow wrt nominal conditions (9 to 38%). Sectors 2-3 and 5-6: additional flow rate increase of 4%  stop for thermal protection on motor. No requests to increase flow rate in any sector (except collimators). Action New spare pump or replacement of existing + spare with new model. No piping modification. Planning: Work duration: 2 months During work no cooling for UPS in REs SectorPresent additional flow Sector % Sector % Sector % Sector 4-59 % Sector % Sector % Sector % Present working point Nominal working point 5

ATLAS Thermosiphon 6 Issue: increase reliability – no active components on the main circuit – no risk of pollution – redundancy of existing compressors kept – air condenser for warm operation (no cooling towers) – large inertia: the system can suffer short power cuts. Time constant to be tested (1 minute to 1 hour). reduce maintenance (overall) – presently maintenance on compressors /2 months: 3 days, 10 kCHF safety & environment: – no vibration: leak risk avoided (40 CHF/kg, GWP 8000) – RP: no need to open the C3F8 circuit (slightly radioactive). Surface UX15 cavern liquid tank USA15 cavern ATLAS ID Detector Normal operation evap. R404a Cascade condenser Water condenser R23 Warm operation evap. Air condenser C6F14 brine circuit Normal: -65°C to -70°C Warm: -15°C to -20°C C3F8C3F8 H2OH2O

Issue: Chilled water cooling does not match existing needs when external temperature around 32°C. ₋Temperature kept only for air supply in UX25, LHC tunnel, counting room PX24. No back up chiller is available unless no dehumidification needed, e.g. winter period. Action: Increase available power and restore redundancy of chilled water station. Adapt distribution circuit to the increased flow rates: pumps and pipeline (including in PM shaft). Planning Work duration 1year: Preparation work starting in Downtime of the station for 2 months (surface) and 6 months (underground). Chilled water - Point 2 7

Issue: Maintain the cooling of cryogenic equipment during maintenance and cleaning of the cooling towers at point 1, 4, 6 and 8 (legal constraint). Solve issue on Christmas 2014: – no stop. Improve of maintenance: ₋Full maintenance (3 weeks vs. 4 days). ₋Equipment and safety test on CV plant. Action: Additional cooling tower 6 MW + 2 pumps. Planning: Work phase: 2 months/Point. Cooling plant stopped during connection and commissioning: 2 weeks/Point. 3.6 MCHF. Back up for the primary cooling for cryo ATLASMagnets, ID, DSS, DCS1.5 MW tbc Pt 4, Pt 6, Pt 8Cryogenics6 MW

CCR HVAC Upgrade Issue Guarantee a high level of operational continuity in particular in case of power cut. Upgrade the cooling system to cope with existing and future needs. Separate chilled water plant from BA3. Minimize the shutdowns to exceptional situation. Action: New station in bldg 874: 4 AHU, 2 chillers, 2 hydraulic networks, 1 buffer tank. New water cooled racks circuit. Work: Around 1 year. Difficult work phasing to ensure the availability of the plant as long as possible Downtime of CCC cooling: 1 month. 9

Operation, maintenance and tests Several installations shall continue being operated throughout LS1 (see next slide). Intervention requests (drain/fill of circuits, flushing etc.) must be notified asap to be included in the detailed planning. Preventive maintenance interventions shall be made at the beginning of LS1 and before powering tests: – Extended maintenance (PHE opening, Doucet filters, one way valves…) CV needs to perform functional tests in order to ensure the functionality of the installations during operation: – Safety tests. – Valves manipulation (e.g: in concrete floor) – Degraded mode scenario (ventilation systems) During maintenance and tests, the availability of CV services shall be affected. 10

CV services available during LS1 in LHC No requests for CV during LS1 have been made (except CAST). CV will ensure only essential services: – Ventilation of underground and surface premises (tunnel, experimental areas, buildings…) but not the ones dedicated to specific equipment. – Chilled water only for ventilation purposes. – Compressed air. – Raising systems. – Drinking water supplies. – Fire hydrants network. – Ventilation in REs. Temporary stop of these installations might take place according to modification work or maintenance interventions to be performed. 11

Commissioning Commissioning of CV and users’ equipment requires a massive work for CV staff (e.g.: 137 connections in sector 1-2). Previous experience at the end of the LHC installation project, shows that the commissioning phase might encounter difficulties that would impact on the duration of the activity: – Continuous balancing of cooling circuits. – Air management in underground areas (open tunnel configuration). – Balancing of pressure difference between different areas. – Flushing (clogging of filters on sector cooling circuits). – Work coordination in case the circuits have to be drained to avoid damages on equipment (e.g.: current leads). 12

Final considerations CV involvement during LS1 is at the maximum of its capabilities in terms of workforce, it will be impossible to take into consideration new requests later in the year. Preparation of LS1 has to be completed by September 2012 (most important bids), therefore bids to be sent out in May! LS1 work start already in 2012 where possible General and detailed planning of work in each Point will represent a key factor of success (downtime period in each plant). Prolonged operation without maintenance during 2014 and 2015 will represent additional stress on installations, therefore it will be important to schedule maintenance intervention in 2014 whenever possible. 13

Thank you for your attention